Skip to content

Section 513C — DETAILED SYSTEM DESIGN REQUIREMENTS

513C.2 Diaphragm Shear Transfer.

San Francisco Building Inspection Commission Codes · 2022 edition · updated 2026-08-28 · San Francisco

Bolts transmitting shear forces shall have a maximum bolt spacing of 6 feet (1.829 m) and shall have nuts installed over malleable iron or plate washers when bearing on wood and heavy cut washers when bearing on steel.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Francisco Building Inspection Commission Codes

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.