Chapter 85.08 — SITE PLAN PERMITS
San Bernardino County Zoning Code · 2026-06 edition · updated 2026-07-25 · San Bernardino County
§ 85.08.010 Purpose. ¶
It is the purpose of this Chapter to provide an expedited process for the County review and authorization of allowed uses and structures that are in compliance with Division 2 (Land Use Zoning Districts and Allowable Land Uses) and the other applicable requirements of this Development Code.
(Ord. 4011, passed - -2007)
§ 85.08.020 Applicability. ¶
(a) When Required. A Site Plan Permit shall be required to authorize:
(1) Compliance with Division 2. The alteration, construction, or expansion of every legally established use that is allowed by a land use zoning district subject to a Site Plan Permit in compliance with Division 2 (Land Use Zoning Districts and Allowable Land Uses); provided, the use complies with all applicable development standards identified in this Development Code, an adopted specific plan or adopted by the Board;
(2) Provision of Additional Parking. A change or expansion of any use that would require the provision of additional parking in compliance with Chapter 83.11 (Parking and Loading Standards); and
(3) Publicly Owned Institutional Structures. The alteration, disturbance, or expansion of an existing publicly owned institutional structure that is less than 10,000 square feet in area and is proposed to be expanded by no more than 5,000 square feet.
(b) Exceptions. A Site Plan Permit will not be allowed for any project that is located within a City Sphere of Influence, a designated redevelopment area or along a designated State highway. In such cases, the review and approval of a Minor Use Permit, in compliance with Chapter 85.06 will be required.
(c) Exempt from CEQA. A Site Plan Permit application shall be determined exempt from the California
Environmental Quality Act (CEQA) in compliance with State law and the County’s Environmental Review Guidelines or it shall be processed as a Conditional Use Permit or Minor Use Permit.
(Ord. 4011, passed - -2007)
§ 85.08.030 Procedures. ¶
(a) Compliance with Division 5 (Permit Application and Review Procedures). The Site Plan Permit procedure is intended to provide a less complex and more streamlined review than that required for a Conditional Use Permit or Minor Use Permit. The project planner shall review the application in compliance with Division 5 (Permit Application and Review Procedures).
(b) Procedure. Staff review with notice.
(c) Review Authority. Director.
(d) New Construction. In issuing a Site Plan Permit for new construction the Director shall first confirm that the request satisfies all of the following criteria:
(1) The structure and use is in compliance with the applicable provisions of this Development Code; and
(2) The proposed site and any land use(s) or structure(s) existing on the site shall not be in violation of any applicable provision of this Development Code, except for nonconforming uses and structures in compliance with Chapter 84.17 (Nonconforming Uses and Structures).
(e) Reuse of Existing Structure(s). In issuing a Site Plan Permit that proposes to establish a different use in an existing structure, the Director shall first confirm that the request satisfies all of the following criteria in addition to those identified in Subdivision (d), above:
(1) The required number of parking spaces and driveway and parking lot improvements shall be provided and maintained in compliance with Chapter 83.11 (Parking and Loading Standards);
(2) All on-site signs shall be in compliance with Chapter 83.13 (Sign Regulations); and
(3) The proposed use and all existing structures are in compliance with all requirements of previously approved entitlements (e.g., Minor Use Permits, Conditional Use Permits, or Variances, etc.) including conditions of approvals.
(f) On-Site Inspection. An application for a Site Plan Permit may require that the Director perform an on-site
inspection of the subject parcel before confirming that the request complies with all of the applicable criteria and provisions identified in this Section.
(g) Findings. Before granting an application for a Site Plan Permit, the review authority shall make the following findings:
(1) The project complies with all applicable development standards identified in this Development Code or adopted by the Board.
(2) There is supporting infrastructure, existing or available, consistent with the intensity of development, to accommodate the proposed development without significantly lowering service levels.
(3) The proposed use and manner of development are in compliance with the goals, maps, policies, and standards of the General Plan, any applicable community plan or specific plan.
(4) The proposed use and manner of development are exempt from the California Environmental Quality Act (CEQA).
(h) Rejection or Alternative Processing Required. If the review authority cannot make the required findings listed in Subdivision (g), above, the project will be either rejected or elevated to a Minor Use Permit, as determined appropriate by the Director.
(i) Appeal. Appeal of a Site Plan Permit shall be limited to the determination that the land use being requested qualifies for the Site Plan Permit application.
(Ord. 4011, passed - -2007)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Bernardino County Zoning Code
- Chapter 81.01 — PURPOSE AND EFFECT OF DEVELOPMENT CODE
- Chapter 81.02 — INTERPRETATION OF REGULATIONS
- Chapter 82.01 — LAND USE PLAN, LAND USE ZONING DISTRICTS, AND …
- Chapter 82.02 — ALLOWED LAND USES AND DEVELOPMENT
- Chapter 82.03 — AGRICULTURAL AND RESOURCE MANAGEMENT LAND USE …
- Chapter 82.04 — RESIDENTIAL LAND USE ZONING DISTRICTS
- Chapter 82.05 — COMMERCIAL LAND USE ZONING DISTRICTS
- Chapter 82.06 — INDUSTRIAL AND SPECIAL PURPOSE LAND USE ZONING…
- Chapter 82.07 — ADDITIONAL AGRICULTURE (AA) OVERLAY
- Chapter 82.08 — AGRICULTURAL PRESERVE (AP) OVERLAY
- Chapter 82.09 — AIRPORT SAFETY (AR) OVERLAY
- Chapter 82.10 — ALTERNATE HOUSING (AH) OVERLAY
- Chapter 82.11 — BIOTIC RESOURCES (BR) OVERLAY
- Chapter 82.12 — CULTURAL RESOURCES PRESERVATION (CP) OVERLAY
- Chapter 82.13 — FIRE SAFETY (FS) OVERLAY
- Chapter 82.14 — FLOODPLAIN SAFETY (FP) OVERLAY
- Chapter 82.15 — GEOLOGIC HAZARD (GH) OVERLAY
- Chapter 82.16 — HAZARDOUS WASTE (HW) OVERLAY
- Chapter 82.17 — MINERAL RESOURCES (MR) OVERLAY
- Chapter 82.18 — NOISE HAZARD (NH) OVERLAY
- Chapter 82.19 — OPEN SPACE (OS) OVERLAY
- Chapter 82.20 — PALEONTOLOGIC RESOURCES (PR) OVERLAY
- Chapter 82.21 — SIGN CONTROL (SC) OVERLAY
- Chapter 82.22 — SPHERE STANDARDS (SS) OVERLAY
- Chapter 82.23 — COMMUNITY PLANS, SPECIFIC PLANS AND AREA PLANS
- Chapter 82.36 — OAK HILLS COMMUNITY PLAN
- Chapter 83.01 — GENERAL PERFORMANCE STANDARDS
- Chapter 83.02 — GENERAL DEVELOPMENT AND USE STANDARDS
- Chapter 83.03 — AFFORDABLE HOUSING INCENTIVES - DENSITY BONUS
- Chapter 83.04 — CONDITIONAL GRADING COMPLIANCE
- Chapter 83.05 — DEDICATIONS AND INSTALLATIONS OF STREET AND TR…
- Chapter 83.06 — FENCES, HEDGES, AND WALLS
- Chapter 83.07 — LIGHT TRESPASS
- Chapter 83.08 — HILLSIDE GRADING STANDARDS
- Chapter 83.09 — INFRASTRUCTURE IMPROVEMENT STANDARDS
- Chapter 83.10 — LANDSCAPING STANDARDS
- Chapter 83.11 — PARKING AND LOADING STANDARDS
- Chapter 83.12 — ROAD SYSTEM DESIGN STANDARDS
- Chapter 83.13 — SIGN REGULATIONS
- Chapter 83.14 — TRANSPORTATION CONTROL MEASURES
- Chapter 83.15 — CONDITIONAL COMPLIANCE FOR WATER QUALITY MANAG…
- Chapter 84.01 — ACCESSORY STRUCTURES AND USES
- Chapter 84.02 — ADULT BUSINESSES
- Chapter 84.03 — AGRITOURISM ENTERPRISES
- Chapter 84.04 — ANIMAL KEEPING
- Chapter 84.05 — BED AND BREAKFAST USES
- Chapter 84.06 — CEMETERIES
- Chapter 84.07 — COMMERCIAL AND INDUSTRIAL TRANSITIONAL USES
- Chapter 84.09 — FIREWOOD STORAGE
- Chapter 84.10 — GARAGE SALES
- Chapter 84.11 — HAZARDOUS WASTE FACILITIES
- Chapter 84.12 — HOME OCCUPATIONS
- Chapter 84.13 — MASSAGE SERVICES
- Chapter 84.14 — MOBILE HOME PARKS
- Chapter 84.16 — MULTI-FAMILY RESIDENTIAL DEVELOPMENT STANDARDS
- Chapter 84.17 — NONCONFORMING USES AND STRUCTURES
- Chapter 84.18 — PLANNED DEVELOPMENT STANDARDS
- Chapter 84.19 — RECYCLING FACILITIES
- Chapter 84.20 — SERVICE STATIONS
- Chapter 84.21 — SINGLE-FAMILY RESIDENTIAL DWELLINGS
- Chapter 84.22 — SMALL LOT RESIDENTIAL DEVELOPMENT
- Chapter 84.23 — LICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.24 — SOLID WASTE/RECYCLABLE MATERIALS STORAGE
- Chapter 84.25 — TEMPORARY STRUCTURES AND USES
- Chapter 84.26 — WIND ENERGY SYSTEMS - ACCESSORY
- Chapter 84.27 — WIRELESS TELECOMMUNICATION FACILITIES
- Chapter 84.28 — SHORT-TERM RESIDENTIAL RENTALS
- Chapter 84.29 — RENEWABLE ENERGY GENERATION FACILITIES
- Chapter 84.30 — GREENHOUSE GAS EMISSIONS REDUCTION PLAN IMPLEM…
- Chapter 84.32 — SMALL UNLICENSED RESIDENTIAL CARE FACILITIES
- Chapter 84.33 — EMERGENCY SHELTERS
- Chapter 84.34 — COMMERCIAL CANNABIS ACTIVITY
- Chapter 84.35 — INDUSTRIAL HEMP
- Chapter 84.36 — ACCESSORY DWELLING UNITS
- Chapter 85.01 — PERMIT APPLICATION FILING AND PROCESSING
- Chapter 85.02 — BASIC REVIEW PROCEDURES
- Chapter 85.03 — APPLICATION PROCEDURES
- Chapter 85.04 — ABC LICENSING
- Chapter 85.05 — CERTIFICATE OF LAND USE COMPLIANCE
- Chapter 85.06 — CONDITIONAL USE PERMIT/MINOR USE PERMIT
- Chapter 85.07 — FLOOD HAZARD DEVELOPMENT REVIEWS
- Chapter 85.08 — SITE PLAN PERMITS
- Chapter 85.09 — TENANT REVIEW
- Chapter 85.10 — PLANNED DEVELOPMENT PERMITS
- Chapter 85.11 — PRE-CONSTRUCTION FLOOD HAZARD MITIGATION AND E…
- Chapter 85.12 — REVISIONS TO AN APPROVED ACTION
- Chapter 85.13 — SIGN LOCATION PLANS
- Chapter 85.14 — SPECIAL USE PERMITS
- Chapter 85.15 — TEMPORARY USE PERMITS
- Chapter 85.16 — TEMPORARY SPECIAL EVENT PERMITS
- Chapter 85.17 — VARIANCES
- Chapter 85.18 — ACCESSORY WIND ENERGY SYSTEM PERMIT
- Chapter 85.19 — FOOD TRUCK EVENT PERMITS
- Chapter 85.20 — UNLICENSED RESIDENTIAL CARE FACILITIES PERMIT
- Chapter 85.21 — ADULT BUSINESS REGULATORY PERMIT
- Chapter 86.01 — PLANNING AGENCY
- Chapter 86.02 — DEVELOPMENT REVIEW COMMITTEE
- Chapter 86.03 — ENVIRONMENTAL REVIEW COMMITTEE
- Chapter 86.04 — FLOODPLAIN ADMINISTRATOR
- Chapter 86.05 — DECISIONS BY THE REVIEW AUTHORITY
- Chapter 86.06 — TIME LIMITATIONS
- Chapter 86.07 — PUBLIC HEARINGS
- Chapter 86.08 — APPEALS
- Chapter 86.09 — ENFORCEMENT
- Chapter 86.10 — AGRICULTURAL PRESERVES/LAND CONSERVATION CONTR…
- Chapter 86.11 — AIRPORT COMPREHENSIVE LAND USE PLANS
- Chapter 86.12 — AMENDMENTS
- Chapter 86.13 — DEVELOPMENT AGREEMENT ADOPTION AND AMENDMENT
- Chapter 86.14 — SPECIFIC PLAN ADOPTION AND AMENDMENT
- Chapter 86.15 — POST-DISASTER REBUILDING
- Chapter 87.01 — SUBDIVISION ORDINANCE APPLICABILITY AND ADMINI…
- Chapter 87.02 — TENTATIVE MAP FILING AND PROCESSING
- Chapter 87.03 — PARCEL MAPS AND FINAL MAPS
- Chapter 87.04 — ADDITIONAL SUBDIVISION PROCEDURES
- Chapter 87.05 — DEDICATIONS AND EXACTIONS
- Chapter 87.06 — SUBDIVISION DESIGN AND IMPROVEMENT REQUIREMENTS
- Chapter 87.07 — IMPROVEMENT PLANS, INSTALLATION, AND SECURITY
- Chapter 87.08 — SOIL REPORTS
- Chapter 88.01 — PLANT PROTECTION AND MANAGEMENT
- Chapter 88.02 — SOIL AND WATER CONSERVATION
- Chapter 88.03 — SURFACE MINING AND LAND RECLAMATION
- Chapter 89.01 — DRAINAGE FACILITIES FINANCING
- Chapter 89.02 — RECREATIONAL FACILITIES FINANCING
- Chapter 89.03 — TRANSPORTATION FACILITIES FINANCING