Title 13 — UTILITIES AND SEWERS
Chapter 13.04 — POWER RATES AND REGULATIONS
Pasadena Municipal Code · 2026-09 edition · updated 2026-09-29 · Pasadena
Sections in this part
- 4.1 Option A—Seasonal Flat Rate:
- 4.2 Option B—Time-Of-Use Rate:
- 4.3 Power Cost Adjustment: Power cost adjustment to be added to energy services charge.
- 4.1. Option A—Seasonal Flat Rate:
- 4.2 Option B—Time-Of-Use Rate:
- 4.3 Power Cost Adjustment: Power cost adjustment to be added to energy services charge.
- 4.1 Option A—Seasonal Flat Rate:
- 4.2 Option B—Time-Of-Use Rate:
- 4.1 Option A—Seasonal Flat Rate:
- 4.2 Option B—Time-Of-Use Rate:
- 4.1 Option A—Seasonal Flat Rate:
- 4.2 Option B—Time-of-Use Rate:
- 4.1 Time-Of-Use Rate:
- 4.1 Time-Of-Use Rate:
13.04.010 - Short title.¶
13.04.020 - Definitions.¶
13.04.030 - Light and power rate standards.¶
13.04.040 - Residential single-family service.¶
13.04.045 - Residential multi-family service.¶
13.04.050 - Small commercial and industrial service.¶
13.04.173.¶
13.04.060 - Medium commercial and industrial service—Secondary.¶
13.04.173.¶
13.04.064 - Medium Commercial and Industrial Service—Primary.¶
13.04.173.¶
13.04.067 - Large commercial and industrial service—Secondary.¶
13.04.173.¶
13.04.070 - Large commercial and industrial service—Primary.¶
13.04.173.¶
13.04.071 - Special load management and conservation service.¶
13.04.073 - Economic development rates.¶
13.04.075 - Long-term contracts.¶
13.04.080 - Standby service.¶
13.04.085 - Unmetered rates—Non-demand.¶
13.04.087 - Unmetered rates—Demand.¶
13.04.090 - Street lighting and traffic signal service.¶
13.04.100 - Service regulations and charges.¶
13.04.110 - Meter and service installation.¶
13.04.120 - Inspections.¶
13.04.125 - Private underground electric vaults.¶
13.04.130 - City not liable for delivery failures.¶
13.04.140 - Financial responsibility—Delinquency penalty.¶
13.04.150 - Rate schedule changes.¶
13.04.160 - Meter readings combined.¶
13.04.170 - Transmission services charge.¶
13.04.173 - Power cost adjustment.¶
13.04.175 - Reserve for working capital.¶
13.04.176 - Reserved.¶
13.04.177 - Net energy metering.¶
13.04.178 - Self-generation service.¶
13.04.179 - Green power service.¶
13.04.180 - Theft of energy.¶
13.04.190 - Apparatus causing interference.¶
13.04.200 - Billing procedure.¶
13.04.210 - Gaseous lighting units.¶
13.04.220 - Added load.¶
13.04.230 - Public benefit charge.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code