Chapter 9-808 — Other Plan or Map Amendments
§ 9-809
San Joaquin County Zoning Code · 2026-06 edition · updated 2026-07-25 · San Joaquin County
9-809.010 - PURPOSE ¶
The purpose of this Chapter is to establish a permit procedure to:
(a)
Allow the removal of excess material from property in order to increase the property's agricultural potential, while protecting people, property, and the environment from impacts caused by the grading excavation; and
(b)
Ensure the reclamation of excavation sites.
9-809.020 - PERMITTED ZONES ¶
Applications for Agricultural Excavation Permits may be accepted in the following zones:
(a)
AL zone;
(b)
AG zone; and
(c)
AU zone.
9-809.030 - REQUIREMENTS FOR APPLICATION ¶
An application for an Agricultural Excavation Permit shall include the following:
(a)
A Certified Grading Plan prepared by a registered civil engineer;
(b)
An Operational Statement, including identification of a haul route and public roads that will be used;
(c)
A soils report, prepared by a soil scientist qualified to analyze agricultural soils, shall be required for all proposals where the topsoil is not proposed to be replaced;
(d)
An Excavation/Reclamation Plan and schedule prepared by a registered civil engineer;
(e)
Proposed methods of financial guarantees of performance;
(f)
An Erosion, Sediment and Pollution Control Plan to minimize impacts on waterways and/or roadways during excavation; and
(g)
The required fee as specified by the Board of Supervisors.
9-809.040 - REVIEW PROCEDURES ¶
The review procedure for an Agricultural Excavation Permit Application shall that established for a Zoning Compliance Review in Chapter 9-803.
9-809.050 - REQUIRED FINDINGS ¶
Prior to approving an application for an Agricultural Excavation Permit, the Zoning Administrator shall find all of the following true:
(a)
The amount of the material being removed is the least amount required to enhance the agricultural suitability of the property;
(b)
The excavation will not have a detrimental effect on any surrounding agricultural lands; and
(c)
Issuance of the permit shall not be significantly detrimental to the public health, safety, or welfare, or be injurious to the property or improvements in the vicinity.
9-809.060 - DEVELOPMENT STANDARDS ¶
Approved Agricultural Excavation Permits shall be subjected to the development standards specified in Chapter 9-702.
9-809.070 - TIME LIMIT ON APPROVALS ¶
If the excavation does not commence within three years after the date of approval of the Agricultural Excavation Permit, the permit shall lapse and become void.
9-809.080 - EXPANSION ¶
A new Agricultural Excavation Permit shall not be required for the expansion of an existing or approved agricultural excavation, provided the Zoning Administrator determines that all of the following requirements are satisfied:
(a)
Any proposed expansion(s) may involve no more than a 10 percent increase in the overall site area covered by the existing or approved agricultural excavation;
(b)
The proposed expansion, in the opinion of the Zoning Administrator, will not have a substantial, adverse effect on adjacent property or on significant biotic resources on the site;
(c)
The proposed expansion will comply with existing requirements of agencies having jurisdiction and any other appropriate regulatory agency; and
(d)
A Public Improvement Plan pursuant to Chapter 9-514 is submitted to the County.
9-809.090 - SURFACE MINING AND RECLAMATION ACT ¶
Approved Agricultural Excavation Permits shall be subject to the regulations adopted by the State Mining and Geology Board as authorized by the California Surface Mining and Reclamation Act (SMARA) of 1975 (Public Resource Code Section 2710 et seq.), as amended; Public Resource Code Section 2207; and the California Code of Regulations adopted pursuant thereto (Title 14, Section 3500 et seq.).
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Joaquin County Zoning Code
- § 9-100
- § 9-101
- § 9-102
- § 9-103
- § 9-200
- § 9-201
- § 9-202
- § 9-203
- § 9-204
- § 9-300
- § 9-301
- § 9-302
- § 9-303
- § 9-400
- § 9-401
- § 9-402
- § 9-403
- § 9-404
- Chapter 9-405 — Nonconformity Provisions
- Chapter 9-505 — Final Maps
- Chapter 9-509 — Parcel Mergers
- Chapter 9-608 — Roadways
- Chapter 9-806 — Waivers
- Chapter 9-810 — Evacuation Plans
- Chapter 9-814 — Development Agreements
- Chapter 9 — 115M - USE CLASSIFICATION SYSTEM
- Chapter 9 — 205M - REVIEW AUTHORITIES
- Chapter 9 — 310M - RESIDENTIAL ZONE LOT AND STRUCTURE REGULATI…
- Chapter 9 — 605M - AGRICULTURAL ZONE USE REGULATIONS
- Chapter 9 — 700M - INTENT AND ORGANIZATION OF OTHER ZONES
- Chapter 9 — 803M - GENERAL PLAN AMENDMENTS
- Chapter 9 — 804M - MASTER PLANS
- Chapter 9 — 806M - SPECIFIC PLANS
- Chapter 9 — 812M - ZONE RECLASSIFICATIONS
- Chapter 9 — 818M - SITE APPROVALS
- Chapter 9 — 827M - VARIANCES
- Chapter 9 — 830M - ACCESSORY DWELLING UNITS (ADU)
- Chapter 9 — 836M - DWELLING CLUSTERS
- Chapter 9 — 854M - QUARRY EXCAVATION PERMITS
- Chapter 9 — 857M - MAJOR SUBDIVISIONS
- Chapter 9 — 860M - MINOR SUBDIVISIONS
- Chapter 9 — 1015M - PARKING AND LOADING
- Chapter 9 — 1020M - LANDSCAPING REGULATIONS
- Chapter 9 — 1022M - FENCING AND SCREENING
- Chapter 9 — 1025M - PERFORMANCE STANDARDS
- Chapter 9 — 1053M - HISTORIC RESOURCE PRESERVATION
- Chapter 9 — 1100M - INFRASTRUCTURE STANDARDS INTENT AND ORGANI…
- Chapter 9 — 1120M - WATER SYSTEMS
- Chapter 9 — 1240M - LAND RESERVATION FOR PUBLIC UTILITIES
- Chapter 9 — 1245M - PUBLIC LAND EQUITY PROGRAM
- Chapter 9 — 1270M - AFFORDABLE HOUSING IMPACT FEE