User Guide Overview›Path to Monetizing a Clean Energy/Advanced Manufacturing Credit with an Elective Payment or a Transfer Election›Elective Pay and Transfer Election Pre-Filing Registration User Guide
Date Construction Began
0726 Publ 5884 (PDF) · 2026-10-03 edition · updated 2026-10-04 · United States
If the date construction of a property or facility will affect the ability to qualify for a specific credit, the “Date Construction Began” field will open and will require an entry.
Get a plain-English answer with a citation back to this text.
Ask AI about this code