Skip to content

Division 7 — GENERAL DESIGN STANDARDSChapter 10 — CONDITIONAL GRADING COMPLIANCE

87.1040 Developer’s Deposit.

Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa

Prior to the issuance of the grading permit, the developer shall post a deposit with the City Engineer in the amount and in the form specified by the City Engineer. The deposit funds held in trust shall be dispersed to the quality control engineer by the City Engineer under the terms of the agreement between the City and the quality control engineer to pay for the services of the quality control engineer. The City Engineer will notify the developer if and when it becomes apparent that the deposit will be exhausted, and the developer shall make such additional deposit as is

required by the City Engineer. If the developer fails to submit such additional deposit by the date specified by the City Engineer, the City Engineer shall suspend or revoke the grading permit, in accordance with the provisions of the Uniform Building Code, and order that work on the project be ceased. Upon completion of the work, unused funds shall be returned to the developer within 60 days following the final grading and quality control inspection approvals.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Yucaipa Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.