Division 10 — SOIL AND WATER CONSERVATION›Chapter 4 — WATER CONSERVATION
810.0450 Certificate of Completion.
Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa
(a) The Certificate of Completion, a sample of which is available through the City, shall include the following six elements:
(1) Project information sheet that contains:
(A) Date,
(B) Project name,
(C) Project applicant name, telephone, and mailing address,
(D) Project address and location, and
(E) Property owner name, telephone, and mailing address;
(2) Certification by either the signer of the landscape design plan, the signer of the irrigation design plan, or the
licensed landscape contractor that the landscape project has been installed per the approved Landscape Documentation Package:
(A) Where there have been significant changes made in the field during construction, these “as-built” or record drawings shall be included with the certification,
(B) A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes;
(3) Irrigation scheduling parameters used to set the controller;
(4) Landscape and irrigation maintenance schedule;
(5) Irrigation audit report; and
(6) Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of soil report recommendations.
(b) The project applicant shall:
(1) Submit the signed Certificate of Completion to the City for review;
(2) Ensure that copies of the approved Certificate of Completion are submitted to the local water purveyor and property owner or designee.
(c) The City shall:
(1) Receive the signed Certificate of Completion from the project applicant;
(2) Approve or deny the Certificate of Completion. If the Certificate of Completion is denied, the City shall provide information to the project applicant regarding reapplication, appeal, or other assistance. (Amended by Ord. 338 § 1, 2015; Ord. 293 § 3, 2009)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Yucaipa Zoning Code
- Division 1 — GENERAL PROVISIONS
- Division 2 — REVIEWING AUTHORITIES
- Division 3 — PROCEDURES
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 4 — LAND USES
- Division 6 — PLANNING AREAS
- Division 7 — GENERAL DESIGN STANDARDS
- Division 8 — SPECIFIC USE DESIGN STANDARDS
- Division 9 — PLANT PROTECTION AND MANAGEMENT
▸Division 10 — SOIL AND WATER CONSERVATION
Overview- Chapter 1 — SURFACE MINING AND LAND RECLAMATION
- Chapter 2 — EROSION AND SEDIMENT CONTROL
- Chapter 3 — WIND-BORNE SOIL EROSION
▸Chapter 4 — WATER CONSERVATION
Overview- 810.0401 Findings and Purpose.
- 810.0405 Applicability.
- 810.0410 Definitions.
- 810.0415 Compliance with Landscape Documentation Package.
- 810.0420 Elements of the Landscape Documentation Package.
- 810.0425 Water Efficient Landscape Worksheet.
- 810.0430 Soil Management Report.
- 810.0435 Landscape Design Plan.
- 810.0440 Irrigation Design Plan.
- 810.0445 Grading Design Plan.
- 810.0450 Certificate of Completion.
- 810.0455 Irrigation Scheduling.
- 810.0465 Irrigation Audit, Irrigation Survey, and Irrigation W…
- 810.0470 Irrigation Efficiency.
- 810.0475 Recycled Water.
- 810.0480 Graywater Systems.
- 810.0490 Public Education.
- 810.0495 Existing Landscaping: Irrigation Audit, Irrigation Su…
- 810.0500 Water Waste Prevention.
- 810.0505 Effective Precipitation.
- 810.0510 Appendices.
- Chapter 5 — ONSITE WASTEWATER TREATMENT SYSTEMS
- Division 11 — PUBLIC FACILITIES FINANCING