Division 1 — General Review Procedures for Previously Conforming Premises and Uses (Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)

§127.0103 Decision Process for Previously Conforming Premises and Previously Conforming…

San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego

The decision process for approval of proposed development or activity varies based on the previously conforming aspects of the development , as shown in Table 127-01A. If the proposed development includes more than one previously conforming aspect, all corresponding regulations, as described in Sections 127.0104 through 127.0109, apply.

Table 127-01A

Decision Process for Previously Conforming Premises and Uses[1]

Type ofDevelopment Proposal Process One
Approval Required
Process Two
Approval Required
Process Two
Approval Required
Process Two
Approval Required
Process Two
Approval Required


Maintenance, repair, alteration or replacement in accordance with Section 127.0104
Of a_previously conforming structural_
envelope
If a Coastal Development
Permit is not required
pursuant to Section
126.0704(b)
If a Coastal Development
Permit is required
pursuant to Section
126.0704(b)
Of a_structure_on a_premises_with_previously_
conforming density
Of a_structure_containing a_previously_
_conforming_use
If removal of less than 50
percent of the exterior
walls of a_structure_
containing a_previously_
_conforming_use
If removal of 50 percent
or more of the exterior
walls of a_structure_
containing a_previously_
_conforming_use
Reconstruction (following fire, natural disaster, act of the public enemy) in accordance with Section
127.0105
Of a_previously conforming structural_
envelope
If the new_structure_would
not exceed_the gross floor_
_area_or_height_of the
destroyed_structure_by
more than 10 percent and
the_structure_would be
located in substantially
the same location as the
destroyed_structure_or in a
location that would reduce
the level of non-
conformity




If the new_structure_would
exceed the_gross floor_
_area_or_height_of the
destroyed_structure_by
more than 10 percent or
the_structure_would be
located in a substantially
different location as the
destroyed_structure_that
would not reduce the level
of non-conformity
Of a_structure_on a_premises_with_previously_
conforming density
Of a residential_structure_with a_previously_
_conforming_use
Of a non-residential_structure_with a
_previously conforming_use and resumption of
the use
If less than 50 percent of
the_structure’s_exterior
walls were destroyed
If 50 percent or more of
the_structure’s_exterior
walls were destroyed
Ch. Art. Div.
12 7 1 3

San Diego Municipal Code

Chapter 12: Land Development Reviews

(3-2026)

Type ofDevelopment Proposal Process One
Approval Required
Process Two
Approval Required
Expansion/enlargement in accordance with Sections 127.0106 and 127.0109
Of a_previously conforming structural_
envelope
If new construction
conforms with current
development_regulations
for_setbacks
,floor area
ratio, and_structure height_
and does not increase the
level of non-conformity;
or the expansion or
enlargement is necessary
to incorporate required
public exits or fire walls
to bring a_multiple_
dwelling unit development
or non-residential
development structure
into compliance with the
California Building Code
or Fire Code

If proposed_development_
in the_setback_meets the
criteria specified in
Section 127.0106(b)
Of a_structure_on a_premises_with_previously_
conforming density
Of a_previously conforming_use N/A If an increase in floor area
to a_previously_
conforming_use (up to a
maximum of 20 percent
expansion of_gross floor

_area_of the existing
structure_or up to the
maximum_floor area ratio

of the underlying base
zone, whichever is less)
Change in use of_previously conforming_uses in accordance with Section 127.0107
If a change to another
_previously conforming_use
within the same use
category

N/A
Resumption of a_previously conforming_use after a
127.0108(d)
temporary discontinuance in accordance with Section
If resumption of a
_previously conforming_use
within two years after
discontinuance
If resumption of a
_previously conforming_use
after two or more years
after discontinuance

Ch. Art. Div. 12 7 1 4

San Diego Municipal Code

Chapter 12: Land Development Reviews

(3-2026)

Footnote to Table 127-01A

  • 1 Development that does not meet the criteria for a Process One or Process Two approval shall comply with all current regulations and the previously conforming aspect of the premises shall terminate.

(Amended 6-12-2001 by O-18948 N.S.; effective 12-12-2001.) (Amended 6-15-2007 by O-19624 N.S.; effective 7-15-2007.) (Retitled to “Decision Process for Previously Conforming Premises and Previously Conforming Uses” and amended 5-5-2015 by O-20482 N.S.; effective 6-4-2015.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — San Diego Zoning Code
San Diego Zoning Code
  1. Chapter 9
  2. Division 2 — House Numbers
  3. Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
  4. Division 1 — General Provisions and Definitions
  5. Division 2 — Financing Facilities
  6. Division 3 — Bonds
  7. Division 1 — Housing Code
  8. Division 2 — Mobilehome Parks and Special Occupancy Parks
  9. Division 3 — San Diego Housing Commission
  10. Division 4 — Interim School Facilities Financing Ordinance
  11. Division 6 — Housing Impact Fees On Commercial Development
  12. Division 7 — Residential Tenant Protections
  13. Division 8 — Prohibition of Discrimination Based on a Tenant’s…
  14. Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
  15. Division 10 — Affordable Housing Preservation
  16. Division 11 — Prohibition of Anti-Competitive Automated Rent P…
  17. Division 12 — Residential Tenant Utility Fees
  18. Division 1 — In General
  19. Division 2 — Responsibilities of City Council
  20. Division 3 — Administration of Program
  21. Division 5 — Designation of Residential Rehabilitation Areas a…
  22. Division 6 — Limitations on Amount of Loan
  23. Division 7 — Terms of Conventional RAP Loans
  24. Division 9 — Miscellaneous Provisions
  25. Division 19.7 — The Centre City Planned District
  26. Division 19.8 — The Centre City Planned District
  27. Division 2 — Land Development Authorities and Advisory Boards
  28. Division 2 — Fees and Deposits
  29. Division 3 — Notice
  30. Division 4 — Public Hearings
  31. Division 5 — Decision Process
  32. Division 1 — Definitions
  33. Division 2 — Rules for Calculation and Measurement
  34. Division 2 — Enforcement Authorities For the Land Development …
  35. Division 4 — Procedures For Abatement of Unsafe, Dangerous,
  36. Division 1 — Adoption And Amendment Procedures for Land Use Pl…
  37. Division 1 — Zoning and Rezoning Procedures
  38. Division 3 — Zoning Use Certificate Procedures
  39. Division 5 — Residential High Occupancy Permit
  40. Division 6 — Mobile Food Truck Permit
  41. Division 1 — General Subdivision Procedures
  42. Division 2 — Certificate of Compliance
  43. Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
  44. Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
  45. Division 6 — Final Maps
  46. Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
  47. Division 8 — Reversion to Acreage
  48. Division 9 — Public Right-of-Way Vacations
  49. Division 10 — Easement Vacations
  50. Division 3 — Conditional Use Permit Procedures
  51. Division 4 — Neighborhood Development Permit Procedures (Added…
  52. Division 5 — Site Development Permit Procedures
  53. Division 6 — Planned Development Permit Procedures (Added 12-9…
  54. Division 8 — Variance Procedures
  55. Division 1 — General Review Procedures for Previously Conformi…
  56. Division 2 — Review Procedures for Previously Conforming Signs
  57. Division 1 — General Procedures and Authorities for Implementa…
  58. Division 2 — Procedures for Determination of
  59. Division 3 — Procedures for Preparation and Review of Environm…
  60. Division 1 — General Construction Permit Authority and Procedu…
  61. Division 2 — Building Permit Procedures
  62. Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
  63. Division 4 — Plumbing/Mechanical Permit Procedures
  64. Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
  65. Division 7 — Public Right-of-Way Permits
  66. Division 9 — Fire Permit Procedures
  67. Division 4 — Residential Base Zones
  68. Division 5 — Commercial Base Zones
  69. Division 6 — Industrial Base Zones
  70. Division 7 — Mixed-Use Base Zones
  71. Division 2 — Airport Approach Overlay Zone
  72. Division 3 — Airport Environs Overlay Zone
  73. Division 6 — Sensitive Coastal Overlay Zone
  74. Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
  75. Division 8 — Parking Impact Overlay Zone
  76. Division 9 — Residential Tandem Parking Overlay Zone
  77. Division 10 — Transit Area Overlay Zone
  78. Division 11 — Urban Village Overlay Zone
  79. Division 12 — Mission Trails Design District
  80. Division 13 — Clairemont Height Limit Overlay Zone
  81. Division 15 — Airport Land Use Compatibility Overlay Zone
  82. Division 16 — Community Enhancement Overlay Zone