510.1 General.

The provisions in Sections 510.2 through 510.9 shall permit the use of special conditions that are exempt from, or modify, the specific requirements of this chapter regarding the allowable building heights and areas of buildings based on the occupancy classification and type of construction, provided the special condition complies with the provisions specified in this section for such condition and other applicable requirements of this code. The provisions of Sections 510.2 through 510.8 are to be considered independent and separate from each other.

510.2 Horizontal building separation allowance.

A building shall be considered as separate and distinct buildings for the purpose of determining area limitations, continuity of fire walls, limitation of number of stories and type of construction where the following conditions are met:

  1. The buildings are separated with a horizontal assembly having a fire-resistance rating of not less than 3 hours. Where a horizontal assembly contains vertical offsets, the vertical offset shall be constructed as a fire barrier in accordance with Section 707 and shall have a fire-resistance rating of not less than 3 hours.

  2. The building below, including the horizontal assembly and any associated vertical offsets, is of Type IA construction.

  3. Shaft, stairway, ramp and escalator enclosures through the horizontal assembly shall have not less than a 2-hour fire-resistance rating with opening protectives in accordance with Section 716. Exception: Where the enclosure walls below the horizontal assembly have not less than a 3-hour fire-resistance rating with opening protectives in accordance with Section 716, the enclosure walls extending above the horizontal assembly shall be permitted to have a 1-hour fire-resistance rating, provided that the following conditions are met:

  4. The building above the horizontal assembly is not required to be of Type I construction.

  5. The enclosure connects fewer than four stories.

  6. The enclosure opening protectives above the horizontal assembly have a fire protection rating of not less than 1 hour.

  7. Interior exit stairways located within the Type IA building are permitted to be of combustible materials where the following requirements are met: 4.1. The building above the Type IA building is of Type III, IV, or V construction. 4.2. The stairway located in the Type IA building is enclosed by 3-hour fire-resistance-rated construction with opening protectives in accordance with Section 716.

  8. The building or buildings above the horizontal assembly shall be Group A, B, M, R or S occupancies.

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

GENERAL BUILDING HEIGHTS AND AREAS

  1. The building below the horizontal assembly shall be protected throughout by an approved automatic sprinkler system in accordance with Section 903.3.1.1, and shall be permitted to be any occupancy allowed by this code except Group H.
  2. The maximum building height in feet (mm) shall not exceed the limits set forth in Section 504.3 for the building having the smaller allowable height as measured from the grade plane.

510.3 Group S-2 enclosed parking garage with Group S-2 open parking garage above.

A Group S-2 enclosed parking garage with not more than one story above grade plane and located below a Group S-2 open parking garage shall be classified as a separate and distinct building for the purpose of determining the type of construction where the following conditions are met:

  1. The allowable area of the building shall be such that the sum of the ratios of the actual area divided by the allowable area for each separate occupancy shall not exceed 1.
  2. The Group S-2 enclosed parking garage is of Type I or II construction and is at least equal to the fire-resistance requirements of the Group S-2 open parking garage.
  3. The height and the number of tiers of the Group S-2 open parking garage shall be limited as specified in Table 406.5.4.
  4. The floor assembly separating the Group S-2 enclosed parking garage and Group S-2 open parking garage shall be protected as required for the floor assembly of the Group S-2 enclosed parking garage. Openings between the Group S-2 enclosed parking garage and Group S-2 open parking garage, except exit openings, shall not be required to be protected.
  5. The Group S-2 enclosed parking garage is used exclusively for the parking or storage of private motor vehicles, but shall be permitted to contain an office, waiting room and toilet room having a total area of not more than 1,000 square feet (93 m [2] ) and mechanical equipment rooms associated with the operation of the building.

510.4 Parking beneath Group R.

Where a maximum one story above grade plane Group S-2 parking garage, enclosed or open, or combination thereof, of Type I construction or open of Type IV construction, with grade entrance, is provided under a building of Group R, the number of stories to be used in determining the minimum type of construction shall be measured from the floor above such a parking area. The floor assembly between the parking garage and the Group R above shall comply with the type of construction required for the parking garage and shall also provide a fire-resistance rating not less than the mixed occupancy separation required in Section 508.4.

510.5 Group R-1 and R-2 buildings of Type IIIA construction.

For buildings of Type IIIA construction in Groups R-1 and R-2, the maximum allowable height in Table 504.3 shall be increased by 10 feet (3048 mm) and the maximum allowable number of stories in Table 504.4 shall be increased by one where the first-floor assembly above the basement has a fire-resistance rating of not less than 3 hours and the floor area is subdivided by 2-hour fire-resistance-rated fire walls into areas of not more than 3,000 square feet (279 m [2] ).

510.6 Group R-1 and R-2 buildings of Type IIA construction.

The height limitation for buildings of Type IIA construction in Groups R-1 and R-2 shall be increased to nine stories and 100 feet (30 480 mm) where the building is separated by not less than 50 feet (15 240 mm) from any other building on the lot and from lot lines, the exits are segregated in an area enclosed by a 2-hour fire-resistancerated fire wall and the first floor assembly has a fire-resistance rating of not less than 1 [1] / 2 hours.

510.7 Open parking garage beneath Groups A, I, B, M and R.

Open parking garages constructed under Groups A, I, B, M and R shall not exceed the height and area limitations permitted under Section 406.5. The height and area of the portion of the building above the open parking garage shall not exceed the limitations in Section 503 for the upper occupancy. The height, in both feet and stories, of the portion of the building above the open parking garage shall be measured from grade plane and shall include both the open parking garage and the portion of the building above the parking garage.

510.7.1 Fire separation. Fire barriers constructed in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711 between the parking occupancy and the upper occupancy shall correspond to the required fire-resistance rating prescribed in Table 508.4 for the uses involved. The type of construction shall apply to each occupancy individually, except that structural members, including main bracing within the open parking structure, which is necessary to support the upper occupancy, shall be protected with the more restrictive fire-resistance-rated assemblies of the groups involved as shown in Table 601. Means of egress for the upper occupancy shall conform to Chapter 10 and shall be separated from the parking occupancy by fire barriers having not less than a 2-hour fire-resistance rating as required by Section 707 with self-closing doors complying with Section 716 or horizontal assemblies having not less than a 2-hour fire-resistance rating as required by Section 711, with self-closing doors complying with Section 716. Means of egress from the open parking garage shall comply with Section 406.5.

510.8 Group B or M buildings with Group S-2 open parking garage above.

Group B or M occupancies located below a Group S-2 open parking garage of a lesser type of construction shall be considered as a separate and distinct building from the Group S-2 open parking garage for the purpose of determining the type of construction where the following conditions are met:

  1. The buildings are separated with a horizontal assembly having a fire-resistance rating of not less than 2 hours.
  2. The occupancies in the building below the horizontal assembly are limited to Groups B and M.
  3. The occupancy above the horizontal assembly is limited to a Group S-2 open parking garage.
  4. The building below the horizontal assembly is of Type IA construction. Exception: The building below the horizontal assembly shall be permitted to be of Type IB or II construction, but not less than the type of construction required for the Group S-2 open parking garage above, where the building below is not greater than one story in height above grade plane.
  5. The height and area of the building below the horizontal assembly does not exceed the limits set forth in Section 503.

5-20 2025 CALIFORNIA BUILDING CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

GENERAL BUILDING HEIGHTS AND AREAS

  1. The height and area of the Group S-2 open parking garage does not exceed the limits set forth in Section 406.5. The height, in both feet and stories, of the Group S-2 open parking garage shall be measured from grade plane and shall include the building below the horizontal assembly.
  2. Exits serving the Group S-2 open parking garage shall discharge at grade with direct and unobstructed access to a street or public way and are separated from the building below the horizontal assembly by 2-hour fire barriers constructed in accordance with Section 707 or 2-hour horizontal assemblies constructed in accordance with Section 711, or both.

510.9 Multiple buildings above a horizontal assembly.

Where two or more buildings are provided above the horizontal assembly separating a Group S-2 parking garage or building below from the buildings above in accordance with the special provisions in Section 510.2, 510.3 or 510.8, the buildings above the horizontal assembly shall be regarded as separate and distinct buildings from each other and shall comply with all other provisions of this code as applicable to each separate and distinct building.

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

5-22 2025 CALIFORNIA BUILDING CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

CALIFORNIA BUILDING CODE – MATRIX ADOPTION TABLE

CHAPTER 6 – TYPES OF CONSTRUCTION

(Matrix Adoption Tables are nonregulatory, intended only as an aid to the code user. See Chapter 1 for state agency authority and building applications.)

Adopting agency BSC BSC-
CG
SFM HCD DSA OSHPD BSCC DPH AGR DWR CEC CA SL SLC
Adopting agency BSC BSC-
CG
SFM 1 2 1/AC AC SS SS/CC 1 1R 2 3 4 5 6 6 6 6 6 6 6 6 6
Adopt entire chapter X X X X X X X X X X
Adopt entire chapter as
amended (amended sections
listed below)
X X X
Adopt only those sections
that are listed below
Chapter / Section
Table 601 X
602.1 X
Table 602 X
602.4.1.5 X X
602.4.2.5 X X
602.4.3.5 X X
602.4.4.3 X X
603.1 X X
603.1.3 X X

The state agency does not adopt sections identified with the following symbol: The Office of the State Fire Marshal’s adoption of this chapter or individual sections is applicable to structures regulated by other state agencies pursuant to Section 1.11.

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

6-2 2025 CALIFORNIA BUILDING CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Building Code (Title 24, Part 2)
2025 California Building Code (Title 24, Part 2)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — OCCUPANCY CLASSIFICATION AND USE
  4. Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON OCCUPANCY A…
  5. Chapter 5 — GENERAL BUILDING HEIGHTS AND AREAS
  6. Chapter 6 — TYPES OF CONSTRUCTION
  7. Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
  8. Chapter 7A — MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR W…
  9. Chapter 8 — INTERIOR FINISHES
  10. Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
  11. Chapter 10 — MEANS OF EGRESS
  12. Chapter 11 — RESERVED
  13. Chapter 11A — HOUSING ACCESSIBILITY
  14. Chapter 11B — ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMM…
  15. Chapter 12 — INTERIOR ENVIRONMENT
  16. Chapter 13 — ENERGY EFFICIENCY
  17. Chapter 14 — EXTERIOR WALLS
  18. Chapter 15 — ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
  19. Chapter 16 — STRUCTURAL DESIGN
  20. Chapter 16A — STRUCTURAL DESIGN
  21. Chapter 17 — SPECIAL INSPECTIONS AND TESTS
  22. Chapter 17A — SPECIAL INSPECTIONS AND TESTS
  23. Chapter 18 — SOILS AND FOUNDATIONS
  24. Chapter 18A — SOILS AND FOUNDATIONS
  25. Chapter 19 — CONCRETE
  26. Chapter 19A — CONCRETE
  27. Chapter 20 — ALUMINUM
  28. Chapter 21 — MASONRY
  29. Chapter 21A — MASONRY
  30. Chapter 22 — STEEL
  31. Chapter 22A — STEEL
  32. Chapter 23 — WOOD
  33. Chapter 24 — GLASS AND GLAZING
  34. Chapter 25 — GYPSUM PANEL PRODUCTS AND PLASTER
  35. Chapter 26 — PLASTIC
  36. Chapter 27 — ELECTRICAL
  37. Chapter 28 — MECHANICAL SYSTEMS
  38. Chapter 29 — PLUMBING SYSTEMS
  39. Chapter 30 — ELEVATORS AND CONVEYING SYSTEMS
  40. Chapter 31 — SPECIAL CONSTRUCTION
  41. Chapter 31A — SYSTEMS FOR WINDOW CLEANING OR EXTERIOR BUILDING…
  42. Chapter 31B — PUBLIC POOLS
  43. Chapter 31C — RADIATION
  44. Chapter 31D — FOOD ESTABLISHMENTS
  45. Chapter 31F — MARINE OIL TERMINALS
  46. Chapter 32 — ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
  47. Chapter 33 — SAFEGUARDS DURING CONSTRUCTION
  48. Chapter 34 — RESERVED
  49. Chapter 35 — REFERENCED STANDARDS
  50. Appendix A — EMPLOYEE QUALIFICATIONS
  51. Appendix B — BOARD OF APPEALS
  52. Appendix C — GROUP U—AGRICULTURAL BUILDINGS
  53. Appendix D — FIRE DISTRICTS
  54. Appendix E — RESERVED
  55. Appendix F — RODENTPROOFING
  56. Appendix G — FLOOD-RESISTANT CONSTRUCTION
  57. Appendix H — SIGNS
  58. Appendix I — PATIO COVERS
  59. Appendix J — GRADING
  60. Appendix K — GROUP R-3 AND GROUP R-3.1 OCCUPANCIES PROTECTED B…
  61. Appendix L — EARTHQUAKE RECORDING INSTRUMENTATION
  62. Appendix M — TSUNAMI-GENERATED FLOOD HAZARDS
  63. Appendix N — REPLICABLE BUILDINGS
  64. Appendix O — PERFORMANCE-BASED APPLICATION
  65. Appendix P — SLEEPING LOFTS
  66. Appendix Q — EMERGENCY HOUSING

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.