Chapter 85.18 — ACCESSORY WIND ENERGY SYSTEM PERMIT
San Bernardino County Zoning Code · 2026-06 edition · updated 2026-07-25 · San Bernardino County
§ 85.18.010 Purpose. ¶
As allowed by Government Code § 65892.13, the purpose of this Chapter is to provide a uniform and comprehensive set of standards, conditions, and procedures for the placement of accessory wind energy systems on parcels in unincorporated areas of the County in order to encourage the generation of electricity for on-site use, thereby reducing the consumption of electrical power supplied by utility companies. These regulations are intended to ensure that accessory wind energy systems are designed and located in a manner that minimizes visual and safety impacts on the surrounding community.
(Ord. 4011, passed - -2007)
§ 85.18.020 Applicability. ¶
(a) Accessory Wind Energy System Permit . An accessory wind energy system, as defined by § 810.01.250 (Definitions, “W”) and where allowed by Division 2 (Land Use Zoning Districts and Allowed Land Uses) of this Development Code, shall require an accessory wind energy system permit and shall be subject to the requirements and standards set forth in this Chapter and Chapter 84.26 of Division 4 of this Development Code.
(b) Exemptions . A single accessory wind energy system that is 35 feet or less in height shall be exempt from the requirement to obtain an accessory energy system permit. Multiple systems on the same parcel, even if they are 35 feet or less in height, shall be required to obtain an accessory wind energy system permit. All accessory wind energy systems, including those systems exempted from the accessory wind energy system permit process pursuant to this Subdivision, shall comply with the standards set forth in Chapter 84.26 of Division 4 of this Development Code. (Ord. 4011, passed - -2007; Am. Ord. 4098, passed - -2010; Am. Ord. 4188, passed - -2012)
§ 85.18.030 Procedures. ¶
(a) Action . The Director shall review and act upon an application for approval of an accessory wind energy system permit.
(b) Procedure . Staff review with notice in compliance with § 85.02.030 (Staff Review with Notice).
(c) Notification .
(1) Surrounding Property Owners . Notice shall be given by first class mail or delivery to all surrounding property owners within 300 feet of the boundaries of the parcel of the subject site when an application is accepted as complete.
(2) Electric Utility Service Provider . If the applicant plans to connect the system to the electricity grid, the
applicant shall submit documentation from the electric utility service provider that serves the proposed site confirming they have been informed of the applicant’s intent to install an interconnected customer-owned electricity generator. If the applicant does not plan to connect the system to the electricity grid, notice to the electric utility service provider shall not be required.
(3) Pest Control Service Providers . In the event an accessory wind energy system is proposed to be sited as an accessory to an agricultural use that may involve aircraft operating at low altitudes, the applicant shall take reasonable steps to notify pest control aircraft pilots registered to operate in the County.
(4) Military Airspace Authority . An accessory wind energy system shall not be sited on land within a restricted military airspace without first giving adequate notice to the governing authority of that airspace.
(d) Application Submittal Requirement . The noise ratings as published by the manufacturer of a system proposed for installation shall be submitted to the County for review at the time of the submittal of an application for an accessory wind energy system permit. If multiple systems are being proposed, the noise ratings shall be modified to address the number of systems being installed.
(e) Review Authority . Director.
(f) Findings Required . Before approving an application for an accessory wind energy permit, the Director shall find and justify that all of the following are true:
(1) The site for the proposed use is adequate in size and shape to accommodate the proposed use and all yards, open spaces, setbacks, walls and fences, parking areas, loading areas, landscaping and other features pertaining to the proposed use.
(2) The site for the proposed use has adequate access (i.e., the site design incorporates street and highway limitations).
(3) The proposed use will not have a substantial adverse effect on adjacent property or the use of the adjacent property (e.g., excessive noise, vibration, traffic, other disturbance, etc.) and will not have a substantial visual impact on adjacent property.
(4) The proposed use is consistent with the goals, policies, standards and maps of the General Plan and any applicable Community Plan or Specific Plan.
(5) The lawful conditions stated in the approval are deemed necessary to protect the public health, safety, and general welfare.
(Ord. 4011, passed - -2007; Am. Ord. 4188, passed - -2012)
§ 85.18.040 Abandonment. ¶
Under normal occupancy, an accessory wind energy system that is not operated for a continuous period of 12 months shall be considered abandoned. The owners of the system shall remove all structures within 90 days of receipt of notice from the County advising the owner of the abandonment. If the system is not removed within 90 days, the County may remove all structures at the owner’s expense.
(Ord. 4011, passed - -2007)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Bernardino County Zoning Code
- Chapter 81.01 — PURPOSE AND EFFECT OF DEVELOPMENT CODE
- Chapter 81.02 — INTERPRETATION OF REGULATIONS
- Chapter 82.01 — LAND USE PLAN, LAND USE ZONING DISTRICTS, AND …
- Chapter 82.02 — ALLOWED LAND USES AND DEVELOPMENT
- Chapter 82.03 — AGRICULTURAL AND RESOURCE MANAGEMENT LAND USE …
- Chapter 82.04 — RESIDENTIAL LAND USE ZONING DISTRICTS
- Chapter 82.05 — COMMERCIAL LAND USE ZONING DISTRICTS
- Chapter 82.06 — INDUSTRIAL AND SPECIAL PURPOSE LAND USE ZONING…
- Chapter 82.07 — ADDITIONAL AGRICULTURE (AA) OVERLAY
- Chapter 82.08 — AGRICULTURAL PRESERVE (AP) OVERLAY
- Chapter 82.09 — AIRPORT SAFETY (AR) OVERLAY
- Chapter 82.10 — ALTERNATE HOUSING (AH) OVERLAY
- Chapter 82.11 — BIOTIC RESOURCES (BR) OVERLAY
- Chapter 82.12 — CULTURAL RESOURCES PRESERVATION (CP) OVERLAY
- Chapter 82.13 — FIRE SAFETY (FS) OVERLAY
- Chapter 82.14 — FLOODPLAIN SAFETY (FP) OVERLAY
- Chapter 82.15 — GEOLOGIC HAZARD (GH) OVERLAY
- Chapter 82.16 — HAZARDOUS WASTE (HW) OVERLAY
- Chapter 82.17 — MINERAL RESOURCES (MR) OVERLAY
- Chapter 82.18 — NOISE HAZARD (NH) OVERLAY
- Chapter 82.19 — OPEN SPACE (OS) OVERLAY
- Chapter 82.20 — PALEONTOLOGIC RESOURCES (PR) OVERLAY
- Chapter 82.21 — SIGN CONTROL (SC) OVERLAY
- Chapter 82.22 — SPHERE STANDARDS (SS) OVERLAY
- Chapter 82.23 — COMMUNITY PLANS, SPECIFIC PLANS AND AREA PLANS
- Chapter 82.36 — OAK HILLS COMMUNITY PLAN
- Chapter 83.01 — GENERAL PERFORMANCE STANDARDS
- Chapter 83.02 — GENERAL DEVELOPMENT AND USE STANDARDS
- Chapter 83.03 — AFFORDABLE HOUSING INCENTIVES - DENSITY BONUS
- Chapter 83.04 — CONDITIONAL GRADING COMPLIANCE
- Chapter 83.05 — DEDICATIONS AND INSTALLATIONS OF STREET AND TR…
- Chapter 83.06 — FENCES, HEDGES, AND WALLS
- Chapter 83.07 — LIGHT TRESPASS
- Chapter 83.08 — HILLSIDE GRADING STANDARDS
- Chapter 83.09 — INFRASTRUCTURE IMPROVEMENT STANDARDS
- Chapter 83.10 — LANDSCAPING STANDARDS
- Chapter 83.11 — PARKING AND LOADING STANDARDS
- Chapter 83.12 — ROAD SYSTEM DESIGN STANDARDS
- Chapter 83.13 — SIGN REGULATIONS
- Chapter 83.14 — TRANSPORTATION CONTROL MEASURES
- Chapter 83.15 — CONDITIONAL COMPLIANCE FOR WATER QUALITY MANAG…
- Chapter 84.01 — ACCESSORY STRUCTURES AND USES
- Chapter 84.02 — ADULT BUSINESSES
- Chapter 84.03 — AGRITOURISM ENTERPRISES
- Chapter 84.04 — ANIMAL KEEPING
- Chapter 84.05 — BED AND BREAKFAST USES
- Chapter 84.06 — CEMETERIES
- Chapter 84.07 — COMMERCIAL AND INDUSTRIAL TRANSITIONAL USES
- Chapter 84.09 — FIREWOOD STORAGE
- Chapter 84.10 — GARAGE SALES
- Chapter 84.11 — HAZARDOUS WASTE FACILITIES
- Chapter 84.12 — HOME OCCUPATIONS
- Chapter 84.13 — MASSAGE SERVICES
- Chapter 84.14 — MOBILE HOME PARKS
- Chapter 84.16 — MULTI-FAMILY RESIDENTIAL DEVELOPMENT STANDARDS
- Chapter 84.17 — NONCONFORMING USES AND STRUCTURES
- Chapter 84.18 — PLANNED DEVELOPMENT STANDARDS
- Chapter 84.19 — RECYCLING FACILITIES
- Chapter 84.20 — SERVICE STATIONS
- Chapter 84.21 — SINGLE-FAMILY RESIDENTIAL DWELLINGS
- Chapter 84.22 — SMALL LOT RESIDENTIAL DEVELOPMENT
- Chapter 84.23 — LICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.24 — SOLID WASTE/RECYCLABLE MATERIALS STORAGE
- Chapter 84.25 — TEMPORARY STRUCTURES AND USES
- Chapter 84.26 — WIND ENERGY SYSTEMS - ACCESSORY
- Chapter 84.27 — WIRELESS TELECOMMUNICATION FACILITIES
- Chapter 84.28 — SHORT-TERM RESIDENTIAL RENTALS
- Chapter 84.29 — RENEWABLE ENERGY GENERATION FACILITIES
- Chapter 84.30 — GREENHOUSE GAS EMISSIONS REDUCTION PLAN IMPLEM…
- Chapter 84.32 — SMALL UNLICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.33 — EMERGENCY SHELTERS
- Chapter 84.34 — COMMERCIAL CANNABIS ACTIVITY
- Chapter 84.35 — INDUSTRIAL HEMP
- Chapter 84.36 — ACCESSORY DWELLING UNITS
- Chapter 85.01 — PERMIT APPLICATION FILING AND PROCESSING
- Chapter 85.02 — BASIC REVIEW PROCEDURES
- Chapter 85.03 — APPLICATION PROCEDURES
- Chapter 85.04 — ABC LICENSING
- Chapter 85.05 — CERTIFICATE OF LAND USE COMPLIANCE
- Chapter 85.06 — CONDITIONAL USE PERMIT/MINOR USE PERMIT
- Chapter 85.07 — FLOOD HAZARD DEVELOPMENT REVIEWS
- Chapter 85.08 — SITE PLAN PERMITS
- Chapter 85.09 — TENANT REVIEW
- Chapter 85.10 — PLANNED DEVELOPMENT PERMITS
- Chapter 85.11 — PRE-CONSTRUCTION FLOOD HAZARD MITIGATION AND E…
- Chapter 85.12 — REVISIONS TO AN APPROVED ACTION
- Chapter 85.13 — SIGN LOCATION PLANS
- Chapter 85.14 — SPECIAL USE PERMITS
- Chapter 85.15 — TEMPORARY USE PERMITS
- Chapter 85.16 — TEMPORARY SPECIAL EVENT PERMITS
- Chapter 85.17 — VARIANCES
- Chapter 85.18 — ACCESSORY WIND ENERGY SYSTEM PERMIT
- Chapter 85.19 — FOOD TRUCK EVENT PERMITS
- Chapter 85.20 — UNLICENSED RESIDENTIAL CARE FACILITIES PERMIT
- Chapter 85.21 — ADULT BUSINESS REGULATORY PERMIT
- Chapter 86.01 — PLANNING AGENCY
- Chapter 86.02 — DEVELOPMENT REVIEW COMMITTEE
- Chapter 86.03 — ENVIRONMENTAL REVIEW COMMITTEE
- Chapter 86.04 — FLOODPLAIN ADMINISTRATOR
- Chapter 86.05 — DECISIONS BY THE REVIEW AUTHORITY
- Chapter 86.06 — TIME LIMITATIONS
- Chapter 86.07 — PUBLIC HEARINGS
- Chapter 86.08 — APPEALS
- Chapter 86.09 — ENFORCEMENT
- Chapter 86.10 — AGRICULTURAL PRESERVES/LAND CONSERVATION CONTR…
- Chapter 86.11 — AIRPORT COMPREHENSIVE LAND USE PLANS
- Chapter 86.12 — AMENDMENTS
- Chapter 86.13 — DEVELOPMENT AGREEMENT ADOPTION AND AMENDMENT
- Chapter 86.14 — SPECIFIC PLAN ADOPTION AND AMENDMENT
- Chapter 86.15 — POST-DISASTER REBUILDING
- Chapter 87.01 — SUBDIVISION ORDINANCE APPLICABILITY AND ADMINI…
- Chapter 87.02 — TENTATIVE MAP FILING AND PROCESSING
- Chapter 87.03 — PARCEL MAPS AND FINAL MAPS
- Chapter 87.04 — ADDITIONAL SUBDIVISION PROCEDURES
- Chapter 87.05 — DEDICATIONS AND EXACTIONS
- Chapter 87.06 — SUBDIVISION DESIGN AND IMPROVEMENT REQUIREMENTS
- Chapter 87.07 — IMPROVEMENT PLANS, INSTALLATION, AND SECURITY
- Chapter 87.08 — SOIL REPORTS
- Chapter 88.01 — PLANT PROTECTION AND MANAGEMENT
- Chapter 88.02 — SOIL AND WATER CONSERVATION
- Chapter 88.03 — SURFACE MINING AND LAND RECLAMATION
- Chapter 89.01 — DRAINAGE FACILITIES FINANCING
- Chapter 89.02 — RECREATIONAL FACILITIES FINANCING
- Chapter 89.03 — TRANSPORTATION FACILITIES FINANCING