Title 16›Part XII›Chapter 16.54 — MINING REGULATIONS[6 ]
Article VI — Transition Provisions
Santa Cruz County Planning Code · edición 2026-07 · actualizado 2026-07-25 · Santa Cruz County
16.54.100. Certificate of compliance requirements. ¶
Esta sección aún no está traducida y se muestra en inglés.
(A) Notwithstanding SCCC § 13.10.260, within 10 years after January 1, 1976, each operator of an existing mining operation shall submit an application for and obtain approval of a certificate of compliance with the County mining ordinance. Each application for a certificate of compliance shall conform with all provisions of this chapter pertaining to mining approvals and mining approval amendments except as modified below.
(B) At the time of the hearing of an application for a certificate of compliance, the Planning Commission shall impose such conditions as are deemed necessary in each instance to bring the existing mining operation into full compliance with all applicable permits and approvals and terms of this chapter including establishment of a time limit for compliance. However, no new requirement, modified condition or new condition shall be imposed which is unreasonable as applied to conditions which have resulted from operations conducted prior to the effective date of Ordinance No. 1749 (September 1, 1972). No requirements or conditions necessary to respond to a threat to public health or safety, a significant injurious threat to the environment, or a nuisance shall be considered unreasonable.
(C) Procedures for processing a certificate of compliance shall be the same as for a mining approval, except that an application for a certificate of compliance:
(1) Shall not be deemed an application for rezoning under SCCC § 18.40.055; and
(2) Shall not constitute a waiver of any existing vested right under an existing use permit, except to the extent that such right has been specifically and validly modified pursuant to subsection (B) of this section.
(D) Compliance with this section is hereby made a condition of all existing use permits. Failure to apply for and obtain a certificate of compliance thereunder shall be grounds for revocation of the use permit pursuant to SCCC § 18.10.136.
(Ord. 4421 § 1, 1996)
16.54.101. Application requirements for reclamation plan approval only. ¶
Esta sección aún no está traducida y se muestra en inglés.
Except as provided in this chapter, any application for a reclamation plan approval only shall contain the following information and documentation regarding the proposed reclamation of the mining site and shall be prepared and completed in compliance with the reclamation standards of this chapter and in accordance with a guideline form supplied by the Planning Director:
(A) All information and documentation as required under SCCC § 16.54.040(A)(1), (2), (3) and (7).
(B) All information and documentation as required under SCCC § 16.54.040(C)(1), (2), (4) and (7).
(C) All information and documentation as required under SCCC § 16.54.040(D). (Ord. 4421 § 1, 1996)
Downloaded from https://ecode360.com/SA4770 on 2026-07-06
County of Santa Cruz, CA
ENVIRONMENTAL AND RESOURCE PROTECTION
16.54.102
16.54.102
16.54.102. Abeyance of enforcement. ¶
Esta sección aún no está traducida y se muestra en inglés.
Any enforcement action which may be brought against an operator or owner who has received approval of financial assurances for reclamation prior to January 1, 1991, or a person who has filed an appeal to the State Board or to the County Board of Supervisors shall be held in abeyance pending review of existing financial assurances or the resolution of the pending appeal to the State Board or County Board of Supervisors.
(Ord. 4421 § 1, 1996)
Downloaded from https://ecode360.com/SA4770 on 2026-07-06
County of Santa Cruz, CA 16.55.010
ENVIRONMENTAL AND RESOURCE PROTECTION
16.55.010
Obtén una respuesta en español sencillo con una cita a este texto.
Pregúntale a la IA sobre este código▸ Contenido — Santa Cruz County Planning Code
- Title 14
-
▸ Title 16
Overview- Chapter 16 — 22A EROSION CONTROL
- Chapter 16.30 — RIPARIAN CORRIDOR AND WETLANDS PROTECTION
- Chapter 16.01 — PROCEDURES FOR COMPLIANCE WITH THE CALIFORNIA …
- Chapter 16.10
- Chapter 16 — 10A
- Chapter 16.11 — DEVELOPMENT MORATORIUM IN AREAS OF CRITICAL CO…
- Part I — General And Applicability
- Part II — Definitions
- Part III — Administration
- Part IV — Permits
- Part V — Construction Documents
- Part VI — Development Standards
- Part VII — Inspections
- Part VIII
- Part IX — Exceptions
- Part X
- Part XI — Project Denial
-
▸ Part XII
Overview- Chapter 16.20
- Chapter 16 — 20A
- Chapter 16.22 — EROSION CONTROL (EFFECTIVE WITHIN COASTAL ZONE)
- Chapter 16 — 22A
- Chapter 16.24 — WATER QUALITY CONTROL
- Chapter 16.30 — RIPARIAN CORRIDOR AND WETLANDS PROTECTION
- Chapter 16.32 — SENSITIVE HABITAT PROTECTION
- Chapter 16.34 — SIGNIFICANT TREES PROTECTION
- Chapter 16.40 — NATIVE AMERICAN CULTURAL SITES
- Chapter 16.42 — HISTORIC PRESERVATION[4 ]
- Chapter 16.44 — PALEONTOLOGICAL RESOURCE PROTECTION
- Chapter 16.50 — AGRICULTURAL LAND PRESERVATION AND PROTECTION[…
- Chapter 16.52 — TIMBER HARVESTING REGULATIONS
- Chapter 16.55 — ONSHORE FACILITIES SUPPORTING OFFSHORE OIL AND…
- Chapter 16.90 — ENVIRONMENTAL PRINCIPLES AND POLICIES TO GUIDE…
- Chapter 16.92 — ENVIRONMENTAL PRINCIPLES AND POLICIES TO GUIDE…
- Title 17
- Title 19