Chapter 30 — STORM WATER MANAGEMENT AND DISCHARGE CONTROL›Article II — DISCHARGE REGULATIONS AND REQUIREMENTS
Piedmont Municipal Code § 30.11 Discharge Regulations and Requirements
Piedmont Municipal Code · 2026-09 edition · updated 2026-10-03 · Piedmont
Cite as: Piedmont Municipal Code § 30.11 · Text as of 2026-10-03
30.11.1 Discharge into or connect any pipe or channel to a watercourse;¶
30.11.2 Modify the natural flow of water in a watercourse;¶
30.11.3 Carry out development within a setback;¶
30.11.4 Deposit in, plant in, or remove any material from a watercourse including¶
its banks, except as required for necessary maintenance;
30.11.5 Construct, alter, enlarge, connect to, change, or remove any structure in a¶
30.11.6 Place any loose or unconsolidated material along the side of or within a¶
watercourse or so close to the side as to cause a diversion of the flow, or to
cause a probability of such material being carried away by storm waters
passing through such watercourses.
Get a plain-English answer with a citation back to this text.
Ask AI about this code