Section 2104
California Building Code (Title 24, Part 2) · 2019 edition · updated 2026-09-12 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
2104.1 Masonry construction.¶
Masonry construction shall comply with the requirements of Sections 2104.1.1 through 2104.1.3 and with the requirements of either TMS 602 or TMS 604. [OSHPD 1R, 2 & 5] Architectural cast stone con- struction shall be considered as an alternative system.
2104.1.1 Support on wood. Masonry shall not be supported on wood girders or other forms of wood construction except as permitted in Section 2304.12.
2104.1.2 Molded cornices. Unless structural support and anchorage are provided to resist the overturning moment, the center of gravity of projecting masonry or molded cornices shall lie within the middle one-third of the supporting wall. Terra cotta and metal cornices shall be provided with a structural frame of approved noncombustible material anchored in an approved manner.
2104.2 Grouted masonry. [OSHPD 1R, 2 & 5]¶
2104.2.1 General conditions. Prior to grouting, the grout space shall be clean so that all spaces to be filled with grout do not contain mortar projections greater than 1 /4 inch (6.4 mm), mortar droppings and other foreign material.
All cells shall be solidly filled with grout.
Exception: Reinforced hollow-unit masonry laid in running bond used for freestanding site walls or inte- rior nonbearing nonshear wall partitions may be grouted only in cells containing vertical and horizontal reinforcement.
Reinforcement and embedded items shall be clean, properly positioned and securely anchored against move- ment prior to grouting. Bolts shall be accurately set with templates or by approved equivalent means and held in place to prevent dislocation during grouting. Reinforce- ment, embedded items and bolts shall be solidly embedded in grout. Anchor bolts in the face shells of hollow masonry units shall be positioned to maintain a minimum of 1 /2 inch of grout between the bolt and the face shell.
The grouting of any section of wall shall be completed in one day with no interruptions greater than one hour. At
MASONRY
the time of laying, all masonry units shall be free of dust and dirt.
Grout pours greater than 12 inches (300 mm) in height shall be consolidated by mechanical vibration during placement to fill the grout space before loss of plasticity, and reconsolidated by mechanical vibration to minimize voids due to water loss. Grout pours less than 12 inches in height may be puddled.
Between grout pours or where grouting has been stopped more than an hour, a horizontal construction joint shall be formed by stopping all wythes at the same eleva- tion and with the grout stopping a minimum of 1 1 /2 inches (38 mm) below a mortar joint, except at the top of the wall. Where bond beams occur, the grout pour shall be stopped a minimum of 1 /2 inch (12.7 mm) below the top of the masonry.
The construction documents shall completely describe grouting procedures, subject to approval of OSHPD.
2104.3 Aluminum equipment. [OSHPD 1R, 2 & 5]¶
Grout shall not be handled nor pumped utilizing aluminum equip- ment unless it can be demonstrated with the materials and equipment to be used that there will be no deleterious effect on the strength of the grout.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Building Code (Title 24, Part 2)
- Chapter 2 — DEFINITIONS AND ABBREVIATIONS
- Appendix G — FLOOD-RESISTANT
- Appendix L — EARTHQUAKE RECORDING
- Appendix M — TSUNAMI-GENERATED
- Chapter 1 — SCOPE AND ADMINISTRATION
- Chapter 3 — OCCUPANCY CLASSIFICATION AND USE
- Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED
- Chapter 5 — GENERAL BUILDING HEIGHTS AND AREAS
- Chapter 6 — TYPES OF CONSTRUCTION
- Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
- Chapter 7A — MATERIALS AND CONSTRUCTION
- Chapter 8 — INTERIOR FINISHES
- Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
- Chapter 10 — MEANS OF EGRESS
- Chapter 11A — HOUSING ACCESSIBILITY
- Chapter 11B — ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMM…
- Chapter 12 — INTERIOR ENVIRONMENT
- Chapter 14 — EXTERIOR WALLS
- Chapter 15 — ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
- Chapter 16 — STRUCTURAL DESIGN
- Chapter 16A — STRUCTURAL DESIGN
- Chapter 17 — SPECIAL INSPECTIONS AND TESTS
- Chapter 18 — SOILS AND FOUNDATIONS
- Chapter 19 — CONCRETE
- Chapter 20 — ALUMINUM
▸Chapter 21 — MASONRY
Overview- Section 2102
- Section 2101
- Section 2103
- Section 2104
- Section 2105
- Section 2106
- Section 2107
- Section 2108
- Section 2109
- Section 2110
- Section 2111
- Section 2112
- Section 2113
- Section 2114
- Section 2115
- Section 2102A
- Section 2103A
- Section 2101A
- Section 2104A
- Section 2105A
- Section 2106A
- Section 2107A
- Section 2111A
- Section 2108A
- Section 2109A
- Section 2110A
- Section 2112A
- Section 2113A
- Section 2114A
- Chapter 22 — STEEL
- Chapter 23 — WOOD
- Chapter 24 — GLASS AND GLAZING
- Chapter 25 — GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER
- Chapter 26 — PLASTIC
- Chapter 27 — ELECTRICAL
- Chapter 28 — MECHANICAL SYSTEMS
- Chapter 30 — ELEVATORS AND CONVEYING SYSTEMS
- Chapter 31 — SPECIAL CONSTRUCTION
- Chapter 31B — PUBLIC POOLS
- Chapter 31C — RADIATION
- Chapter 31D — FOOD ESTABLISHMENTS
- Chapter 31F — MARINE OIL TERMINALS
- Chapter 32 — ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
- Chapter 33 — SAFEGUARDS DURING CONSTRUCTION
- Chapter 35 — REFERENCED STANDARDS
- Appendix A — EMPLOYEE QUALIFICATIONS
- Appendix B — BOARD OF APPEALS
- Appendix C — GROUP U – AGRICULTURAL BUILDINGS
- Appendix D — FIRE DISTRICTS
- Appendix F — RODENTPROOFING
- Appendix H — SIGNS
- Appendix I — PATIO COVERS
- Appendix J — GRADING
- Appendix K — GROUP R-3 AND GROUP R-3.1 OCCUPANCIES
- Appendix N — REPLICABLE BUILDINGS
- Appendix O — EMERGENCY HOUSING