User Guide Overview›Path to Monetizing a Clean Energy/Advanced Manufacturing Credit with an Elective Payment or a Transfer Election›Elective Pay and Transfer Election Pre-Filing Registration User Guide
Important Dates
0726 Publ 5884 (PDF) · 2026-10-03 edition · updated 2026-10-04 · United States
Refer to the instructions for the source credit form for each credit. The range of dates that will affect the ability to earn a specific credit will be determined by the applicable Code section. These dates should be specific to the energy property associated with the credit selected.
Get a plain-English answer with a citation back to this text.
Ask AI about this code