Skip to content

Chapter 28 — LUMBER YARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS AND WOODWORKING FACILITIES

Section 2807 — STORAGE OF WOOD CHIPS AND HOGGED MATERIALS ASSOCIATED WITH TIMBER AND LUMBER PRODUCTION FACILITIES

2025 California Fire Code (Title 24, Part 9) · 2025 edition · updated 2026-07-29 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

2807.1 General.

The storage of wood chips and hogged materials associated with timber and lumber production facilities shall comply with Sections 2807.2 through 2807.5.

2807.2 Size of piles.

Piles shall not exceed 60 feet (18 288 mm) in height, 300 feet (91 440 mm) in width and 500 feet (152 m) in length. Piles shall be separated from adjacent piles or other exposures by approved fire apparatus access roads.

Exception: The fire code official is authorized to allow the pile size to be increased where additional fire protection is provided in accordance with Chapter 9. The increase shall be based on the capabilities of the system installed.

2807.3 Pile fire protection.

Automatic sprinkler protection shall be provided in conveyor tunnels and combustible enclosures that pass under a pile. Combustible or enclosed conveyor systems shall be equipped with an approved automatic sprinkler system.

2807.4 Material-handling equipment.

Approved material-handling equipment shall be readily available for moving wood chips and hogged material.

2807.5 Emergency plan.

The owner or operator shall develop a plan for monitoring, controlling and extinguishing spot fires. The plan shall be submitted to the fire code official for review and approval.

28-4 2025 CALIFORNIA FIRE CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

LUMBER YARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS AND WOODWORKING FACILITIES

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Fire Code (Title 24, Part 9)
2025 California Fire Code (Title 24, Part 9)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REQUIREMENTS
  4. Chapter 4 — EMERGENCY PLANNING AND PREPAREDNESS
  5. Chapter 5 — FIRE SERVICE FEATURES
  6. Chapter 6 — BUILDING SERVICES AND SYSTEMS
  7. Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
  8. Chapter 8 — INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHI…
  9. Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
  10. Chapter 10 — MEANS OF EGRESS
  11. Chapter 11 — CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
  12. Chapter 12 — ENERGY SYSTEMS
  13. Chapter 20 — AVIATION FACILITIES
  14. Chapter 21 — DRY CLEANING
  15. Chapter 22 — COMBUSTIBLE DUST-PRODUCING OPERATIONS
  16. Chapter 23 — MOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES
  17. Chapter 24 — FLAMMABLE FINISHES
  18. Chapter 25 — FRUIT AND CROP RIPENING
  19. Chapter 26 — FUMIGATION AND INSECTICIDAL FOGGING
  20. Chapter 27 — SEMICONDUCTOR FABRICATION FACILITIES
  21. Chapter 28 — LUMBER YARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS A…
  22. Chapter 29 — MANUFACTURE OF ORGANIC COATINGS
  23. Chapter 30 — INDUSTRIAL OVENS
  24. Chapter 31 — TENTS, TEMPORARY SPECIAL EVENT STRUCTURES AND OTH…
  25. Chapter 32 — HIGH-PILED COMBUSTIBLE STORAGE
  26. Chapter 33 — FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION
  27. Chapter 34 — TIRE REBUILDING AND TIRE STORAGE
  28. Chapter 35 — WELDING AND OTHER HOT WORK
  29. Chapter 36 — MARINAS
  30. Chapter 37 — COMBUSTIBLE FIBERS
  31. Chapter 38 — RESERVED
  32. Chapter 39 — PROCESSING AND EXTRACTION FACILITIES
  33. Chapter 40 — STORAGE OF DISTILLED SPIRITS AND WINES
  34. Chapter 41 — TEMPORARY HEATING AND COOKING OPERATIONS
  35. Chapter 48 — MOTION PICTURE AND TELEVISION PRODUCTION STUDIO S…
  36. Chapter 49 — REQUIREMENTS FOR WILDLAND-URBAN INTERFACE FIRE AR…
  37. Chapter 50 — HAZARDOUS MATERIALS—GENERAL PROVISIONS
  38. Chapter 51 — AEROSOLS
  39. Chapter 52 — RESERVED
  40. Chapter 53 — COMPRESSED GASES
  41. Chapter 54 — CORROSIVE MATERIALS
  42. Chapter 55 — CRYOGENIC FLUIDS
  43. Chapter 56 — EXPLOSIVES AND FIREWORKS
  44. Chapter 57 — FLAMMABLE AND COMBUSTIBLE LIQUIDS
  45. Chapter 58 — FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
  46. Chapter 59 — FLAMMABLE SOLIDS
  47. Chapter 60 — HIGHLY TOXIC AND TOXIC MATERIALS
  48. Chapter 61 — LIQUEFIED PETROLEUM GASES
  49. Chapter 62 — ORGANIC PEROXIDES
  50. Chapter 63 — OXIDIZERS, OXIDIZING GASES AND OXIDIZING CRYOGENI…
  51. Chapter 64 — PYROPHORIC MATERIALS
  52. Chapter 65 — PYROXYLIN (CELLULOSE NITRATE) PLASTICS
  53. Chapter 66 — UNSTABLE (REACTIVE) MATERIALS
  54. Chapter 67 — WATER-REACTIVE SOLIDS AND LIQUIDS
  55. Chapter 80 — REFERENCED STANDARDS
  56. Appendix Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON US…
  57. Appendix A — BOARD OF APPEALS
  58. Appendix B — FIRE-FLOW REQUIREMENTS FOR BUILDINGS
  59. Appendix BB — FIRE-FLOW REQUIREMENTS FOR BUILDINGS
  60. Appendix C — FIRE HYDRANT LOCATIONS AND DISTRIBUTION
  61. Appendix CC — FIRE HYDRANT LOCATIONS AND DISTRIBUTION
  62. Appendix D — FIRE APPARATUS ACCESS ROADS
  63. Appendix E — HAZARD CATEGORIES
  64. Appendix F — HAZARD RANKING
  65. Appendix G — CRYOGENIC FLUIDS—WEIGHT AND VOLUME EQUIVALENTS
  66. Appendix H — HAZARDOUS MATERIALS MANAGEMENT PLANS AND HAZARDOU…
  67. Appendix I — FIRE PROTECTION SYSTEMS—NONCOMPLIANT CONDITIONS
  68. Appendix J — BUILDING INFORMATION SIGN
  69. Appendix K — CONSTRUCTION REQUIREMENTS FOR EXISTING AMBULATORY…
  70. Appendix L — REQUIREMENTS FOR FIREFIGHTER AIR REPLENISHMENT SY…
  71. Appendix M — HIGH-RISE BUILDINGS—RETROACTIVE AUTOMATIC SPRINKL…
  72. Appendix N — INDOOR TRADE SHOWS AND EXHIBITIONS
  73. Appendix O — VALET TRASH AND RECYCLING COLLECTION IN GROUP R-2…
  74. Appendix P — TEMPORARY HAUNTED HOUSES, GHOST WALKS AND SIMILAR…
  75. Appendix Q — COMMUNITY WILDLAND-URBAN INTERFACE (WUI) FIRE HAZ…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.