Skip to content

User Guide Overview›Path to Monetizing a Clean Energy/Advanced Manufacturing Credit with an Elective Payment or a Transfer Election›Elective Pay and Transfer Election Pre-Filing Registration User Guide

Important Dates

0726 Publ 5884 (PDF) · 2026-10-03 edition · updated 2026-10-04 · United States

Refer to the instructions for the source credit form for each credit. The range of dates that will affect the ability to earn a specific credit will be determined by the applicable Code section. These dates should be specific to the energy property associated with the credit selected.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — 0726 Publ 5884 (PDF)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.