Earlier editions: 2026-09
Big Bear Lake Municipal Code Ch. 16.04 Final Maps—requirements and Procedures
Big Bear Lake Municipal Code · 2026-10 edition · updated 2026-10-04 · Big Bear Lake
Cite as: Big Bear Lake Municipal Code Chapter 16.04 · Text as of 2026-10-04
16.04.010 - Content and form.¶
The content and form of final maps shall be governed by the provisions of the state Subdivision Map Act and the city's subdivision manual.
(Ord. 89-170 (part), 1989)
16.04.020 - Requirements.¶
A. Evidence of Title. The evidence of title required by this title shall be a certificate of title, a policy of title insurance, or title guarantee issued by a title company authorized by the laws of the state to write the same, showing the names of all persons having any record title interest in the land to be subdivided, together with the nature of their respective interest therein.
B. Street Naming. Prior to the recordation of a final map, street names shall be secured and approved in accordance with the city's policy on street naming and numbering as adopted by the city council.
C. Where final maps have been recorded for portions of a tentative tract map, the final map for the final increment of the tentative tract map shall contain the same number as the tentative tract map.
(Ord. 89-170 (part), 1989)
16.04.030 - Prerecordation process.¶
Final maps, together with any required improvement agreements and security, shall be submitted to the department of community development for review and preliminary determination as to:
A. Compliance with any conditions imposed on the approval of the tentative map which are tied to recordation of the map; and
B. Substantial conformance with the approved tentative map and any approved alterations thereof.
Each officer or department responsible for checking compliance of the final map shall report in writing to the subdivision committee as to the compliance or noncompliance of the final map with laws as to matters coming under their jurisdiction, together with a statement of the changes necessary thereon to cause such map to comply with the law. These reports shall be transmitted to the city engineer, and he shall include them with his transmittal of the final map to the appropriate approval body. If the final map fails to meet any of the requirements or conditions imposed by this title or the Subdivision Map Act, the map may be approved if, in the determination of the city engineer, the failure to meet the requirement or condition is the result of technical and inadvertent error in the original requirement or condition, and it does not materially affect the validity of the map.
(Ord. 89-170 (part), 1989)
16.04.040 - Copy of final map to city.¶
After recordation of the final map, the subdivider shall forward two copies of thirty-five millimeter microfilm aperture cards and one blue line print of the recorded final map to the city engineer.
(Ord. 89-170 (part), 1989)
Get a plain-English answer with a citation back to this text.
Ask AI about this code