Chapter 16 — 22A EROSION CONTROL
Santa Cruz County Planning Code · 2026-07 edition · updated 2026-07-25 · Santa Cruz County
16.22A.090. Winter operations erosion control permit. 16.22A.100. Overall responsibility. 16.22A.110. Exemptions. 16.22A.120. Exceptions. 16.22A.130. Fees. 16.22A.140. Inspection and compliance. 16.22A.150. Applicable laws and regulations. 16.22A.160. Violations. 16.22A.161. Right of entry. 16.22A.162. Stop notices. 16.22A.163. Notification of violations. 16.22A.164. Nuisance abatement of violation. 16.22A.165. Recording notice of violation. 16.22A.170. Penalties. 16.22A.180. Enforcement. 16.22A.190. Appeals.
Chapter 16.24 WATER QUALITY CONTROL
16.24.010. Title. 16.24.020. Definitions. 16.24.030. Increase in turbidity. 16.24.040. Increase in settleable solids. 16.24.050. Exemptions. 16.24.055. Approvals. 16.24.058. Violations. 16.24.060. Investigation and enforcement. 16.24.070. Penalties.
| 16.22A.010. | Purpose. |
|---|---|
| 16.22A.020. | Scope. |
| 16.22A.025. | Amendment. |
| 16.22A.030. | Definitions. |
| 16.22A.040. | General provisions. |
| 16.22A.050. | Project design. |
| 16.22A.060. | Erosion control plan. |
| 16.22A.070. | Runoff control. |
| 16.22A.080. | Land clearing permit |
| approval. |
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Santa Cruz County Planning Code
- Title 14
-
▸ Title 16
Overview- Chapter 16 — 22A EROSION CONTROL
- Chapter 16.30 — RIPARIAN CORRIDOR AND WETLANDS PROTECTION
- Chapter 16.01 — PROCEDURES FOR COMPLIANCE WITH THE CALIFORNIA …
- Chapter 16.10
- Chapter 16 — 10A
- Chapter 16.11 — DEVELOPMENT MORATORIUM IN AREAS OF CRITICAL CO…
- Part I — General And Applicability
- Part II — Definitions
- Part III — Administration
- Part IV — Permits
- Part V — Construction Documents
- Part VI — Development Standards
- Part VII — Inspections
- Part VIII
- Part IX — Exceptions
- Part X
- Part XI — Project Denial
- Part XII
- Title 17
- Title 19