Skip to content

Section 511C — SPECIAL PROCEDURE

511C.8 Open Front Design Procedure.

San Francisco Building Inspection Commission Codes · 2022 edition · updated 2026-08-28 · San Francisco

A single-story building with an open front on one side and crosswalls parallel to the open front may be designed by the following procedure:

  1. Effective diaphragm span, Li, for use in Figure 5C-1 shall be determined in accordance with the following formula:

Li = 2[(Ww /Wd)L+L]x (5C-17)

  1. Diaphragm demand-capacity ratio shall be calculated as:

DCR = 0.332(Wd+Ww) / [(vuD)+Vcb] (5C-18)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Francisco Building Inspection Commission Codes

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.