Division 7 — Public Right-of-Way Permits
§129.0803 Exemptions from a Sign Permit
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
A Sign Permit is not required for the following signs or activities:
(a) Changing the copy of a sign or maintenance of a sign that does not involve structural or electrical changes;
(b) Interior signs , except for theater lobby signs ;
(c) Public utility and safety signs that are required by law;
(d) Signs that are required by law, other than public utility and safety signs , that do not exceed the minimum dimensions specified by law;
(e) Real estate signs that are not illuminated;
(f) Construction site signs that are not illuminated;
Ch. Art. Div. 12 9 8 1
San Diego Municipal Code
Chapter 12: Land Development Reviews
(1-2016)
(g) Nameplate identification signs and combination name plates and address signs with letters that do not exceed 3 inches in height, are not illuminated, and do not exceed 4 square feet in area;
(h) Accessory warning signs that provide warnings such as “no parking,” “watch dogs,” and “security service” that are not illuminated, do not exceed 12 square feet in area, and do not project over a public right-of-way ;
(i) Window signs ;
(j) Signs required by the Fire Department to designate fire lanes;
(k) Tablets, memorials, and cornerstones that are built into the walls of a building, and provide information such as the name of the building and the date of construction;
(l) Bulletin boards for charitable or religious organizations provided that the signs do not exceed 16 square feet in area, do not project over a public rightof-way , and are not illuminated; and
(m) Temporary on-site banners, streamers, and pennants. (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
- Division 2 — Rules for Calculation and Measurement
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
-
▸ Division 7 — Public Right-of-Way Permits
Overview- §129.0701 Purpose of Public Right-of-Way Permit Procedures
- §129.0702 When a Public Right-of-Way Permit Is Required
- §129.0703 Exemptions from Requirement for a Public Right-of-Wa…
- §129.0710 How to Apply for a Public Right-of-Way Permit
- §129.0715 Encroachment Maintenance and Removal Agreement
- §129.0720 Qualifications to Prepare Plans and Perform Construc…
- §129.0730 Decision Process for Public Right-of-Way Permits
- §129.0731 Timeliness of Decision
- 129.0732 Judicial Review
- §129.0741 Issuance of a Public Right-of-Way Permit
- §129.0742 Commencement of Work within a Public Right-of-Way or…
- §129.0750 Expiration of a Public Right-of-Way Permit
- §129.0751 Extension of Time for a Public Right-of-Way Permit
- §129.0752 Construction Change to a Public Right-of-Way Permit
- §129.0760 Inspection of Work in the Public Right-of-Way
- §129.0761 Designation of Engineer of Record
- §129.0770 Completion of Work
- §129.0801 Purpose of Sign Permit Procedures
- §129.0802 When a Sign Permit Is Required
- §129.0803 Exemptions from a Sign Permit
- §129.0804 General Rules for Sign Permits
- §129.0805 How to Apply for a Sign Permit
- §129.0807 Decision Process for Sign Permits
- §129.0808 Timeliness of Decision
- §129.0809 Judicial Review
- §129.0810 Issuance of a Sign Permit
- §129.0813 Expiration of a Sign Permit
- §129.0814 Extension of Time for a Sign Permit
- §129.0816 Temporary Sign Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone