Division 6 — Industrial Base Zones
131.0643 Setback Requirements in Industrial Zones
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
- (a) Front Setback in the IP, IL, IH, and IBT Zones. Up to 50 percent of the length of the building facade may observe the minimum front setback provided the remaining percentage observes the standard front setback . This may occur on a floor-by-floor basis. See Diagram 131-06A.
Ch. Art. Div. 13 1 6 23
San Diego Municipal Code
Chapter 13: Zones
(2-2025)
Diagram 131-06A
Front Setback in the IP, IL, and IH Zones
==> picture [283 x 174] intentionally omitted <==
----- Start of picture text -----
Building
Standard
front s etback Front y ard Min front s etback
Up to 50% of the length of the
Length of
building fac ade may obs erv e
building fac ade the minimum front s etback
CL
STREET
----- End of picture text -----
(b) Parking Encroachment in Front Yard of All Industrial Zones. Parking may encroach up to 5 feet into the required standard front yard in all industrial zones, but may not be covered or enclosed.
(c) Parking Encroachment in Street Side Yard of IP, IL, IH, and IBT Zones. Parking may encroach up to 5 feet into the required standard street side yard of the IP, IL, and IH zones, but may not be covered or enclosed.
(d) Rear Setback in IL Zones. In the IL zones, no rear setback is required for up to 50 percent of the width of the building envelope provided the remainder of the building envelope observes at least the standard rear setback as shown in Diagram 131-06B.
Ch. Art. Div. 13 1 6 24
San Diego Municipal Code
Chapter 13: Zones
(2-2025)
Diagram 131-06B
Zero Rear Setback in the IL Zone
==> picture [344 x 169] intentionally omitted <==
----- Start of picture text -----
No rear setback is required Width of building envelope
for up to 50% of the width
of the building envelope
Rear yard Standard rear setback
Side setback Building Side setback
CL
STREET
----- End of picture text -----
(e) Standard/Minimum Street Side Setback in the IL, IH, and IBT Zones. Up to 50 percent of the length of the street side building facade may observe the minimum street side setback provided the remaining percentage observes the standard street side setback . This may occur on a floor-by-floor basis.
(f) Side Setbacks in the IS Zone. In the IS zone, no side setback is required on one side of the lot . A minimum 5-foot setback is required for the opposite side.
(g) Street Side Setbacks in the IS Zone. In the IS zone, the minimum street side setback is 10 feet for a premises that is 100 feet wide or greater. For a premises that is less than 100 feet, the minimum is 10 percent of the premises width but not less than 5 feet.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 4-11-2014 by O-20361 N.S.; effective 5-18-2014.)
Ch. Art. Div. 13 1 6 25
San Diego Municipal Code
Chapter 13: Zones
(2-2025)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
- Division 2 — Rules for Calculation and Measurement
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
-
▸ Division 6 — Industrial Base Zones
Overview- §131.0601 Purpose of Industrial Zones
- §131.0602 Purpose of the IP (Industrial--Park) Zones
- §131.0603 Purpose of the IL (Industrial--Light) Zones
- §131.0604 Purpose of the IH (Industrial--Heavy) Zones
- §131.0605 Purpose of the IS (Industrial--Small Scale) Zone
- §131.0606 Purpose of the IBT (International--Business and Trad…
- §131.0615 Where Industrial Zones Apply
- §131.0620 Use Regulations of Industrial Zones
- §131.0622 Use Regulations Table for Industrial Zones
- §131.0623 Additional Use Regulations of Industrial Zones
- §131.0630 Development Regulations of Industrial Zones
- §131.0631 Development Regulations Table for Industrial Zones
- §131.0632 Maximum Floor Area Ratio
- §131.0642 Lot Dimensions in Industrial Zones
- 131.0643 Setback Requirements in Industrial Zones
- §131.0644 Maximum Structure Height in Industrial Zones
- §131.0665 Outdoor Amenities in Industrial Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone