Division 10 — SOIL AND WATER CONSERVATION›Chapter 3 — WIND-BORNE SOIL EROSION
810.0350 Permit Renewal.
Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa
The term of the permit shall run for one calendar year from date of issue. An annual renewal is required, as are the appropriate fees specified by the City Schedule of Fees.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Yucaipa Zoning Code
Yucaipa Zoning Code
- Division 1 — GENERAL PROVISIONS
- Division 2 — REVIEWING AUTHORITIES
- Division 3 — PROCEDURES
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 4 — LAND USES
- Division 6 — PLANNING AREAS
- Division 7 — GENERAL DESIGN STANDARDS
- Division 8 — SPECIFIC USE DESIGN STANDARDS
- Division 9 — PLANT PROTECTION AND MANAGEMENT
▸Division 10 — SOIL AND WATER CONSERVATION
Overview- Chapter 1 — SURFACE MINING AND LAND RECLAMATION
- Chapter 2 — EROSION AND SEDIMENT CONTROL
▸Chapter 3 — WIND-BORNE SOIL EROSION
Overview- 810.0301 Statement of Hazardous Condition.
- 810.0305 Enforcement.
- 810.0310 Permit Requirement.
- 810.0320 Penalty for Violations.
- 810.0325 Authority to Investigate, Detain, and/or Issue Citati…
- 810.0330 Subject Area.
- 810.0345 Permit.
- 810.0350 Permit Renewal.
- 810.0355 Exemptions.
- 810.0365 Annexation of Additional Area.
- 810.0370 Notice.
- Chapter 4 — WATER CONSERVATION
- Chapter 5 — ONSITE WASTEWATER TREATMENT SYSTEMS
- Division 11 — PUBLIC FACILITIES FINANCING