CEBC · California Existing Building Code

Choosing a Compliance Method

The CEBC offers three mutually exclusive compliance methods (prescriptive, work‑area, performance); §301.3 and the chapter synopses identify which method and chapters apply.

Last reviewed: July 6, 2026

Overview

This part of the California Existing Building Code (CEBC) explains how to pick the regulatory path for alterations, additions or changes of occupancy to existing buildings. The code provides three mutually exclusive options: the Prescriptive Compliance Method, the Work Area Compliance Method, and the Performance Compliance Method — each with its own chapter-level requirements and triggers. Section §301.3 summarizes these choices and cross-references the applicable chapters: prescriptive (Chapter 5, §301.3.1), work-area (Chapters 6–11, §301.3.2) and performance (Chapter 13, §301.3.3) .

Why this matters: the chosen method determines the scope of required upgrades (what parts of the building must be improved and to what level), the applicable technical rules, and which chapters apply (Chapter 3 contains provisions that apply to all methods; Chapter 4 covers repairs; Chapter 14 addresses relocated buildings) . The applicant selects the method, and the CEBC generally does not permit combining the methods for the same scope of work — see §301.3 and related administrative provisions for limits and exceptions .

In this section

Code references

Grounded in the retrieved California Existing Building Code — click a citation to read the verbatim passage:

  • CEBC § 1.10.1 High relevance — show source text

    xii 2025 CALIFORNIA EXISTING BUILDING CODE

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    Chapter 3 Provisions for All Compliance Methods.

    Chapter 3 guides the use of the three compliance methods of the CEBC and provides requirements that apply globally. The globally applicable requirement include general requirements related to buildings materials and other applicable codes, storm shelters, structural loads, in-situ load tests, accessibility, smoke alarms, carbon monoxide detection and exterior wall coverings.

    Chapter 3A Provisions for All Compliance Methods.

    Chapter 3A controls the compliance options for alteration, repair, addition, evaluation and change of occupancy of existing structures regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

    Chapter 4 Repairs.

    Chapter 4, a chapter independent of the three compliance methods, governs the repair of existing buildings. The provisions define conditions under which repairs may be made using materials and methods like those of the original construction or the extent to which repairs must comply with requirements for new buildings.

    Chapter 4A Repairs.

    Chapter 4A governs the repair of existing buildings regulated by the Department of Health Care Access and Information/Office of State- wide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

    Chapter 5 Prescriptive Compliance Method.

    Chapter 5 provides one of the three main options of compliance available in the CEBC for buildings and structures undergoing alteration, addition or change of occupancy. The base requirements are more administrative in nature. The structural triggers for upgrades are consistent with the Work Area Method.

    Chapter 5A Prescriptive Compliance Method.

    Chapter 5A provides details for the prescriptive compliance method for alteration, addition and change of occupancy of existing build- ings and structures regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

    Chapter 6 Classification of Work.

    Chapter 6 provides an overview of the Work Area Method and defines the different classifications of work including alterations, change of occupancy, additions and historic buildings. Detailed requirements for all of these are given in subsequent Chapters 7 through 11.

    Chapter 7 Alterations—Level 1.

    Chapter 7 provides the technical requirements for those existing buildings that undergo Level 1 alterations as described in Section 602, which includes replacement or covering of existing materials, elements, equipment or fixtures using new materials for the same purpose. This chapter is distinguished from Chapters 8 and 9 by only involving replacement of building components with new components with no reconfiguration of space.

    Chapter 8 Alterations—Level 2.

    A Level 2 alteration is an alteration involving space reconfiguration that could be up to and including 50 percent of the area of the building or addition of a new building system. Level 2 alterations also include the extension or addition of any system or equipment. The purpose of Chapter 8 is to provide detailed requirements and provisions to identify the required improvements in the existing building elements, means of egress, fire protection, structural systems, energy efficiency, and other building systems include electrical, mechanical and plumbing when a building is being altered.

    Chapter 9 Alterations—Level 3.

  • CBC § 301 High relevance — show source text

    This code provides three main options for a designer in dealing with alterations of existing buildings. These are laid out in Section 301 of this code:

    Option 1: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Prescriptive Compliance Method given in Chapter 5. It should be noted that this method originates from the former Chapter 34 of the IBC (2012 and earlier editions).

    Option 2: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Work Area Compliance Method given in Chapters 6 through 12.

    2025 CALIFORNIA EXISTING BUILDING CODE xi

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    Option 3: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Performance Compliance Method given in Chapter 13. It should be noted that this option was also provided in the former Chapter 34 of the IBC (2012 and earlier editions).

    Under limited circumstances, a building alteration can be made to comply with the laws under which the building was originally built, as long as the accessibility requirements are met, there has been no substantial structural damage and there will be limited structural alteration. Flood hazard provisions also must still be addressed where there is a substantial improvement.

    Note that all repairs must comply with Chapter 4 and all relocated buildings are addressed by Chapter 14.

    ARRANGEMENT AND FORMAT OF THE 2025 CEBC

    The format of the CEBC allows each chapter to be devoted to a particular subject. The following table shows how the CEBC is divided. The subsequent table shows CEBC requirements that are correlated with other California Codes. The chapter synopses detail the scope and intent of the provisions of the CEBC.

    CHAPTER TOPICS Col2
    CHAPTER SUBJECTS
    1, 2 Administrative Requirements and Definitions
    3 Provisions for all Compliance Methods
    4 Repairs
    5 Prescriptive Compliance Method for Existing Buildings
    6–11 Work Area Compliance Method for Existing Buildings
    13 Performance Compliance Method for Existing Buildings
    14 Relocated Buildings
    15 Construction Safeguards
    16 Referenced Standards
    Appendix A Guidelines for Seismic Retrofit of Existing Buildings
    Appendix B Supplementary Accessibility Requirements for Existing Buildings
    Appendix C Guidelines for Wind Retrofit of Existing Buildings
    Appendix D Board of Appeals
    Appendix E Temporary Emergency Uses
    Resource A Guidelines on Fire Ratings of Archaic Materials and Assemblies

    CALIFORNIA BUILDING CODE CORRELATED TOPICS

    The CEBC requirements for construction safeguards are directly correlated to the requirements of the CBC. The following table shows chapters of the CBC that are correlated with the CEBC:

    CEBC/CBC CORRELATED TOPICS Col2 Col3
    CEBC CHAPTER/SECTION CBC CHAPTER/SECTION SUBJECT
    Chapter 15 Chapter 33 Construction safeguards

    Chapter 1 Scope and Administration.

    Chapter 1 establishes the limits of applicability of the code and describes how the code is to be applied and enforced. The provisions of Chapter 1 establish the authority and duties of the code official appointed by the authority having jurisdiction and also establish the rights and privileges of the design professional, contractor and property owner.

    Chapter 2 Definitions.

  • CBC § 301 Medium relevance — show source text

    The IEBC is a model code in the International Code family of codes intended to provide requirements for repair and alternative approaches for alterations, changes of occupancy and additions to existing buildings. A large number of existing buildings and structures do not comply with the current building code requirements for new construction. Although many of these buildings are potentially salvageable, rehabilitation is often cost-prohibitive because compliance with all the requirements for new construction could require extensive changes that go well beyond the value of the building or the original scope of the alteration. At the same time, it is necessary to regulate construction in existing buildings that undergo additions, alterations, extensive repairs or change of occupancy. Such activity represents an opportunity to ensure that new construction complies with the current building codes and that existing conditions are maintained, at a minimum, to their current level of compliance or are improved as required to meet basic safety levels. To accomplish this objective, and to make the alteration process easier, this code allows for options for controlled departure from full compliance with the International Codes dealing with new construction, while maintaining basic levels for fire safety, structural and life safety features of the rehabilitated building.

    This code provides three main options for a designer in dealing with alterations of existing buildings. These are laid out in Section 301 of this code:

    Option 1: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Prescriptive Compliance Method given in Chapter 5. It should be noted that this method originates from the former Chapter 34 of the IBC (2012 and earlier editions).

    Option 2: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Work Area Compliance Method given in Chapters 6 through 12.

    2025 CALIFORNIA EXISTING BUILDING CODE xi

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    Option 3: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Performance Compliance Method given in Chapter 13. It should be noted that this option was also provided in the former Chapter 34 of the IBC (2012 and earlier editions).

    Under limited circumstances, a building alteration can be made to comply with the laws under which the building was originally built, as long as the accessibility requirements are met, there has been no substantial structural damage and there will be limited structural alteration. Flood hazard provisions also must still be addressed where there is a substantial improvement.

    Note that all repairs must comply with Chapter 4 and all relocated buildings are addressed by Chapter 14.

    ARRANGEMENT AND FORMAT OF THE 2025 CEBC

    The format of the CEBC allows each chapter to be devoted to a particular subject. The following table shows how the CEBC is divided. The subsequent table shows CEBC requirements that are correlated with other California Codes. The chapter synopses detail the scope and intent of the provisions of the CEBC.

  • CEBC § 1.10.1 Medium relevance — show source text
    CHAPTER TOPICS Col2
    CHAPTER SUBJECTS
    1, 2 Administrative Requirements and Definitions
    3 Provisions for all Compliance Methods
    4 Repairs
    5 Prescriptive Compliance Method for Existing Buildings
    6–11 Work Area Compliance Method for Existing Buildings
    13 Performance Compliance Method for Existing Buildings
    14 Relocated Buildings
    15 Construction Safeguards
    16 Referenced Standards
    Appendix A Guidelines for Seismic Retrofit of Existing Buildings
    Appendix B Supplementary Accessibility Requirements for Existing Buildings
    Appendix C Guidelines for Wind Retrofit of Existing Buildings
    Appendix D Board of Appeals
    Appendix E Temporary Emergency Uses
    Resource A Guidelines on Fire Ratings of Archaic Materials and Assemblies

    CALIFORNIA BUILDING CODE CORRELATED TOPICS

    The CEBC requirements for construction safeguards are directly correlated to the requirements of the CBC. The following table shows chapters of the CBC that are correlated with the CEBC:

    CEBC/CBC CORRELATED TOPICS Col2 Col3
    CEBC CHAPTER/SECTION CBC CHAPTER/SECTION SUBJECT
    Chapter 15 Chapter 33 Construction safeguards

    Chapter 1 Scope and Administration.

    Chapter 1 establishes the limits of applicability of the code and describes how the code is to be applied and enforced. The provisions of Chapter 1 establish the authority and duties of the code official appointed by the authority having jurisdiction and also establish the rights and privileges of the design professional, contractor and property owner.

    Chapter 2 Definitions.

    Chapter 2 is the repository of the definitions of terms used in the body of the code. The user of the code should be familiar with and consult this chapter because the definitions are essential to the correct interpretation of the code and because the user may not be aware that a term is defined.

    xii 2025 CALIFORNIA EXISTING BUILDING CODE

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    Chapter 3 Provisions for All Compliance Methods.

    Chapter 3 guides the use of the three compliance methods of the CEBC and provides requirements that apply globally. The globally applicable requirement include general requirements related to buildings materials and other applicable codes, storm shelters, structural loads, in-situ load tests, accessibility, smoke alarms, carbon monoxide detection and exterior wall coverings.

    Chapter 3A Provisions for All Compliance Methods.

    Chapter 3A controls the compliance options for alteration, repair, addition, evaluation and change of occupancy of existing structures regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

    Chapter 4 Repairs.

    Chapter 4, a chapter independent of the three compliance methods, governs the repair of existing buildings. The provisions define conditions under which repairs may be made using materials and methods like those of the original construction or the extent to which repairs must comply with requirements for new buildings.

    Chapter 4A Repairs.

    Chapter 4A governs the repair of existing buildings regulated by the Department of Health Care Access and Information/Office of State- wide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

  • CEBC § 1.10.1 Medium relevance — show source text

    Chapter 5A Prescriptive Compliance Method.

    Chapter 5A provides details for the prescriptive compliance method for alteration, addition and change of occupancy of existing build- ings and structures regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development, which include hospitals and correctional treatment centers (applications listed in Sections 1.10.1 (OSHPD 1).

    Chapter 6 Classification of Work.

    Chapter 6 provides an overview of the Work Area Method and defines the different classifications of work including alterations, change of occupancy, additions and historic buildings. Detailed requirements for all of these are given in subsequent Chapters 7 through 11.

    Chapter 7 Alterations—Level 1.

    Chapter 7 provides the technical requirements for those existing buildings that undergo Level 1 alterations as described in Section 602, which includes replacement or covering of existing materials, elements, equipment or fixtures using new materials for the same purpose. This chapter is distinguished from Chapters 8 and 9 by only involving replacement of building components with new components with no reconfiguration of space.

    Chapter 8 Alterations—Level 2.

    A Level 2 alteration is an alteration involving space reconfiguration that could be up to and including 50 percent of the area of the building or addition of a new building system. Level 2 alterations also include the extension or addition of any system or equipment. The purpose of Chapter 8 is to provide detailed requirements and provisions to identify the required improvements in the existing building elements, means of egress, fire protection, structural systems, energy efficiency, and other building systems include electrical, mechanical and plumbing when a building is being altered.

    Chapter 9 Alterations—Level 3.

    Chapter 9 provides the technical requirements for those existing buildings that undergo Level 3 alterations. Level 3 alterations are those involving alterations that cover 50 percent of the aggregate area of the building. Under certain situations, this chapter also intends to improve the safety of certain building features beyond the work area and in other parts of the building where no alteration work might be taking place.

    Chapter 10 Change of Occupancy.

    The purpose of Chapter 10 is to address existing buildings that are subject to a change of occupancy. This chapter is an assembly of requirements to upgrade safety without having to comply fully as a new building. A change of occupancy classification is considered a change of occupancy, however, it will involve a higher level of regulation since the use of the building has made a more significant change.

    2025 CALIFORNIA EXISTING BUILDING CODE xiii

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    Chapter 11 Additions.

    Chapter 11 provides the requirements for additions, which are considered new construction. The requirements focus on safely integrating the addition with the existing building. This includes issues such as limiting the overall height and area of the building where the addition is not separated by a fire wall.

    Chapter 12 Historic Buildings —Reserved

    Chapter 12 is not adopted by the State of California. Historic buildings and structures shall comply with Part 8, Title 24, California Code of Regulations.

    Chapter 13 Performance Compliance Methods.

    Chapter 13 allows for existing buildings to be evaluated to show that alterations or a change of occupancy, while not meeting new construction requirements, will provide a level of safety to demonstrate compliance. Provisions are based on a numerical scoring system involving 21 safety parameters where, when evaluated, such buildings must meet a minimum overall safety score.

  • CEBC § 301.3.2 Medium relevance — show source text

    301.3.2 Work area compliance method. A lterations, additions and changes of occupancy complying with the applicable requirements of Chapters 6 through 12 of this code shall be considered in compliance with the provisions of this code.

    301.3.3 Performance compliance method. Alterations, additions and changes of occupancy complying with Chapter 13 of this code shall be considered in compliance with the provisions of this code.

    Note: [HCD 1 & HCD 2] The provisions contained in Chapter 13 are not adopted by HCD, but may be available for adoption by a local ordinance. (See Section 1.1.11.)

    301.4 Relocated or moved buildings. Relocated or moved buildings shall comply with the requirements of Chapter 14.

    SECTION 302—GENERAL PROVISIONS

    302.1 Dangerous conditions. The code official shall have the authority to require the elimination of conditions deemed dangerous.

    302.1.1 Dangerous conditions. [BSC] Regardless of the extent of structural or nonstructural damage, the code official shall have the authority to require the elimination of conditions deemed dangerous.

    302.2 Additional codes. Alterations, repairs, additions and changes of occupancy to, or relocation of, existing buildings and structures shall comply with the provisions for alterations, repairs, additions and changes of occupancy or relocation, respectively, in this code and the California Energy Code, California Fire Code, California Mechanical Code, California Plumbing Code, California Residential Code and California Electrical Code . Where provisions of the other codes conflict with provisions of this code, the provisions of this code shall take precedence.

    302.2.1 Additional codes in health care. In existing Group I-2 occupancies, ambulatory health care facilities, outpatient clinics and hyperbaric facilities, alterations, repairs, additions and changes of occupancy to, or relocation of, existing buildings and structures shall also comply with NFPA 99.

    302.3 Existing materials. Materials already in use in a building in compliance with requirements or approvals in effect at the time of their erection or installation shall be permitted to remain in use unless determined by the code official to be unsafe.

    302.4 New and replacement materials. Except as otherwise required or permitted by this code, materials permitted by the applicable code for new construction shall be used. Like materials shall be permitted for repairs and alterations, provided that unsafe conditions are not created. Hazardous materials shall not be used where the code for new construction would not permit their use in buildings of similar occupancy, purpose and location. [HCD 1] Local ordinances or regulations shall permit the replacement, retention and extension of original materials, and the use of original methods of construction, for any building or accessory structure, provided such building or structure complied with the building code provisions in effect at the time of original construction and the building or accessory structure does not become or continue to be a substandard building. For additional information, see Health and Safety Code Sections 17912, 17920.3, 17922(d), 17922.3, 17958.8 and 17958.9.

    Exception: No replacement residential garage door shall be installed to connect the replacement door to an existing residential automatic garage door opener that does not have a battery backup function designed to keep the garage door operational without interruption during an electrical outage. See Health and Safety Code Section 19892.

  • CEBC § 3-3 Medium relevance — show source text

    2025 CALIFORNIA EXISTING BUILDING CODE 3-3

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    PROVISIONS FOR ALL COMPLIANCE METHODS

    members added as part of the alteration shall comply with the California Building Code . This exception shall not apply to the following:

    1. Alterations for accessibility required by the California Building Code, Chapter 11A.

    2. Alterations that constitute substantial improvement in flood hazard areas, which shall comply with Sections 503.2, 701.3 or 1303.1.3.

    3. Structural provisions of Section 304, Chapter 5 or to the structural provisions of Sections 706, 805 and 906.

    301.3.1 Prescriptive compliance. Alterations, additions and changes of occupancy complying with Chapter 5 of this code in buildings complying with the California Fire Code shall be considered in compliance with the provisions of this code.

    Exception: Hospital buildings removed from acute care service, skilled nursing facilities, intermediate-care facilities, correctional treatment centers and acute psychiatric hospitals [OSHPD 1R, 2, 4 and 5]. The provisions of adopted sections in Chapters 3 through 5 shall control the alteration, repair and change of occupancy or function of existing structures for applications listed in Section 1.10.1, 1.10.2, 1.10.4 and 1.10.5 regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development (OSHPD). Refer to Chapter 3A for services, systems and utilities that serve OSHPD 1 buildings.

    301.3.2 Work area compliance method. A lterations, additions and changes of occupancy complying with the applicable requirements of Chapters 6 through 12 of this code shall be considered in compliance with the provisions of this code.

    301.3.3 Performance compliance method. Alterations, additions and changes of occupancy complying with Chapter 13 of this code shall be considered in compliance with the provisions of this code.

    Note: [HCD 1 & HCD 2] The provisions contained in Chapter 13 are not adopted by HCD, but may be available for adoption by a local ordinance. (See Section 1.1.11.)

    301.4 Relocated or moved buildings. Relocated or moved buildings shall comply with the requirements of Chapter 14.

    SECTION 302—GENERAL PROVISIONS

    302.1 Dangerous conditions. The code official shall have the authority to require the elimination of conditions deemed dangerous.

    302.1.1 Dangerous conditions. [BSC] Regardless of the extent of structural or nonstructural damage, the code official shall have the authority to require the elimination of conditions deemed dangerous.

    302.2 Additional codes. Alterations, repairs, additions and changes of occupancy to, or relocation of, existing buildings and structures shall comply with the provisions for alterations, repairs, additions and changes of occupancy or relocation, respectively, in this code and the California Energy Code, California Fire Code, California Mechanical Code, California Plumbing Code, California Residential Code and California Electrical Code . Where provisions of the other codes conflict with provisions of this code, the provisions of this code shall take precedence.

  • CEBC § 1001.3 Medium relevance — show source text

    1001.3 Change of Occupancy Chapter 10, 101.2, 101.3, 101.4, 104.3, 104.3.2, 106.2.6, 110.1, 115.5, 202, 301.1, 301.3, 307.1, 308.1, 501.1, 505.3, 506, 601.1, 605, 702.5, 1301.1, 1302.1, 1302.1.6, 1304.1.1, 1304.1.3, 1305.2.17, 1307.1.1, 1401.2, B101.2, B101.3, B101.4, C101.1, C201.1 Change of Use 202 Classroom Acoustics 502.6, 503.16, 506.6, 903.4, 1011.4, 1101.4 Code Official Chapter 1, 202, 301.3, 302.1, 302.3, 303.2.1, 304.2, 405.2.3.1, 501.2, 506.1, 506.1.1, 802.6, 804.2, 1001.2, 1011.5.1, 1303.1, 1303.1.1, 1304.1.2, 1304.1.3, 1402.7, 1501.6.7, 1509.1, A102.2, A107.1, A108.1, A113.7, A205.3.2, A301.1, A301.2, A301.3, A302.1, A303.1, A304.2.1, A304.2.2, A304.2.3, Table A304.2.3(1), A304.2.3(2), Table A304.2.3(2), A304.5, A403.8, A403.9.3.2, A404.1, A405.3, A405.3.2 Compartmentation 1305.2.3, Table 1305.2.3, 1305.2.20, Table 1305.2.20, Table

    1306.1 Compliance Methods Chapter 3 Performance compliance method Chapter 13, 301.3.3 Prescriptive compliance method Chapter 5, 301.3.1 Work area compliance method Chapter 6, Chapter 7, Chapter 8, Chapter 9, Chapter 10, Chapter 11, 301.3.2

  • CEBC § 301.3 Medium relevance — show source text

    202, 301.3, 302.1, 302.3, 303.2.1, 304.2, 405.2.3.1, 501.2, 506.1, 506.1.1, 802.6, 804.2, 1001.2, 1011.5.1, 1303.1, 1303.1.1, 1304.1.2, 1304.1.3, 1402.7, 1501.6.7, 1509.1, A102.2, A107.1, A108.1, A113.7, A205.3.2, A301.1, A301.2, A301.3, A302.1, A303.1, A304.2.1, A304.2.2, A304.2.3, Table A304.2.3(1), A304.2.3(2), Table A304.2.3(2), A304.5, A403.8, A403.9.3.2, A404.1, A405.3, A405.3.2 Compartmentation 1305.2.3, Table 1305.2.3, 1305.2.20, Table 1305.2.20, Table

    1306.1 Compliance Methods Chapter 3 Performance compliance method Chapter 13, 301.3.3 Prescriptive compliance method Chapter 5, 301.3.1 Work area compliance method Chapter 6, Chapter 7, Chapter 8, Chapter 9, Chapter 10, Chapter 11, 301.3.2

    Conflict 102.1, 102.4.1, 102.4.2, 104.2.4.1, 113.1, 302.2, 1302.1.2 Construction Documents 104.3, 105.3, 105.3.1, 105.4, 106, 113.4, 202, 601.2, A105.4, A205.3, A301.1, A406, A407.1 Construction Safeguards 101.5, Chapter 15 Accessibility 1511 Adjoining property 1505 Automatic sprinklers 1510 Fire extinguishers 1507 Means of egress 1508 Owner’s responsibilities 1502 Protection of pedestrians 1504 Sanitary 1503 Standpipes 1509 Water supply 1512 Corridor

    Dead-end 801.4, 804.8, 1011.5.1, 1305.2.12, 1305.2.12.1, Table 1306.1 Doors 804.7.1, 1011.5.1 Exit access 801.4, 802.2.1, 802.4, 802.4.1, 901.2, 1011.8.2 Openings 804.7, 804.7.1, 804.7.2, 804.7.3, 804.7.3.1, 804.7.4, 1011.5.1,

    1011.8.2

  • CRC § 301 Medium relevance — show source text

    This change expands the current process from two independent 1-year cycles to a single continuous 3year cycle. There will be two groups of code development committees and they will meet in separate years. The current groups will be reworked. With the energy provisions of the International Energy Conservation Code ® (IECC®) and Chapter 11 of the International Residential Code ® (IRC®) now moved to the Code Council’s Standards Development Process, the reduced volume of code changes will be distributed between Groups A and B.

    Code change proposals submitted for code sections that have a letter designation in front of them will be heard by the respective committee responsible for such code sections. Because different committees hold Committee Action Hearings in different years, proposals for most codes will be heard by committees in both the 2024 (Group A) and the 2025 (Group B) code development cycles. It is very important that anyone submitting code change proposals understands which code development committee is responsible for the section of the code that is the subject of the code change proposal.

    Please visit the ICC website at iccsafe.org/products-and-services/i-codes/code-development/current-code-development-cycle for further information on the Code Development Committee responsibilities as it becomes available.

    Coordination of the I-Codes

    The coordination of technical provisions allows the I-Codes to be used as a complete set of complementary documents. Individual codes can also be used in subsets or as stand-alone documents. Some technical provisions that are relevant to more than one subject area are duplicated in multiple model codes.

    INTRODUCTION TO THE INTERNATIONAL EXISTING BUILDING CODE

    The IEBC establishes minimum requirements for existing buildings using prescriptive and performance-related provisions. It is founded on broad-based principles intended to encourage the use and reuse of existing buildings while requiring reasonable upgrades and improvements.

    The IEBC is a model code in the International Code family of codes intended to provide requirements for repair and alternative approaches for alterations, changes of occupancy and additions to existing buildings. A large number of existing buildings and structures do not comply with the current building code requirements for new construction. Although many of these buildings are potentially salvageable, rehabilitation is often cost-prohibitive because compliance with all the requirements for new construction could require extensive changes that go well beyond the value of the building or the original scope of the alteration. At the same time, it is necessary to regulate construction in existing buildings that undergo additions, alterations, extensive repairs or change of occupancy. Such activity represents an opportunity to ensure that new construction complies with the current building codes and that existing conditions are maintained, at a minimum, to their current level of compliance or are improved as required to meet basic safety levels. To accomplish this objective, and to make the alteration process easier, this code allows for options for controlled departure from full compliance with the International Codes dealing with new construction, while maintaining basic levels for fire safety, structural and life safety features of the rehabilitated building.

    This code provides three main options for a designer in dealing with alterations of existing buildings. These are laid out in Section 301 of this code:

    Option 1: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Prescriptive Compliance Method given in Chapter 5. It should be noted that this method originates from the former Chapter 34 of the IBC (2012 and earlier editions).

    Option 2: Work for alteration, change of occupancy or addition of all existing buildings shall be done in accordance with the Work Area C

  • CEBC § 501.1 Medium relevance — show source text

    1|X|||X|X|||||||||||||||||||| |501.1 –501.3|||X|||||||||||||||||||||| |501.1.2|X|||||||||||||||||||||||| |501.3||||†|†|†||||||||||||||||||| |501.4501.5.1|||X|||||||||||||||||||||| |501.5||||X||||||||||||||||||||| |502|||||||||||X|X||X|X|||||||||| |502.1|X||X|X|X|||||||||||||||||||| |502.1.2|||X|||||||||||||||||||||| |502.2 –502.3|X|||||||||||||||||||||||| |502.5|X||X|†|†|†||||||||||||||||||| |502.6||||†|†|†||||||||||||||||||| |503|||||||||||X|X||X|X|||||||||| |503.1|X||X|||||||||||||||||||||| |503.2|X|||||||||||||||||||||||| |503.3|X|||||||X|X|||||||||||||||| |503.14|||X|†|†|†||||||||||||||||||| |503.15|||X|||||||||||||||||||||| |503.16 –503.17|||X|†|†|†||||||||||||||||||| |503.18||||†|†|†||||||||||||||||||| |503.19|||X|†|†|†||||||||||||||||||| |503.20|||X|||||||||||||||||||||| |504|||X|†|†|†|||||X|X||X|X|||||||||| |505|||X||||||||X|X||X|X|||||||||| |505.2||||X|X|||||||||||||||||||| |506|||||||||||X|X||X|X|||||||||| |506.1 –506.1.1|X||X|||||||||||||||||||||| |506.1.2|||||||||||X|X||X|X|||||||||| |506.2 – 506.3|X||X|||||||||||||||||||||| |506.4|||X|||||||||||||||||||||| |506.5_ Exception_|X|||||||||||||||||||||||| |506.6||||†|†|†|||||||||||||||||||

    The state agency does not adopt sections identified with the following symbol: The Office of the State Fire Marshal’s adoption of this chapter or individual sections is applicable to structures regulated by other state agencies pursuant to Section 1.11.

    2025 CALIFORNIA EXISTING BUILDING CODE 5-1

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    5-2 2025 CALIFORNIA EXISTING BUILDING CODE

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    5 PRESCRIPTIVE COMPLIANCE METHOD

    User notes:

    About this chapter: Chapter 5 provides details for the prescriptive compliance method—one of the three main options of compliance available in this code for buildings and structures undergoing alteration, addition or change of occupancy.

    SECTION 501—GENERAL

  • CEBC § 1.10.1 Medium relevance — show source text

    **_ The provisions of adopted sections in Chapters 3 through 5 shall control the alteration, repair and change of occupancy or function of existing structures for applications listed in Section 1.10.1, 1.10.2, 1.10.4 and 1.10.5 regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development (OSHPD). Functional service spaces shall comply with the requirements in the California Building Code, Sections 1224, 1225, 1226, 1227 and 1228.

    301.1.1 Bleachers, folding and telescopic seating and grandstands. Existing bleachers, folding and telescopic seating and grandstands shall comply with ICC 300.

    301.2 Repairs. Repairs shall comply with the requirements of Chapter 4.

    301.3 Alteration, addition or change of occupancy. The alteration, addition or change of occupancy of all existing buildings shall comply with one of the methods listed in Section 301.3.1, 301.3.2 or 301.3.3 as selected by the applicant. Sections 301.3.1 through 301.3.3 shall not be applied in combination with each other. [OSHPD 1R, 2, 4 and 5] Sections 301.3.2 and 301.3.3, not adopted by OSHPD.

    Exception: Subject to the approval of the code official, alterations complying with the laws in existence at the time the building or the affected portion of the building was built shall be considered in compliance with the provisions of this code. New structural

    2025 CALIFORNIA EXISTING BUILDING CODE 3-3

    on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

    PROVISIONS FOR ALL COMPLIANCE METHODS

    members added as part of the alteration shall comply with the California Building Code . This exception shall not apply to the following:

    1. Alterations for accessibility required by the California Building Code, Chapter 11A.

    2. Alterations that constitute substantial improvement in flood hazard areas, which shall comply with Sections 503.2, 701.3 or 1303.1.3.

    3. Structural provisions of Section 304, Chapter 5 or to the structural provisions of Sections 706, 805 and 906.

    301.3.1 Prescriptive compliance. Alterations, additions and changes of occupancy complying with Chapter 5 of this code in buildings complying with the California Fire Code shall be considered in compliance with the provisions of this code.

    Exception: Hospital buildings removed from acute care service, skilled nursing facilities, intermediate-care facilities, correctional treatment centers and acute psychiatric hospitals [OSHPD 1R, 2, 4 and 5]. The provisions of adopted sections in Chapters 3 through 5 shall control the alteration, repair and change of occupancy or function of existing structures for applications listed in Section 1.10.1, 1.10.2, 1.10.4 and 1.10.5 regulated by the Department of Health Care Access and Information/Office of Statewide Hospital Planning and Development (OSHPD). Refer to Chapter 3A for services, systems and utilities that serve OSHPD 1 buildings.

Frequently asked questions

Which compliance method should I choose for my project?

Choose based on the work scope and project objectives. Prescriptive (Chapter 5) is rule-based and often simpler for limited work; Work Area (Chapters 6–11) focuses upgrades on the altered work area; Performance (Chapter 13) uses a scored evaluation when a performance demonstration is appropriate. The applicant must select one method and the methods are not to be combined for the same alteration (§301.3 and §301.3.1–§301.3.3) .

Are there limits or agency exceptions I should know about?

Yes. Chapter 3 (and Chapter 3A for certain state‑regulated facilities) contains requirements that apply regardless of method, and some state agencies (for example HCD and OSHPD) do not adopt all CEBC sections — notably some jurisdictions do not adopt Chapter 13 (performance) without local ordinance or agency adoption. Check the applicable agency notes in §301.3 and the chapter introductions .

More in California Existing Building Code

Ask about the CEBC

Get cited, plain-English answers on the California Existing Building Code for your project — any code section, any scenario.

Start Free Trial

Related in the CEBC