16.54.100. Certificate of compliance requirements.

  • (A) Notwithstanding SCCC § 13.10.260, within 10 years after January 1, 1976, each operator of an existing mining operation shall submit an application for and obtain approval of a certificate of compliance with the County mining ordinance. Each application for a certificate of compliance shall conform with all provisions of this chapter pertaining to mining approvals and mining approval amendments except as modified below.

  • (B) At the time of the hearing of an application for a certificate of compliance, the Planning Commission shall impose such conditions as are deemed necessary in each instance to bring the existing mining operation into full compliance with all applicable permits and approvals and terms of this chapter including establishment of a time limit for compliance. However, no new requirement, modified condition or new condition shall be imposed which is unreasonable as applied to conditions which have resulted from operations conducted prior to the effective date of Ordinance No. 1749 (September 1, 1972). No requirements or conditions necessary to respond to a threat to public health or safety, a significant injurious threat to the environment, or a nuisance shall be considered unreasonable.

  • (C) Procedures for processing a certificate of compliance shall be the same as for a mining approval, except that an application for a certificate of compliance:

    • (1) Shall not be deemed an application for rezoning under SCCC § 18.40.055; and

    • (2) Shall not constitute a waiver of any existing vested right under an existing use permit, except to the extent that such right has been specifically and validly modified pursuant to subsection (B) of this section.

  • (D) Compliance with this section is hereby made a condition of all existing use permits. Failure to apply for and obtain a certificate of compliance thereunder shall be grounds for revocation of the use permit pursuant to SCCC § 18.10.136.

  • (Ord. 4421 § 1, 1996)

16.54.101. Application requirements for reclamation plan approval only.

Except as provided in this chapter, any application for a reclamation plan approval only shall contain the following information and documentation regarding the proposed reclamation of the mining site and shall be prepared and completed in compliance with the reclamation standards of this chapter and in accordance with a guideline form supplied by the Planning Director:

  • (A) All information and documentation as required under SCCC § 16.54.040(A)(1), (2), (3) and (7).

  • (B) All information and documentation as required under SCCC § 16.54.040(C)(1), (2), (4) and (7).

(C) All information and documentation as required under SCCC § 16.54.040(D). (Ord. 4421 § 1, 1996)

Downloaded from https://ecode360.com/SA4770 on 2026-07-06

County of Santa Cruz, CA

ENVIRONMENTAL AND RESOURCE PROTECTION

16.54.102

16.54.102

16.54.102. Abeyance of enforcement.

Any enforcement action which may be brought against an operator or owner who has received approval of financial assurances for reclamation prior to January 1, 1991, or a person who has filed an appeal to the State Board or to the County Board of Supervisors shall be held in abeyance pending review of existing financial assurances or the resolution of the pending appeal to the State Board or County Board of Supervisors.

(Ord. 4421 § 1, 1996)

Downloaded from https://ecode360.com/SA4770 on 2026-07-06

County of Santa Cruz, CA 16.55.010

ENVIRONMENTAL AND RESOURCE PROTECTION

16.55.010

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Santa Cruz County Planning Code
Santa Cruz County Planning Code
  1. Title 14
  2. Title 16
    Overview
    1. Chapter 16 — 22A EROSION CONTROL
    2. Chapter 16.30 — RIPARIAN CORRIDOR AND WETLANDS PROTECTION
    3. Chapter 16.01 — PROCEDURES FOR COMPLIANCE WITH THE CALIFORNIA …
    4. Chapter 16.10
    5. Chapter 16 — 10A
    6. Chapter 16.11 — DEVELOPMENT MORATORIUM IN AREAS OF CRITICAL CO…
    7. Part I — General And Applicability
    8. Part II — Definitions
    9. Part III — Administration
    10. Part IV — Permits
    11. Part V — Construction Documents
    12. Part VI — Development Standards
    13. Part VII — Inspections
    14. Part VIII
    15. Part IX — Exceptions
    16. Part X
    17. Part XI — Project Denial
    18. Part XII
  3. Title 17
  4. Title 19

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.