Title 5 — BUSINESS LICENSES, TAXES AND REGULATIONS›Chapter 5.20 — CABLE TELEVISION REGULATIONS
Article XIV — CABLE SYSTEM CONSTRUCTION REQUIREMENTS
Big Bear Lake Municipal Code · 2026-09 edition · updated 2026-10-02 · Big Bear Lake
5.20.425 - Map and detailed plan to be provided within ninety days.¶
5.20.430 - City has power to review and approve construction plans.¶
5.20.435 - Franchisee's as-built drawings.¶
5.20.440 - Approval for construction or placement of equipment or facilities.¶
5.20.445 - Construction and operation deadline.¶
5.20.450 - Delay in system construction.¶
5.20.455 - Failure to proceed with construction and/or reconstruction.¶
5.20.460 - Service drops.¶
5.20.465 - Aerial and underground drops in excess of one hundred fifty feet are not to…¶
5.20.470 - Underground installation not to exceed standard installation if subscriber…¶
5.20.475 - Installation of A/B switches.¶
5.20.480 - System construction and operation—Annual proof of performance tests—Independent tests.¶
5.20.485 - Additional specifications—Standby power—National, state and local code requirements.¶
5.20.490 - Construction in city rights-of-way—Undergrounding—Relocation.¶
5.20.495 - Construction or installation requires encroachment permit.¶
5.20.500 - Temporary buildings.¶
5.20.505 - Access to trenches.¶
5.20.510 - Reciprocity.¶
5.20.515 - Availability and use of utility services.¶
5.20.520 - If city determines any part of facilities are harmful to health and safety…¶
5.20.525 - Franchisee to maintain system in conformance with FCC signal leakage rules.¶
5.20.530 - Franchisee to take all reasonable steps to prevent accidents.¶
5.20.535 - Notice of cable construction/repair to subscribers.¶
5.20.540 - Cable system design and architecture.¶
5.20.545 - Obstruction of city rights-of-way.¶
5.20.550 - Location of transmission and distribution structures.¶
5.20.555 - Permits required to be obtained prior to any physical work being performed on city streets.¶
5.20.560 - Detailed maps of entire system required prior to issuance of construction…¶
5.20.565 - Undergrounding of pedestals.¶
5.20.570 - Changes required by city improvements.¶
5.20.575 - Altering city facilities.¶
5.20.580 - Franchisee shall temporarily move its wires to permit moving of buildings.¶
5.20.585 - Replacement, repair and restoration of damage to city facilities.¶
5.20.590 - Failure to complete required work.¶
5.20.595 - Emergency work.¶
5.20.600 - Tree trimming.¶
5.20.605 - Removal and abandonment of property of franchisee.¶
5.20.610 - Abandonment of property.¶
5.20.615 - Removal of replaced plant or equipment.¶
5.20.620 - Line extension policy.¶
5.20.625 - Clean up.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code