§ 28.93.001. In General.

The following regulations shall apply to the granting of Performance Standard Permits.

(Ord. 4858, 1994)

§ 28.93.005. Legislative Intent.

It is hereby declared that the uses permitted under this chapter are relatively minor in nature but have unique features that make it impractical to establish their suitability in a given location prior to their proposal. Because of their nature, these uses warrant individual consideration and review for which performance standards specific to that use are applied. This chapter establishes a process which allows for individual consideration and review of each project and which requires public notice to neighbors and an opportunity for a public hearing while providing an expedient and economical review process consistent with the proposed degree of development. (Ord. 4858, 1994)

§ 28.93.010. Filing of Applications.

Applications for Performance Standard Permits shall be made to the Community Development Director in such form as approved by the Community Development Director. The Community Development Director may provide forms for such purposes and may prescribe the type of information to be provided thereon, provided that such information is reasonably related to meeting the requirements of this chapter. No application shall be accepted unless it complies with such requirements.

(Ord. 4858, 1994)

§ 28.93.015. Filing Fees.

Before accepting any application for filing pursuant to this chapter, the City shall charge and collect the fees established by resolution of the City Council. (Ord. 4858, 1994)

§ 28.93.020. Performance Standard Permit Procedures.

A performance standard permit is granted subject to the following procedures:

  • A. The Staff Hearing Officer may grant a performance standard permit if the Staff Hearing Officer finds that the proposed use complies with all standards for the proposed use set forth in Section 28.93.030 and all requirements of the Zoning Ordinance, and may revoke a performance standard permit if compliance with any such standards and requirements is discontinued.

  • B. Notice of the proposed use shall be given pursuant to Section 28.87.380 of this code.

  • C. The denial or approval of any application for a permit under this section may be suspended or appealed pursuant to Section 28.05.020 of this code.

  • (Ord. 4858, 1994; Ord. 5380, 2005)

§ 28.93.030. Uses Permitted Upon Issuance of a Performance Standard Permit.

The following use(s) may be permitted subject to the approval of a Performance Standard Permit:

  • A. State-licensed Large Family Day Care Homes in the A, E, R-1, R-2, R-3, R-4 and PUD zones and in the HRC-2 zone where residential uses are permitted provided that the following performance standards are met:

    1. There are no other State-licensed Large Family Day Care Homes within a 300 foot radius of the proposed Large Family Day Care Home measured from the nearest property lines of the affected Large Family Day Care Homes. A waiver from the 300-foot spacing requirement may be granted if it can be found that certain physical conditions exist and if the waiver would not result in significant effects on the public peace, health, safety and comfort of the affected neighborhood. Examples of physical conditions that may warrant granting of a waiver include intervening topography that creates a barrier or separation between the facilities such as hillsides or ravines, the presence of major nonresidential uses or structures between facilities or the presence of a major roadway between the facilities.

    2. The City finds that adequate off-street area or on-street area in front of the residence is available for passenger loading and unloading. The passenger loading and unloading area shall be of adequate size and configuration and shall allow unrestricted access to neighboring properties.

    3. Outdoor play shall be limited to the hours between 8:00 a.m. and 6:00 p.m.

    4. One additional parking space for employee parking shall be provided unless a finding is made that adequate on-street or off-street parking is available to support the proposed use.

  • B. Community care facilities, residential care facilities for the elderly, and hospices serving 7 to 12 individuals in the A, E, R-1, R-2, R-3, R-4, and PUD zones and in the HRC-2 zone where residential uses are permitted, provided that the following performance standards are met:

    1. Adequate off-street parking is provided pursuant to Section 28.90.100 or as modified pursuant to Section 28.92.110 .

    2. The facility conforms to the extent feasible to the type, character and appearance of other residential units in the neighborhood in which it is located. This provision shall in no way restrict the installation of any special feature(s) necessary to serve disabled residents (e.g., ramps, lifts, handrails).

    3. The intensity of use in terms of number of people, hours of major activities and other operational aspects of the proposed facility is compatible with any neighboring residential use.

  • C. Public works treatment and distribution facilities that are greater than 500 square feet and no more than 1,000 square feet in the R-3, R-4, and P-R zones subject to the requirements of Section 28.37.010.B., and less restrictive zones, provided that the following performance standards are met:

  1. The setbacks of the proposed facilities from property and street lines are of sufficient magnitude in view of the character of the land and of the proposed development that significant detrimental impact on surrounding residential properties is avoided.

    1. The operation of the proposed facility is such that the character of the area is not significantly altered or disturbed.

    2. The design and operation of non-emergency outdoor security lighting and equipment will not be a nuisance to the use of property in the area.

    3. Construction (including preparation for construction work) is prohibited Monday through Friday before 8:00 a.m. and after 5:00 p.m., and all day on Saturdays, Sundays, and holidays observed by the City of Santa Barbara.

    4. If construction work is necessary before 8:00 a.m. or after 5:00 p.m., Monday through Friday, it must be approved by the Chief Building Official. If approved by the Chief Building Official, the applicant shall provide written notice to all property owners and residents within 300 feet of the project and the City Planning and Building Divisions at least 48 hours prior to commencement of any noise-generating construction activity.

    5. The project will incorporate standard dust control measures to minimize air quality nuisances to surrounding properties.

  • D. Rehabilitation of existing water storage reservoirs or sludge basins in any zone, that are owned and operated by the City, provided that the following performance standards are met:

    1. That the design and operation of non-emergency outdoor lighting and equipment will not be a nuisance to the use of property in the area.

    2. Construction (including preparation for construction work) is prohibited Monday through Friday before 8:00 a.m. and after 5:00 p.m., and all day on Saturdays, Sundays and holidays observed by the City of Santa Barbara.

    3. If construction work is necessary before 8:00 a.m. or after 5:00 p.m., Monday through Friday, it must be approved by the Chief Building Official. If approved by the Chief Building Official, the applicant shall provide written notice to all property owners and residents within 300 feet of the project and the City Planning and Building Divisions at least 48 hours prior to commencement of any noise-generating construction activity.

    4. The project will incorporate standard dust control measures to minimize air quality nuisances to surrounding properties.

  • E. Additional dwelling units. Notwithstanding any other provisions of this title, where a lot in an A-1, A-2, E-1, E-2, E-3, or R-1 Zone has an area of more than the required lot area for that zone and adequate provisions for ingress and egress, a Performance Standard Permit may be granted by the Staff Hearing Officer for the construction of additional one-family dwellings and allowable accessory buildings in these zones. However, the minimum site area per dwelling unit in these zones shall be the minimum lot area required for that zone, and the location of such additional dwellings shall comply with the provisions of all other applicable ordinances.

Standard Permit may be granted by the Staff Hearing Officer for the construction of additional one-family dwellings and allowable accessory buildings in these zones. However, the minimum site area per dwelling unit in these zones shall be the minimum lot area required for that zone, and the location of such additional dwellings shall comply with the provisions of all other applicable ordinances.

  • F. Solar Energy Systems. In the case where the Building Official makes a finding, based on substantial evidence, that a solar energy system could have a specific, adverse impact upon the public health and safety (as defined in Chapter 22.91 of this code), the solar energy system shall not be issued a building permit until a Performance Standard Permit has been issued for the solar energy system.

    1. Conditions of Approval. The Performance Standard Permit shall require the installation or incorporation of measures or conditions necessary to minimize or avoid the specific, adverse impact.

    2. Grounds for Denial. The City shall not deny an application for a Performance Standard Permit to install a solar energy system unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily minimize or avoid the specific, adverse impact. If the applicant proposes any potentially feasible alternatives for preventing the specific adverse impact, the findings accompanying the denial of the Performance Standard Permit shall include the basis for the rejection for potential feasible alternatives of preventing the specific, adverse impact.

    3. Appeal. The decision of the Staff Hearing Officer to deny an application for a Performance Standard Permit is appealable according to the following procedures:

      • a. Who May Appeal. The decision of the Staff Hearing Officer may be appealed to the Planning Commission by the applicant. No other persons can appeal.

      • b. Timing for Appeal. The applicant may appeal a decision of the Staff Hearing Officer by filing an appeal with the Community Development Director no more than 10 calendar days following the decision. The application shall include the grounds for appeal.

      • c. Grounds for Appeal. The decision of the Staff Hearing Officer may be appealed on the grounds that the stated findings to deny the permit are not supported by substantial evidence.

      • d. Scheduling an Appeal Hearing. The Community Development Department shall assign a date for an appeal hearing before the Planning Commission no earlier than 10 calendar days after the date on which the appeal is filed with the Community Development Director. The appeal hearing shall generally be held within 60 calendar days following the filing of the application for the hearing.

      • e. Power to Act on the Decision at Appeal Hearing. The Planning Commission may affirm, reverse, or modify the Staff Hearing Officer's decision to deny a solar energy system in accordance with the following:

  • i. A decision to affirm the decision of the Staff Hearing Officer shall require a finding based on substantial evidence in the record that the proposed solar energy system would have a specific, adverse impact upon the public health and safety.

       - ii. If the Planning Commission determines that there is not substantial evidence that the solar energy system would have a specific adverse impact upon the public health and safety, then the decision of the Staff Hearing Officer shall be reversed and the project shall be approved. 
    
       - iii. If the Planning Commission determines that conditions of approval would mitigate the specific adverse impact upon the public health and safety, then the decision of the Staff Hearing Officer shall be reversed and the project shall be conditionally approved. Any conditions imposed shall mitigate at the lowest cost possible, which generally means the permit condition shall not cause the project to exceed 10% of the cost of the small rooftop solar energy system or decrease the efficiency of the small rooftop solar energy system by an amount exceeding 10%.
    

f. The decision of the City Planning Commission is final. (Ord. 4858, 1994; Ord. 5380, 2005; Ord. 5713, 2015)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Santa Barbara Zoning Code
Santa Barbara Zoning Code
  1. Title 28 — Zoning—Coastal
    Overview
    1. Chapter 28.01 — TITLE
    2. Chapter 28.04 — DEFINITIONS
    3. Chapter 28.05 — STAFF HEARING OFFICER
    4. Chapter 28.06 — PLANNING COMMISSION
    5. Chapter 28.07 — GENERAL PLAN AMENDMENT
    6. Chapter 28.08 — SPECIFIC PLANS
    7. Chapter 28.10 — ZONES
    8. Chapter 28.11 — PROTECTION AND ENHANCEMENT OF SOLAR ACCESS
    9. Chapter 28.12 — ZONE MAP
    10. Chapter 28.15 — A-1, A-2, E-1, E-2, E-3 and R-1 ONE-FAMILY RES…
    11. Chapter 28.18 — R-2 TWO-FAMILY RESIDENCE ZONE
    12. Chapter 28.20 — AVERAGE UNIT-SIZE DENSITY INCENTIVE PROGRAM
    13. Chapter 28.21 — R-3 LIMITED MULTIPLE-FAMILY RESIDENCE ZONE AND…
    14. Chapter 28.22 — HRC-1 and HRC-2 HOTEL AND RELATED COMMERCE ZONES
    15. Chapter 28.27 — R-H RESORT-RESIDENTIAL HOTEL ZONE
    16. Chapter 28.30 — GARDEN APARTMENT DEVELOPMENTS
    17. Chapter 28.33 — PLANNED RESIDENCE DEVELOPMENTS
    18. Chapter 28.36 — PUD PLANNED UNIT DEVELOPMENT ZONE
    19. Chapter 28.37 — PR - PARK AND RECREATION ZONE
    20. Chapter 28.39 — P-D PLANNED DEVELOPMENT ZONE
    21. Chapter 28.42 — S-H SENIOR HOUSING ZONE
    22. Chapter 28.43 — INCLUSIONARY HOUSING ORDINANCE
    23. Chapter 28.44 — COASTAL OVERLAY ZONE - S-D-3 ZONE DESIGNATION
    24. Chapter 28.45 — S-D SPECIAL DISTRICT ZONE
    25. Chapter 28.46 — SP-5 ZONE
    26. Chapter 28.47 — SP-7 ZONE - RIVIERA CAMPUS SPECIFIC PLAN
    27. Chapter 28.48 — R-O RESTRICTED OFFICE ZONE
    28. Chapter 28.49 — SP-8 HOSPITAL ZONE
    29. Chapter 28.50 — SP-9 ZONE - VERONICA MEADOWS SPECIFIC PLAN
    30. Chapter 28.51 — C-O MEDICAL OFFICE ZONE
    31. Chapter 28.54 — C-P RESTRICTED COMMERCIAL ZONE
    32. Chapter 28.57 — C-L LIMITED COMMERCIAL ZONE
    33. Chapter 28.60 — C-X RESEARCH AND DEVELOPMENT AND ADMINISTRATIV…
    34. Chapter 28.63 — C-1 LIMITED COMMERCIAL ZONE
    35. Chapter 28.66 — C-2 COMMERCIAL ZONE
    36. Chapter 28.69 — C-M COMMERCIAL MANUFACTURING ZONE
    37. Chapter 28.70 — HC - HARBOR COMMERCIAL ZONE
    38. Chapter 28.71 — OC OCEAN-ORIENTED COMMERCIAL ZONE
    39. Chapter 28.72 — M-1 LIGHT MANUFACTURING ZONE
    40. Chapter 28.73 — OM-1 OCEAN-ORIENTED LIGHT MANUFACTURING
    41. Chapter 28.75 — HWMF HAZARDOUS WASTE MANAGEMENT FACILITY OVERL…
    42. Chapter 28.77 — ALCOHOLIC BEVERAGE RETAIL ESTABLISHMENTS
    43. Chapter 28.78 — MOBILEHOME AND PERMANENT RECREATIONAL VEHICLE …
    44. Chapter 28.79 — EMERGENCY SHELTER REGULATIONS
    45. Chapter 28.80 — TWO-UNIT RESIDENTIAL DEVELOPMENT
    46. Chapter 28.81 — ADULT ENTERTAINMENT FACILITIES
    47. Chapter 28.82 — ESTABLISHING PROCEDURE FOR STREET WIDENING SET…
    48. Chapter 28.83 — STREET WIDENING SETBACK LINES ESTABLISHED
    49. Chapter 28.84 — VARIANCES FOR STREET WIDENING SETBACK LINES
    50. Chapter 28.85 — NONRESIDENTIAL GROWTH MANAGEMENT PROGRAM
    51. Chapter 28.86 — ACCESSORY DWELLING UNITS
    52. Chapter 28.87 — GENERAL PROVISIONS
    53. Chapter 28.88 — CONVERSION OF DWELLING UNITS TO CONDOMINIUMS, …
    54. Chapter 28.89 — TENANT DISPLACEMENT ASSISTANCE ORDINANCE
    55. Chapter 28.90 — AUTOMOBILE PARKING REQUIREMENTS
    56. Chapter 28.92 — VARIANCES, MODIFICATIONS AND ZONE CHANGES
    57. Chapter 28.93 — PERFORMANCE STANDARD PERMITS
    58. Chapter 28.94 — CONDITIONAL USE PERMITS
    59. Chapter 28.95 — TRANSFER OF EXISTING DEVELOPMENT RIGHTS
    60. Chapter 28.96 — ZONING UPON ANNEXATION
    61. Chapter 28.97 — OCCUPANCY
    62. Chapter 28.98 — ENFORCEMENT AND PENALTY
    63. Chapter 28.99 — VALIDITY AND REPEALS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.