Skip to content

Earlier editions: 2026-09+staging

Chapter 17.134 — CONDITIONAL USE PERMIT PROCEDURE

Oakland Municipal Code · 2026-09 edition · updated 2026-09-27 · Oakland

17.134.010 - Title, purpose, and applicability.

The provisions of this Chapter shall be known as the Conditional Use Permit Procedure. The purpose of these provisions is to prescribe the procedure for the accommodation of uses with special site or design requirements, operating characteristics, or potential adverse effects on surroundings, through review and, where necessary, the imposition of special conditions of approval. This procedure shall apply to all proposals for which a conditional use permit is required by the zoning regulations.

(Ord. No. 13357, § 3(Exh. A), 2-16-2016; prior planning code § 9200)

17.134.020 - Definition of Major and Minor Conditional Use Permits.

A.

Major Conditional Use Permit. A Conditional Use Permit (CUP) is considered a Major Conditional Use Permit if it involves any of the following:

Thresholds. Any project requiring a Conditional Use Permit that meets any of the following size thresholds:

a.

The actual project site (including only portions of the lot actually affected by the project) exceeds one (1) acre;

b.

Nonresidential projects involving more than twenty-five thousand (25,000) square feet of floor area, except in the D-DT, (when not combined with the S-7 Zone), S-15, D-BV, D-CO, or D-LM Zones;

c.

Large-Scale Developments.

i.

Any development not involving one hundred percent (100%) affordable housing units, other than manager's units, which is located in the S-15, D-CO, or D-LM Zones, and results in more than one hundred thousand (100,000) square feet of new floor area;

ii.

Any development not involving one hundred percent (100%) affordable housing units, other than manager's units, which is located in the D-DT Zones (when not combined with the S-7 Zone), and results in more than two hundred thousand (200,000) square feet of new floor area, or a new building or portion thereof of more than two hundred fifty (250) feet in height.

d.

Projects that request to be considered for an exception to the D-LM Height/Bulk/Intensity Area standards, as described in Table 17.101G.04, Note 2.

Uses. Any project requiring a Conditional Use Permit that involves any of the following activity or facility types except where the proposal involves only accessory parking, the resumption of a discontinued nonconforming activity, or an addition to an existing activity which does not increase the existing floor area by more than twenty percent (20%):

a.

Activities:

i.

Extensive Impact Civic;

ii.

Special Health Care Civic;

iii.

Fast-food Restaurant Commercial;

iv.

Convenience Market Commercial;

v.

Alcoholic Beverage Sales Commercial;

vi.

Transient Habitation Commercial;

vii.

Heavy/High Impact Industrial;

viii.

Small Scale Transfer and Storage Hazardous Waste Management Industrial;

ix.

Industrial Transfer/Storage Hazardous Waste Management Industrial;

x.

Mining and Quarrying Extractive.

b.

Facilities:

i.

Drive-Through;

ii.

Advertising Sign, except when the facility meets the requirements of Section 17.11.090.

Special Situations. Any project requiring a Conditional Use Permit that involves any of the following situations:

a.

A project requiring development of an Environmental Impact Report (EIR);

b.

A single establishment containing a Commercial or Industrial Activity, or portion thereof, which is located in any Residential Zone and occupies more than seven thousand five hundred (7,500) square feet of floor area, except where the proposal involves only the resumption of a nonconforming activity;

c.

Off-Street Parking Facilities in the D-DT (except the D-DT-JLI) and D-LM Zones serving fifty (50) or more vehicles;

d.

Monopole Telecommunications Facilities in, or within three hundred (300) feet of the boundary of, any Residential or HBX Zone;

e.

A project in the OS Zones listed as requiring a Major Conditional Use Permit in Chapter 17.11, except that any improvement or change in use consistent with a Park Master Plan that has been adopted by the Oakland City Council shall not require a Conditional Use Permit (as specified in Section 17.135.050), even where it involves facilities or activities that would otherwise require a Major Conditional Use Permit in Section 17.11.060;

f.

An Electroplating Activity as defined in Section 17.09.040 subject to the provisions of Section 17.102.340;

g.

A Telecommunications Facility in or within one hundred (100) feet of the boundary of any Residential Zone, HBX Zone, or the D-CE-3 or D-CE-4 Zone;

h.

A Telecommunications Facility whose antennas and equipment are not fully concealed from view within three hundred (300) feet of the boundary of the RH, RD, RM, RU-1, or RU-2 Zones, HBX Zones, or the D- CE-3 or D-CE-4 Zone;

i.

A project requiring a Conditional Use Permit as set forth under Section 17.153.050 for any demolition or conversion of Residential Hotel Units or a Residential Hotel.

j.

A Park Master Plan for a City-Owned Park, subject to the provisions of Section 17.135.050(A).

B.

Minor Conditional Use Permit. A Minor Conditional Use Permit is a Conditional Use Permit which does not involve any of the purposes listed in Subsection A. of this Section.

(Ord. No. 13812, § 4(Exh. A), 7-30-2024; Ord. No. 13779, § 2(Exh. A), 1-16-2024; Ord. No. 13763, § 5, 10- 3-2023; Ord. No. 13527, § 2, 4-2-2019; Ord. No. 13509, § 2(Exh. A), 12-4-2018; Ord. No. 13501, § 4(Exh. A), 7-24-2018; Ord. No. 13357, § 3(Exh. A), 2-16-2016; Ord. No. 13302, § 5(Exh. C), 4-21-2015; Ord. No. 13276, § 5(Exh. A), 12-9-2014; Ord. No. 13251, § 5(Exh. A), 7-29-2014; Ord. No. 13172, § 3(Exh. A), 7-2- 2013; Ord. No. 13168, § 5(Exh. A-2), 6-18-2013; Ord. No. 13064, § 2(Exh. A), 3-15-2011; Ord. No. 13060, § 2(Exh. A), 3-1-2011; Ord. No. 13042, § 4(Exh. A), 10-19-2010; Ord. No. 12999, § 4(Exh. A), 3-16-2010; Ord. No. 12971, § 2(Exh. A), 9-22-2009; Ord. No. 12955, § 2(Exh. A), 7-21-2009; Ord. 12872 § 4 (part), 2008; Ord. 12868 § 2 (part), 2008; Ord. 12776 § 3, Exh. A (part), 2006: Ord. 12768 § 3 (part), 2006; Ord. 12501 §

80, 2003: Ord. 12450 § 19, 2002; Ord. 12350 § 3 (part), 2001; Ord. 12272 § 4 (part), 2000; Ord. 12237 § 4, 2000; Ord. 12234 § 4, 2000; Ord. 12224 § 7, 2000; Ord. 12205 § 4 (part), 2000; Ord. 12199 § 9 (part), 2000; Ord. 12138 § 4 (part), 1999; Ord. 12078 § 5 (part), 1998; Ord. 12072 § 12, 1998; Ord. 12016 § 2 (part), 1997; Ord. 11904 § 5.91, 1996; Ord. 11892 § 21, 1996; Ord. 11539 § 2, 1993; prior planning code § 9201)

17.134.030 - Application.

An application for a conditional use permit shall be made by the owner of the affected property, or his or her authorized agent, on a form prescribed by the City Planning Department and shall be filed with such Department. The application shall be accompanied by such information including, but not limited to, site and building plans, drawings and elevations, and operational data, as may be required to enable the pertinent criteria to be applied to the proposal, and by the fee prescribed in the fee schedule in Chapter

17.134.040 - Procedures for consideration.

A.

Major Conditional Use Permits.

In All Zones. An application for a Major Conditional Use Permit shall be considered by the City Planning Commission which shall hold a public hearing on the application. Notice of the hearing shall be given by posting an enlarged notice on the premises of the subject property involved in the application. Notice of the hearing shall also be given by mail or delivery to all owners and occupants of real property in the City within three hundred (300) feet of the property involved; provided, however, that failure to send notice to any such owner where his or her address is not shown on the last available equalized assessment roll shall not invalidate the affected proceedings. All such notices shall be given not less than seventeen (17) days prior to the date set for the hearing. While the hearing is open, any interested party must enter into the record any issues and/or oral, written, and/or documentary evidence to the Commission for its consideration; failure to do so will preclude the party from raising such issues and/or evidence during the appeal hearing and/or in court. The Commission shall determine whether the proposal conforms to the general use permit criteria set forth in Section 17.134.050 and to other applicable use permit criteria, and may grant or deny the application for the proposed conditional use permit or require such changes or impose such reasonable conditions of approval as are in its judgment necessary to carry out the purposes of the zoning regulations and ensure conformity to said criteria. The determination of the Commission shall become final ten (10) calendar days after the date of decision unless appealed to the City Council in accordance with Section

17.134.070.

Any party seeking to appeal the determination will be limited to issues and/or evidence

presented to the Commission prior to the close of the Commission's public hearing on the matter, in accordance with the above procedures. In the event the last date of appeal falls on a weekend or holiday when City offices are closed, the next date such offices are open for business shall be the last date of appeal.

Alcoholic Beverage Sales Activities in Alcoholic Beverage Sales License Overconcentrated Areas. In addition to following the provisions of Subsection A.1. of this Section, the City Planning Commission shall also determine whether the proposal conforms to the criteria for findings of "Public Convenience and Necessity" set forth in Subsection 17.103.030.B.3.

In the OS Zone. Applications for conditional use permits in the OS Zone shall be subject to the special use permit review procedure for the OS Zone established in Chapter 17.135.

B.

Minor Conditional Use Permits.

In All Zones. An application for a Minor Conditional Use Permit shall be considered by the Director of City Planning. However, the Director may, at his or her discretion, refer the application to the City Planning Commission for decision rather than acting on it himself or herself. In this case, the application shall still be considered a minor permit, but shall be processed according to the procedure in Subsection A. of this Section. In these instances, any other minor permits associated with the application shall be considered concurrently by the Planning Commission, pursuant to Section 17.130.090. Notice shall be given by posting an enlarged notice on the premises of the subject property involved in the application; notice shall also be given by mail or delivery to all owners and occupants of real property in the City within three hundred (300) feet of the property involved; provided, however, that failure to send notice to any such owner where his or her address is not shown on the last available equalized assessment roll shall not invalidate the affected proceedings. All such notices shall be given not less than seventeen (17) days prior to the date set for the hearing, if such is to be held, or, if not, for decision on the application by the Director. Any interested party must enter into the record any issues and/or oral, written, and/or documentary evidence: (a) to the Director prior to the close of the written public comment period for his or her consideration, or (b) to the Commission while the hearing is open for its consideration, whichever is applicable; failure to do so will preclude the party from raising such issues and/or evidence during the appeal hearing and/or in court. The Director shall determine whether the proposal conforms to the general use permit criteria set forth in Section 17.134.050 and to other applicable use permit criteria, and may grant or deny the application for the proposed conditional use permit or require such changes in the proposed use or impose such reasonable conditions of approval as are in his or her judgment necessary to carry out the purposes of the zoning regulations and ensure conformity to said criteria. The determination of the Director of City Planning shall become final ten (10) calendar days after the date of decision unless appealed to the City Planning Commission in accordance with Section 17.134.060. In those cases which are referred to the Commission by the Planning Director, the decision of the Commission shall become final ten (10) days after the date of decision unless appealed to the City Council in accordance with Section

17.134.070.

Any party seeking to appeal the determination will be limited to issues and/or evidence

presented (a) to the Director prior to the close of the written public comment period, or (b) to the Commission prior to the close of the Commission's public hearing on the matter, whichever is applicable, in accordance with the above procedures. In the event the last date of appeal falls on a weekend or holiday

when City offices are closed, the next date such offices are open for business shall be the last date of appeal.

In the OS Zone. Applications for conditional use permits in the OS Zone shall be subject to the special use permit review procedure for the OS Zone established in Chapter 17.135.

C.

Alternative Notification Procedures. If the conditions as set forth in Section 17.130.020 apply, alternative notification procedures discussed therein may replace or supplement the procedures set forth in Subsections A. and B. of this Section.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13357, § 3(Exh. A), 2-16-2016; Ord. No. 13270, § 3(Exh. A), 11- 18-2014; Ord. No. 13172, § 3(Exh. A), 7-2-2013; Ord. 12872 § 4 (part), 2008; Ord. 12776 § 3, Exh. A (part), 2006: Ord. 12237 § 4 (part), 2000; Ord. 12073 § 5 (part), 1998; Ord. 11904 §§ 5.92, 5.93, 1996; Ord. 11831 § 5, 1995; prior planning code § 9203)

17.134.050 - General use permit criteria.

Except

as different criteria are prescribed elsewhere in the zoning regulations, a Conditional Use Permit shall be granted only if the proposal conforms to all the following general use permit criteria, as well as to all other applicable use permit criteria:

A.

That the location, size, design, and operating characteristics of the proposed development will be compatible with and will not adversely affect the livability or appropriate development of abutting properties and the surrounding neighborhood, with consideration to be given to harmony in scale, bulk, coverage, and density; to the availability of civic facilities and utilities; to the generation of traffic and the capacity of surrounding streets; and to any other relevant impact of the development;

B.

That the location, design, and site planning of the proposed development will provide a convenient and functional living, working, shopping, or civic environment;

C.

That the proposed development will enhance the successful operation of the surrounding area in its basic community functions, or will provide an essential service to the community or region;

D.

That the proposal conforms to all applicable Regular Design Review criteria set forth in the Regular Design Review procedure at Section 17.136.050;

E.

That the proposal conforms in all significant respects with the Oakland General Plan and with any other applicable guidelines or criteria, district plan or development control map which has been adopted by the Planning Commission or City Council.

F.

For proposals involving a One-Family Residential Facility: If the Conditional Use Permit concerns a regulation governing maximum height, minimum yards, maximum lot coverage, or maximum floor area ratio, the proposal also conforms with at least one of the following additional criteria:

The proposal when viewed in its entirety will not adversely impact abutting residences to the side, rear, or directly across the street with respect to solar access, view blockage and privacy to a degree greater than that which would be possible if the residence were built according to the applicable regulation, and, for Conditional Use Permits that allow height increases, the proposal provides detailing, articulation or other design treatments that mitigate any bulk created by the additional height; or

At least sixty percent (60%) of the lots in the immediate context are already developed and the proposal would not exceed the corresponding as-built condition on these lots, and, for conditional use permits that allow height increases, the proposal provides detailing, articulation or other design treatments that mitigate any bulk created by the additional height. The immediate context shall consist of the five (5) closest lots on each side of the project site plus the ten (10) closest lots on the opposite side of the street (see illustration I-4b); however, the Director of City Planning may make an alternative determination of immediate context based on specific site conditions. Such determination shall be in writing and included as part of any decision on any conditional use permit.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13172, § 3(Exh. A), 7-2-2013; Ord. No. 13064, § 2(Exh. A), 3-15- 2011; Ord. No. 12999, § 4(Exh. A), 3-16-2010; Ord. 12776 § 3, Exh. A (part), 2006: Ord. 12376 § 3 (part), 2001: prior planning code § 9204)

17.134.060 - Appeal to Planning Commission—Minor conditional use permits.

Within ten (10) calendar days after the date of a decision by the Director of City Planning on an application for a Minor Conditional Use Permit, an appeal from said decision may be taken to the City Planning Commission by the applicant or any other interested party. In the case of appeals involving One-Family or Two- to Four-Family Residential Facilities, the appeal shall be considered by the Commission's Residential Appeals Committee. In the event the last date of appeal falls on a weekend or holiday when City offices are closed, the next date such offices are open for business shall be the last date of appeal. Such appeal shall be made on a form prescribed by the City Planning Department and shall be filed with such Department, along with the appropriate fees required by the City's Master Fee Schedule. The appeal shall state specifically wherein it is claimed there was an error or abuse of discretion by the Director or wherein his or her decision is not supported by the evidence in the record. The appeal itself must raise each and every issue that is contested, along with all the arguments and evidence in the record, previously presented to the

Director of City Planning prior to the close of the written public comment period on the item, which supports the basis of the appeal; failure to do so will preclude the appellant from raising such issues and/or evidence during the appeal and/or in court. The appeal is not de novo. Upon receipt of the appeal, the Secretary of the City Planning Commission shall set the date for consideration thereof. Not less than seventeen (17) days prior to the date of the Commission's or Committee's consideration of the appeal, written notice shall be given to: the applicant; the appellant in those cases where the applicant is not the appellant; adverse party or parties, or to the attorney, spokesperson, or representative of such party or parties; other interested groups and neighborhood associations who have requested notification; and to similar groups and individuals as the Secretary deems appropriate, of the date and place of the hearing on the appeal. During the hearing on the appeal, the appellant will be limited to issues and/or evidence presented to the Director of City Planning prior to the close of the written public comment period for the underlying decision being appealed, as the appeal is not de novo. The appellant shall not be permitted to present any other issues and/or evidence (written, oral, or otherwise) during the appeal process. In considering the appeal, the Commission or, if applicable, the Committee shall determine whether the proposal conforms to the general use permit criteria set forth in Section 17.134.050 and to any other applicable use permit criteria, and may grant or deny a permit or require such changes in the proposed use or impose such reasonable conditions of approval as are in its judgment necessary to carry out the purposes of the zoning regulations and ensure conformity to said criteria. The decision of the Commission or, if applicable, the Committee shall be final.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13270, § 3(Exh. A), 11-18-2014; Ord. No. 13172, § 3(Exh. A), 7- 2-2013; Ord. 12872 § 4 (part), 2008; Ord. 12776 § 3, Exh. A (part), 2006: Ord. 12376 § 3 (part), 2001: prior planning code § 9205)

17.134.070 - Appeal to Council—Major Conditional Use Permits.

A.

With the exceptions of appeal for adult entertainment activities, appeals to the City Council shall be governed by the following:

Within ten (10) calendar days after the date of a decision by the City Planning Commission on an application for a Major Conditional Use Permit, an appeal from said decision may be taken to the City Council by the applicant, the permit holder, or any other interested party. In event the last date of appeal falls on a weekend or holiday when City offices are closed, the next date such offices are open for business shall be the last date of appeal. Such appeal shall be made on a form prescribed by the Planning Director and shall be filed with the Planning and Building Department, along with the appropriate fees required by the City's Master Fee Schedule. The appeal shall state specifically wherein it is claimed there was an error or abuse of discretion by the Commission or wherein its decision is not supported by the evidence in the record. The appeal itself must raise each and every issue that is contested, along with all the arguments and evidence in the record. previously presented to City Planning Commission prior to the close of its public hearing on the item, which supports the basis of the appeal; failure to do so will preclude the appellant from raising such issues and/or evidence during the appeal and/or in court. The appeal is not de novo. Upon receipt of the appeal, the Council shall set the date for consideration thereof. After setting the hearing date, the Council, prior to hearing the appeal, may refer the matter back to the Planning Commission for further consideration and advice. Appeals referred to the Planning Commission shall be

considered by the Commission at its next available meeting. Any such referral shall be only for the purpose of issue clarification and advice. In all cases, the City Council shall retain jurisdiction and, after receiving the advice of the Planning Commission, shall hold a hearing on and decide the appeal. The City Clerk shall notify the Secretary of the City Planning Commission of the date set for consideration thereof. Not less than seventeen (17) days prior thereto, written notice shall be given to: the applicant; the appellant in those cases where the applicant is not the appellant; adverse party or parties, or to the attorney, spokesperson, or representative of such party or parties; other interested groups and neighborhood associations who have requested notification; and to similar groups and individuals as the Secretary deems appropriate, of the date and place of the hearing on the appeal. During the hearing on the appeal, the appellant will be limited to issues and/or evidence presented prior to the close of the City Planning Commission's public hearing on the item, in accordance with the above procedures, as the appeal is not de novo. The appellant shall not be permitted to present any other issues and/or evidence (written, oral, or otherwise) during the appeal process. In considering the appeal, the Council shall determine whether the proposed use conforms to the applicable use permit criteria, and may grant or deny a permit or require such changes in the proposed use or impose such reasonable conditions of approval as are, in its judgment, necessary to carry out the purposes of the zoning regulations and ensure conformity to said criteria. The decision of the City Council shall be made by resolution and shall be final.

B.

Appeals to the City Council relating to adult entertainment activities shall be governed by the following:

Within ten (10) calendar days after the date of a decision by the City Planning Commission on an application for a Major Conditional Use Permit, an appeal from said decision may be taken to the City Council by the applicant, the permit holder, or any other interested party. In event the last date of appeal falls on a weekend or holiday when City offices are closed, the next date such offices are open for business shall be the last date of appeal. Such appeal shall be made on a form prescribed by the Planning Director and shall be filed with the Planning and Building Department, along with the appropriate fees required by the City's Master Fee Schedule. The appeal shall state specifically wherein it is claimed there was an error or abuse of discretion by the Commission or wherein its decision is not supported by the evidence in the record. The appeal itself must raise each and every issue that is contested, along with all the arguments and evidence in the record, previously presented to City Planning Commission prior to the close of its public hearing on the item, which supports the basis of the appeal; failure to do so will preclude the appellant from raising such issues and/or evidence during the appeal and/or in court. The appeal is not de novo. Upon receipt of the appeal, the Council shall set the date for consideration thereof. The City Clerk shall notify the Secretary of the City Planning Commission of the date set for consideration thereof. Not less than seventeen (17) days prior thereto, written notice shall be given to: the applicant; the appellant in those cases where the applicant is not the appellant; adverse party or parties, or to the attorney, spokesperson, or representative of such party or parties; other interested groups and neighborhood associations who have requested notification; and to similar groups and individuals as the Secretary deems appropriate, of the date and place of the hearing on the appeal. During the hearing on the appeal, the appellant will be limited to issues and/or evidence presented prior to the close of the City Planning Commission's public hearing on the item, in accordance with the above procedures, as the appeal is not de novo. The appellant shall not be permitted to present any other issues and/or evidence (written, oral, or otherwise) during the appeal process. In considering the appeal, the Council shall determine whether the proposed use conforms to the applicable special use permit criteria, and shall grant the permit if it

determines that all the said criteria are present or require such chances in the proposed use or impose such reasonable conditions of approval as are, in its judgment, necessary to carry out the purposes of the zoning regulations and ensure conformity to said criteria. The decision of the City Council shall be made by resolution and shall be final. The City Council shall vote on the appeal within thirty (30) days after its first hearing of the appeal and must decide the appeal within sixty (60) days of the appeal being filed.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13596, § 2(Exh. A), 6-2-2020; Ord. No. 13270, § 3(Exh. A), 11- 18-2014; Ord. No. 13172, § 3(Exh. A), 7-2-2013; Ord. 12872 § 4 (part), 2008; Ord. 12776 § 3, Exh. A (part), 2006: Ord. 12199 § 9 (part), 2000; prior planning code § 9206)

17.134.080 - Adherence to approved plans.

A.

A Conditional Use Permit shall be subject to the plans and other conditions upon the basis of which it was granted. Except as indicated in Subsection B. below or unless a different termination date is prescribed, the permit shall terminate three (3) years from the effective date of its granting unless, within such period, all necessary permits for construction or alteration have been filed with the Planning and Building Department and diligently pursued towards completion, or the authorized activities have commenced in the case of a permit not involving construction or alteration. Upon written request and payment of appropriate fees submitted no later than the expiration date of this approval, the Zoning Manager, or his or her designee, may grant up to a two-year extension of this date, with additional extensions subject to approval by the original reviewing officer or body. Expiration of any necessary building permit for the project may invalidate the Conditional Use Permit approval if said approval or extension period has also expired. If litigation is filed challenging this approval, or its implementation, then the time period stated above for obtaining necessary permits for construction or alteration and/or commencement of authorized activities is automatically extended for the duration of the litigation.

B.

In order to support implementation of the City's 2023-2031 Housing Element, the following shall supercede the applicable provisions in Subsection A. for the time period of January 31, 2023 to January 31, 2031:

A Conditional Use Permit granted for the creation of residential units between January 31, 2023 and January 31, 2026 shall terminate five (5) years from the effective date of its granting unless all necessary permits for construction, alteration, demolition, or removal, as the case may be, have been filed with the Planning and Building Department and diligently pursued towards completion within such period. Upon written request and payment of appropriate fees submitted no later than the expiration date of this approval, the Zoning Manager, or his or her designee, may grant up to a three-year extension of this date; and

A Conditional Use Permit granted before January 31, 2023 for the creation of residential units that has not expired before that date shall be granted an automatic extension to January 31, 2028. Upon written request

and payment of appropriate fees submitted no later than the expiration date of this approval, the Zoning Manager, or his or her designee, may grant up to a three-year extension of this date.

(Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13518, § 4(Exh. A), 2-5-2019; Ord. No. 13357, § 3(Exh. A), 2-16- 2016; Ord. 12776 § 3, Exh. A (part), 2006: prior planning code § 9207)

17.134.110 - Conditional Use Permit related to Planned Unit Development or subdivision.

Whenever a Conditional Use Permit is required for a proposal also requiring a Planned Unit Development permit, application for the use permit shall be included in the application for the Planned Unit Development permit, and shall be processed and considered as part of same. Whenever a Conditional Use Permit is required within a proposed subdivision, the application for the use permit shall be submitted with the tentative map or tentative parcel map required by the Oakland Municipal Code, and may be processed and considered therewith. In either case, however, the reviewing officer or body shall, in considering such a use permit, determine whether the proposal conforms to all the applicable use permit criteria.

(Ord. No. 13596, § 2(Exh. A), 6-2-2020; Ord. No. 13172, § 3(Exh. A), 7-2-2013; Prior planning code § 9209)

17.134.120 - Limitation on resubmission.

Whenever an application for a major conditional use permit has been denied by the City Council or denied by the Planning Commission and the applicant fails to file a timely appeal with the City Council, no such application for essentially the same proposal affecting the same property, or any portion thereof, shall be filed within one year after the date of denial. This section shall not apply in instances where the applicant can show, on the face of any subsequent application, changed circumstances sufficient to justify a reheating. Applications for hearing pursuant to this section shall be considered by the Director of City Planning. A determination by the Director shall become final ten (10) calendar days after the date of decision unless appealed to the City Planning Commission. In event the last date of appeal falls on a weekend or holiday when city offices are closed, the next date such offices are open for business shall be the last date of appeal. Any such decision by the City Planning Commission shall be final.

(Ord. 12872 § 4 (part), 2008; Prior planning code § 9210)

17.134.130 - Termination of a Conditional Use Permit.

A.

A Conditional Use Permit (CUP) granted pursuant to the provisions of this Chapter that permits an activity shall not be of any force or effect if the following is true:

With the exception of closures required to repair damage or destruction to the facility containing the activity, the subject activity is nonresidential and has ceased, or has been suspended, for a consecutive period of three (3) or more years. In the M-40, CIX, IG, IO, D-DT-JLI, D-CE-5, D-CE-6, D-CO-5, and D-CO-6 Zones, the subject Truck-Intensive Industrial Activity (as defined in Section 17.103.065) has ceased, or has been suspended, for a consecutive period of six (6) or more months.

B.

A single, one-year extension of the period described in subsection (A) may be granted by, and at the discretion of, the Director of the Bureau of Planning, or his or her designee. The request for the extension shall be: 1) in writing, 2) made by the applicant or owner of the subject site, and 3) made prior to the three (3) year period described in subsection (A). Notwithstanding the above, no extension request shall be granted for Truck-Intensive Industrial Activities (as defined in Section 17.103.065) in the M-40, CIX, IG, IO, D-DT-JLI, D-CE-5, D-CE-6, D-CO-5, and D-CO-6 Zones.

(Ord. No. 13812, § 4(Exh. A), 7-30-2024; Ord. No. 13763, § 5, 10-3-2023; Ord. No. 13518, § 4(Exh. A), 2-5- 2019)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Oakland Municipal Code
Oakland Municipal Code
  1. Article I — POWERS AND FORM OF GOVERNMENT
  2. Article II — THE COUNCIL
  3. Article III — THE MAYOR
  4. Article IV — CITY OFFICERS
  5. Article V — THE CITY MANAGER
  6. Article VI — ADMINISTRATIVE ORGANIZATION
  7. Article VII — PORT OF OAKLAND
  8. Article VIII — FISCAL ADMINISTRATION
  9. Article IX — PERSONNEL ADMINISTRATION
  10. Article X — FRANCHISES, LICENSES, PERMITS, LEASES AND SALES
  11. Article XI — ELECTIONS
  12. Article XII — GENERAL PROVISIONS
  13. Article XIV — RESERVED
  14. Article XV — RESERVED
  15. Article XVI — THE CHILDREN'S INITIATIVE OF 2018
  16. Article XX — OAKLAND MUNICIPAL EMPLOYEES' RETIREMENT SYSTEM
  17. Article XXI — MISCELLANEOUS
  18. Article XXVI — Added By: Stats. 1951; POLICE AND FIRE RETIREME…
  19. Article XXVII — Added By: Stats. 1955 OFF-STREET VEHICULAR PAR…
  20. Title 1 — GENERAL PROVISIONS
  21. Article I — Bidding Contracting and Purchasing
  22. Article II — City Policy Regarding Banks and Firms Which Do Bu…
  23. Chapter 2.05 — OAKLAND MUSEUM OF CALIFORNIA COLLECTION ACQUISI…
  24. Chapter 2.06 — PROMPT PAYMENT
  25. Chapter 2.07 — GRANT AWARD APPROVAL
  26. Chapter 2.08 — CIVIL SERVICE RULES AND PROCEDURES
  27. Chapter 2.10 — FIREARMS AND AMMUNITION PROCUREMENT AND DISPOSAL
  28. Chapter 2.12 — DEBARMENT PROGRAM
  29. Chapter 2.16 — MAP OF CITY COUNCIL DISTRICTS
  30. Article I — In General
  31. Article II — Public Access to Meetings
  32. Article III — Public Information
  33. Article IV — Policy Implementation
  34. Chapter 2.22 — CITY PROHIBITED FROM DOING BUSINESS WITH FEDERA…
  35. Chapter 2.23 — SANCTUARY CITY CONTRACTING AND INVESTMENT ORDIN…
  36. Chapter 2.24 — PUBLIC ETHICS COMMISSION
  37. Chapter 2.25 — CITY OF OAKLAND GOVERNMENT ETHICS ACT
  38. Chapter 2.26 — TICKET DISTRIBUTION POLICY
  39. Chapter 2.28 — LIVING WAGE ORDINANCE
  40. Chapter 2.29 — CITY AGENCIES, DEPARTMENTS AND OFFICES
  41. Chapter 2.30 — EQUAL ACCESS TO SERVICES
  42. Chapter 2.32 — EQUAL BENEFITS ORDINANCE
  43. Chapter 2.34 — IDENTIFICATION CARDS
  44. Chapter 2.36 — WORKER RETENTION AT LARGE-SCALE HOSPITALITY BUS…
  45. Chapter 2.38 — OAKLAND WHISTLEBLOWER ORDINANCE
  46. Chapter 2.40 — PROHIBITION ON NEPOTISM IN CITY EMPLOYMENT
  47. Chapter 2.41 — ACQUISITION AND LEASE OF REAL PROPERTY BY CITY
  48. Article I — General Provisions
  49. Article II — Sale of City-Owned Real Property, Generally
  50. Article III — Lease of City-Owned Real Property, Generally
  51. Article IV — Sale or Lease of City-Owned Real Property for Dev…
  52. Article V — Special Licenses and Leases
  53. Chapter 2.43 — GRANT OF PUBLIC UTILITY FRANCHISES
  54. Chapter 2.44 — DEPARTMENT OF WORKPLACE AND EMPLOYMENT STANDARDS
  55. Chapter 2.45 — OAKLAND POLICE COMMISSION
  56. Chapter 2.46 — COMMUNITY POLICE REVIEW AGENCY
  57. Chapter 2.47 — PUBLIC SAFETY PLANNING AND OVERSIGHT COMMISSION
  58. Chapter 2.48 — WILDFIRE PREVENTION COMMISSION
  59. Chapter 3.04 — CITY COUNCIL DISTRICTS
  60. Article I — General Provisions
  61. Article II — Elections for Elective Office
  62. Chapter 3.12 — THE CITY OF OAKLAND CAMPAIGN REFORM ACT
  63. Article I — Findings and Purpose
  64. Article II — Definitions
  65. Article III — Contribution Limitations
  66. Article IV — Political Communications
  67. Article VI — Electronic Filing and Recordkeeping Requirements
  68. Article VII — Violations Related to Enforcement
  69. Article VIII — Agency Responsibility and Authority
  70. Article VIII — Enforcement
  71. Article IX — Miscellaneous Provisions
  72. Chapter 3.13 — LIMITED PUBLIC FINANCING ACT OF 2024
  73. Article III — Election Campaign Fund
  74. Article IV — Eligibility for Public Financing
  75. Article V — Disbursement of Public Financing
  76. Chapter 3.14 — OAKLAND FALSE ENDORSEMENT IN CAMPAIGN LITERATURE
  77. Article III — Prohibition on False Endorsements
  78. Article IV — Enforcement
  79. Article V — Miscellaneous
  80. Article I — Findings and Purpose.
  81. Article III — Agency Duties
  82. Article IV — Democracy Dollars
  83. Article V — Limits and Restrictions
  84. Article VI — Enforcement
  85. Article VII — Miscellaneous
  86. Chapter 3.16 — CONFLICT OF INTEREST CODE
  87. Chapter 3.20 — THE CITY OF OAKLAND LOBBYIST REGISTRATION ACT
  88. Article II — Definitions and Interpretation of This Act
  89. Article III — Registration of Lobbyists
  90. Article IV — Disclosure of Lobbying Activities
  91. Article V — Prohibitions
  92. Article VI — Enforcement and Penalties
  93. Chapter 4.04 — FISCAL PROVISIONS GENERALLY
  94. Chapter 4.08 — BEDROOM TAX
  95. Chapter 4.12 — CIGARETTE TAX
  96. Chapter 4.16 — PARKING TAX
  97. Chapter 4.20 — REAL PROPERTY TRANSFER TAX
  98. Chapter 4.24 — TRANSIENT OCCUPANCY TAX
  99. Chapter 4.26 — TRANSACTIONS AND USE TAX
  100. Chapter 4.28 — UTILITY USERS TAX
  101. Chapter 4.32 — CITY RESIDENTIAL MORTGAGE REVENUE BOND LAW
  102. Chapter 4.36 — CITY HEALTH FACILITY REVENUE BOND LAW
  103. Chapter 4.40 — CITY ECONOMIC DEVELOPMENT REVENUE BOND LAW
  104. Chapter 4.44 — PFRS PENSION OBLIGATION BOND LAW
  105. Chapter 4.48 — BUSINESS IMPROVEMENT MANAGEMENT DISTRICTS
  106. Article I — General Provisions and Definitions
  107. Article II — Issuance of Bonds
  108. Article III — Miscellaneous Provisions
  109. Chapter 4.52 — SUGAR-SWEETENED BEVERAGE DISTRIBUTION TAX
  110. Chapter 4.54 — AFFORDABLE HOUSING AND INFRASTRUCTURE BOND LAW
  111. Article III — Miscellaneous Bond Provisions
  112. Article IV — Anti-Displacement and Affordable Housing Bond Law…
  113. Chapter 4.56 — VACANT PROPERTY TAX
  114. Chapter 4.58 — OAKLAND ZOO ANIMAL CARE, EDUCATION AND IMPROVEM…
  115. Chapter 5.02 — BUSINESS PERMITS GENERALLY
  116. Chapter 5.04 — BUSINESS TAXES GENERALLY
  117. Chapter 5.06 — ADVERTISING MATTER
  118. Chapter 5.08 — AUCTIONS AND AUCTIONEERS
  119. Chapter 5.10 — BINGO
  120. Chapter 5.12 — ENTERTAINMENT VENUES
  121. Chapter 5.14 — CARNIVALS
  122. Chapter 5.16 — CABLE SYSTEMS AND OPEN VIDEO SYSTEMS
  123. Part 1 — General Provisions
  124. Part 2 — Definitions
  125. Part 3 — Fees
  126. Part 4 — Customer Service
  127. Part 5 — Permits and Construction
  128. Part 6 — Public, Education and Government ("PEG") Requirements
  129. Part 7 — Reports and Notices
  130. Chapter 5.18 — CHARITABLE AND RELIGIOUS SOLICITATIONS
  131. Chapter 5.19 — UNATTENDED DONATION/COLLECTION BOXES
  132. Article II — UDCB Permit Requirement and Process
  133. Article III — Standards and Requirements
  134. Article IV — Code Enforcement
  135. Article V — Noticing Procedure for Removal
  136. Chapter 5.20 — CLOSE-OUT SALES
  137. Chapter 5.22 — DANCE HALLS
  138. Chapter 5.24 — FILMING PERMITS
  139. Chapter 5.26 — FIREARMS DEALERS
  140. Chapter 5.28 — FLYING FIELDS, HELIPORTS AND HELISTOPS
  141. Chapter 5.30 — FOR-HIRE VEHICLES
  142. Chapter 5.32 — FRANCHISES
  143. Chapter 5.33 — HOME MORTGAGE LENDING
  144. Chapter 5.34 — HOTEL RATES AND REGISTRATION REQUIREMENTS
  145. Chapter 5.36 — MASSAGE ESTABLISHMENT AND MASSAGE THERAPISTS
  146. Chapter 5.38 — MATTRESSES
  147. Chapter 5.40 — MECHANICAL AND ELECTRONIC GAMES
  148. Chapter 5.42 — MINIATURE GOLF COURSES
  149. Chapter 5.43 — OAKLAND ARTISAN MARKETPLACE
  150. Chapter 5.44 — OUTDOOR AMUSEMENT CENTERS
  151. Chapter 5.46 — PAWNBROKERS, SECONDHAND DEALERS, SCRAP DEALERS …
  152. Chapter 5.48 — PEDDLERS AND SOLICITORS
  153. Chapter 5.50 — POOL ROOMS AND BOWLING ALLEYS
  154. Chapter 5.51 — FOOD VENDING PROGRAM
  155. Article II — Standards and Requirements
  156. Article III — Enforcement, Revocation and Abatement
  157. Chapter 5.52 — PRIVATE PATROL SERVICES AND PRIVATE WATCHMAN
  158. Chapter 5.54 — RENDERING
  159. Chapter 5.56 — RIDING ACADEMIES
  160. Chapter 5.58 — SCHOOL STORES
  161. Chapter 5.60 — SKATING RINKS
  162. Chapter 5.62 — STREET CARS
  163. Chapter 5.64 — TAXICABS
  164. Chapter 5.66 — THEATERS
  165. Chapter 5.68 — TRAMPOLINE CENTERS
  166. Chapter 5.70 — MISCELLANEOUS BUSINESS REGULATIONS
  167. Chapter 5.72 — RECREATIONAL VEHICLE ON UNDEVELOPED PROPERTY PI…
  168. Chapter 5.80 — MEDICAL AND ADULT-USE CANNABIS DISPENSARY PERMITS
  169. Chapter 5.81 — MEDICAL AND ADULT-USE CANNABIS CULTIVATION, MAN…
  170. Chapter 5.90 — SKATE PARK FACILITIES
  171. Chapter 5.91 — LICENSURE OF TOBACCO RETAILERS
  172. Chapter 5.92 — CITY MINIMUM WAGE, SICK LEAVE, AND OTHER EMPLOY…
  173. Chapter 5.93 — HOTEL MINIMUM WAGE AND WORKING CONDITIONS
  174. Chapter 5.95 — HOSPITALITY AND TRAVEL WORKER RIGHT TO RECALL
  175. Chapter 5.96 — GROCERY WORKER HAZARD PAY
  176. Chapter 5.97 — CAP ON THE COMMISSIONS, CHARGES, AND FEES OF FO…
  177. Chapter 6.04 — ANIMAL CONTROL REGULATIONS GENERALLY
  178. Chapter 6.08 — POTENTIALLY DANGEROUS AND VICIOUS DOGS
  179. Chapter 8.02 — BURGLAR ALARM SYSTEMS
  180. Chapter 8.03 — HOTEL, MOTEL AND ROOMING HOUSE OPERATING STANDA…
  181. Chapter 8.04 — COMMERCIAL BUILDING SECURITY REQUIREMENTS
  182. Chapter 8.06 — EXPLOSIVES AND FIREWORKS
  183. Chapter 8.07 — DISPOSABLE FOOD SERVICE WARE
  184. Chapter 8.08 — FOOD HANDLING ESTABLISHMENTS
  185. Chapter 8.10 — VANDALISM BY DEFACEMENT OF PROPERTY (GRAFFITI)
  186. Article I — Purpose and Introductory Sections
  187. Article II — Graffiti Public Nuisance and Unlawful
  188. Article III — Graffiti Abatement
  189. Article IV — Municipal Code Liability, Remedies, and Penalties…
  190. Article V — Sale of Graffiti Implements to Minors
  191. Article VI — State Graffiti Laws
  192. Article VII — Graffiti Abatement Funding and Rewards
  193. Article VIII — Administrative Appeals
  194. Article IX — Miscellaneous
  195. Article I — Findings and Purposes
  196. Article III — Illegal Dumping and Littering as Unlawful and Pu…
  197. Article IV — Administrative, Civil, and Criminal Liabilities a…
  198. Article V — Special Liabilities and Responsibilities
  199. Article VI — Community Service
  200. Article VII — Reward Fund
  201. Article VIII — Administrative Appeals
  202. Article IX — Miscellaneous Sections
  203. Chapter 8.12 — HAZARDOUS MATERIALS
  204. Chapter 8.14 — MEAT
  205. Chapter 8.16 — MILK AND MILK PRODUCTS
  206. Chapter 8.18 — NUISANCES
  207. Chapter 8.19 — WOOD-BURNING APPLIANCES
  208. Chapter 8.20 — PAY TELEPHONES
  209. Chapter 8.21 — AUTOMATED PURCHASING MACHINES
  210. Chapter 8.22 — RESIDENTIAL RENT ADJUSTMENTS AND EVICTIONS
  211. Article I — Residential Rent Adjustment Program
  212. Article II — Just Cause for Eviction Ordinance (Measure EE)
  213. Article III — Terminating Tenancy to Withdraw Residential Rent…
  214. Article IV — Rent Program Service Fee
  215. Article V — Tenant Protection Ordinance
  216. Article VI — TENANT MOVE OUT AGREEMENT ORDINANCE
  217. Article VII — UNIFORM RESIDENTIAL TENANT RELOCATION ORDINANCE
  218. Article VIII — RELOCATION PAYMENTS FOR OWNER OR RELATIVE MOVE-…
  219. Article IX — Equitable Access to Low-Income ("EQUAL") Housing …
  220. Chapter 8.24 — PROPERTY BLIGHT
  221. Chapter 8.25 — RONALD V. DELLUMS AND SIMBARASHE SHERRY FAIR CH…
  222. Chapter 8.26 — SCRAP YARD ABATEMENT PROCEDURES
  223. Chapter 8.28 — SOLID WASTE COLLECTION AND DISPOSAL AND RECYCLING
  224. Chapter 8.30 — SMOKING
  225. Chapter 8.32 — TOBACCO PRODUCT DISTRIBUTION RESTRICTIONS
  226. Chapter 8.36 — SWIMMING POOLS
  227. Chapter 8.38 — SANITATION
  228. Chapter 8.40 — MISCELLANEOUS HEALTH AND SAFETY REGULATIONS
  229. Chapter 8.42 — CERTIFIED UNIFIED PROGRAM AGENCY (CUPA)
  230. Chapter 8.44 — SECURITY FOR EVENTS AT THE OAKLAND-ALAMEDA COUN…
  231. Chapter 8.46 — MEDICAL CANNABIS
  232. Chapter 8.48 — VEHICLE-BASED SOLICITATION RESTRICTIONS
  233. Chapter 8.50 — EMERGENCY SERVICES ORGANIZATION AND DISASTER CO…
  234. Chapter 8.52 — ACCESS TO REPRODUCTIVE HEALTH CARE FACILITIES
  235. Chapter 8.54 — FORECLOSED AND DEFAULTED RESIDENTIAL PROPERTY R…
  236. Article I — Intent
  237. Article III — Registration
  238. Article IV — Inspection, Maintenance, and Security Requirements
  239. Article V — Enforcement
  240. Article VI — Appeal
  241. Chapter 8.56 — EMERGENCY RESPONSE SERVICES FEES PROGRAM
  242. Article I — Title and Purpose
  243. Article III — Scope and Exclusions
  244. Article IV — Registration, Inspection, and Abatement
  245. Chapter 8.60 — PROHIBITION ON THE STORING AND HANDLING OF COAL…
  246. Article II — Miscellaneous
  247. Chapter 8.62 — REGULATIONS ESTABLISHING PERMIT REQUIREMENTS AN…
  248. Chapter 8.64 — PROHIBITION ON COMBUSTION ENGINE-POWERED LEAF B…
  249. Chapter 8.66 — COMMUNICATIONS SERVICE PROVIDER CHOICE ORDINANCE
  250. Chapter 8.68 — REQUIREMENT OF PROOF OF A COVID-19 VACCINATION …
  251. Chapter 8.70 — NUISANCE VESSELS ON OAKLAND WATERS
  252. Chapter 8.72 — ELEVATOR MAINTENANCE IN RESIDENTIAL BUILDINGS
  253. Chapter 9.04 — OFFENSES AGAINST PUBLIC OFFICERS AND GOVERNMENT
  254. Chapter 9.06 — SAFE WORK ZONE ORDINANCE
  255. Chapter 9.08 — OFFENSES AGAINST PUBLIC PEACE AND DECENCY
  256. Chapter 9.12 — OFFENSES BY OR AGAINST MINORS
  257. Chapter 9.16 — PROPERTY OFFENSES
  258. Chapter 9.20 — AMMUNITION SALES REGISTRATION
  259. Chapter 9.24 — GAMBLING
  260. Chapter 9.28 — NUDE DANCING
  261. Chapter 9.32 — TRESPASS UPON CERTAIN CLASSES OF PROPERTY
  262. Article I — Dangerous Weapons
  263. Article II — Firearms and Weapons Violence Prevention
  264. Article III — Prohibition on the Sale of Saturday Night Specia…
  265. Article V — Prohibition on the Sale of Compact Handguns
  266. Article VI — Tools of Violence and Vandalism at Demonstrations
  267. Article VII — Privately Manufactured Firearms, Unfinished Fram…
  268. Chapter 9.37 — UNSECURED FIREARMS AND AMMUNITION IN UNATTENDED…
  269. Chapter 9.38 — POSSESSION OF LARGE-CAPACITY MAGAZINES
  270. Chapter 9.39 — SAFE STORAGE OF FIREARMS IN A RESIDENCE
  271. Chapter 9.40 — DISCRIMINATION BASED ON AIDS
  272. Chapter 9.44 — DISCRIMINATION BASED ON SEXUAL ORIENTATION
  273. Chapter 9.45 — DISCRIMINATION BASED ON DIVERSE FAMILY AND RELA…
  274. Chapter 9.48 — HOUSING DISCRIMINATION ON THE BASIS OF CHILDREN
  275. Chapter 9.52 — SPECIAL EVENT PERMITS
  276. Chapter 9.56 — NUISANCE VEHICLES
  277. Article II — Procedures After Impoundment
  278. Article III — Miscellaneous
  279. Chapter 9.58 — LOITERING FOR THE PURPOSE OF ENGAGING IN ILLEGA…
  280. Chapter 9.60 — SLAVERY ERA DISCLOSURE
  281. Chapter 9.64 — REGULATIONS ON CITY'S ACQUISITION AND USE OF SU…
  282. Chapter 9.65 — REGULATIONS ON CITY'S ACQUISITION AND USE OF MI…
  283. Chapter 9.72 — CITY PARTICIPATION IN FEDERAL LAW ENFORCEMENT A…
  284. Chapter 10.04 — GENERAL PROVISIONS
  285. Article I — Traffic Administration
  286. Article II — Enforcement and Obedience to Traffic Regulations
  287. Article III — Penalties
  288. Chapter 10.12 — TRAFFIC CONTROL DEVICES
  289. Chapter 10.16 — MISCELLANEOUS TRAFFIC CONTROL REGULATIONS
  290. Chapter 10.17 — MOTORIZED SCOOTERS AND POCKET BIKES
  291. Chapter 10.18 — DOCKLESS VEHICLE SHARE PROGRAM
  292. Chapter 10.20 — SPEED LIMITS
  293. Chapter 10.24 — PEDESTRIANS
  294. Chapter 10.28 — STOPPING, STANDING AND PARKING GENERALLY
  295. Chapter 10.32 — STOPPING, STANDING AND PARKING IN SPECIFIC STR…
  296. Chapter 10.36 — PARKING METER ZONES
  297. Chapter 10.40 — STOPPING FOR LOADING AND UNLOADING ONLY
  298. Chapter 10.44 — RESIDENTIAL PERMIT PARKING PROGRAM
  299. Chapter 10.45 — INTERIM MIXED USE PERMIT PARKING PROGRAM FOR T…
  300. Chapter 10.48 — PARKING FINES
  301. Chapter 10.52 — COMMERCIAL VEHICLES AND VEHICLE SIZE AND WEIGH…
  302. Chapter 10.53 — EXTRALEGAL LOAD TRANSPORTATION PERMITS
  303. Chapter 10.56 — AIRPORT GROUND TRAFFIC REGULATIONS
  304. Chapter 10.57 — OAKLAND INTERNATIONAL AIRPORT 200-YARD MARINE …
  305. Chapter 10.60 — VISION OBSCUREMENT AT INTERSECTIONS
  306. Chapter 10.64 — ABANDONED, WRECKED, DISMANTLED OR INOPERATIVE …
  307. Chapter 10.68 — EMPLOYER-BASED TRIP REDUCTION PROGRAM
  308. Chapter 10.70 — SOUTHEAST OAKLAND AREA TRAFFIC IMPACT FEE
  309. Article II — Payment of Fees
  310. Article III — Credits and Reimbursements
  311. Article IV — Fee Protests, Appeals, and Adjustments
  312. Chapter 10.71 — FREE-FLOATING ZONE PERMIT PROGRAM FOR CAR SHAR…
  313. Chapter 10.72 — DEDICATED SPACE PERMIT PROGRAM FOR CAR SHARING…
  314. Chapter 10.74 — SIDESHOWS
  315. Chapter 12.02 — COMPLETE STREET DESIGN STANDARDS
  316. Chapter 12.04 — SIDEWALK, DRIVEWAY AND CURB CONSTRUCTION AND M…
  317. Chapter 12.08 — ENCROACHMENTS
  318. Chapter 12.12 — EXCAVATION
  319. Chapter 12.16 — IMPROVEMENTS GENERALLY
  320. Chapter 12.20 — IMPROVEMENTS BY PRIVATE CONTRACT
  321. Chapter 12.22 — PROPERTY OWNER RESPONSIBILITY AND LIABILITY FO…
  322. Chapter 12.24 — STREET AND SIDEWALK USE REGULATIONS
  323. Chapter 12.28 — RAILROAD TRACKS
  324. Chapter 12.32 — STREET TREES AND SHRUBS
  325. Chapter 12.36 — PROTECTED TREES
  326. Chapter 12.40 — HAZARDOUS TREES
  327. Article I — Assemblies
  328. Article II — Parades
  329. Chapter 12.50 — NEWSRACKS—CITY-WIDE CONTROLS
  330. Chapter 12.52 — SIDEWALK BENCHES
  331. Chapter 12.56 — SOUND AMPLIFICATION EQUIPMENT
  332. Chapter 12.60 — BICYCLES
  333. Chapter 12.61 — VULNERABLE ROAD AND SIDEWALK USER PROTECTION
  334. Article I — Generally
  335. Article II — Park Permits
  336. Chapter 13.02 — SEWER SYSTEM
  337. Chapter 13.04 — SEWER SYSTEM FUNDING
  338. Chapter 13.08 — BUILDING SEWERS
  339. Chapter 13.12 — UNDERGROUND UTILITY DISTRICTS DESIGNATED
  340. Chapter 13.14 — STORM DRAINAGE STANDARDS
  341. Article I — Title, Purpose and General Provisions
  342. Article II — Discharge Regulations and Requirements
  343. Article III — Inspection and Enforcement
  344. Article IV — Coordination with Other Programs
  345. Article V — Appeals and Fees
  346. Chapter 14.04 — OAKLAND SIGN CODE
  347. Chapter 15 — SIGNS ADJACENT TO FREEWAYS
  348. Chapter 16 — RESTRICTING THE PLACEMENT OF OUTDOOR ADVERTISEMEN…
  349. Chapter 15.04 — OAKLAND AMENDMENTS TO CALIFORNIA MODEL BUILDIN…
  350. Article I — General Administrative Amendments
  351. Part 1 — Administrative Amendments to the California Administr…
  352. Part 2 — Administrative Amendments to the California Building …
  353. Part 2.5 — Administrative Amendments to the California Residen…
  354. Part 3 — Administrative Amendments to the California Electrica…
  355. Article 110-35 — SAFETY
  356. Part 4 — Administrative Amendments to the California Mechanica…
  357. Part 5 — Administrative Amendments to the California Plumbing …
  358. Part 7 — Administrative Amendments to the California Wildland …
  359. Part 8 — Administrative Amendments to the California Historica…
  360. Part 10 — Administrative Amendments to the California Existing…
  361. Part 12 — Administrative Amendments to the California Referenc…
  362. Part 1 — Reserved
  363. Part 2 — California Building Code Non-Administrative Technical…
  364. Chapter 16B — PRIVATE DRIVEWAY ACCESS BRIDGES
  365. Chapter 18B — GRADING, EXCAVATIONS, AND FILLS
  366. Part 2.5 — California Residential Code Non-Administrative (Tec…
  367. Part 3 — California Electrical Code Non-Administrative (Techni…
  368. Part 4 — California Mechanical Code Non-Administrative (Techni…
  369. Part 5 — California Plumbing Code Non-Administrative (Technica…
  370. Part D — Disposal of Rainwater Drainage
  371. Part 7 — California Wildland-Urban Interface Code Non-Administ…
  372. Part 8 — California Historical Building Code Non-Administrativ…
  373. Part 10 — California Existing Building Code Non-Administrative…
  374. Part 12 — California Referenced Standards Code Non-Administrat…
  375. Chapter 15.06 — OAKLAND AMENDMENTS TO THE CALIFORNIA ENERGY AN…
  376. Part 6 — Administrative Amendments to the California Energy Code
  377. Part 11 — Administrative Amendments to the California Green Bu…
  378. Article III — Non-Administrative (Technical) Amendments
  379. Chapter 15.08 — OAKLAND BUILDING MAINTENANCE CODE
  380. Article I — Scope
  381. Article II — Enforcement
  382. Article III — Fees and Inspections
  383. Article IV — Definitions
  384. Article V — Habitable Space
  385. Article VI — Structural
  386. Article VII — Mechanical and Electrical
  387. Article VIII — Exiting
  388. Article IX — Fire Protection
  389. Article X — Substandard and Public Nuisance Buildings
  390. Article XI — Declaration of Public Nuisance—Substandard
  391. Article XII — Administrative Hearing
  392. Article XIII — Lead Hazard Control and Abatement
  393. Article XIV — Delay of Enforcement for Accessory Dwelling Units
  394. Article XV — Delay of Enforcement for Joint Live Work Quarters
  395. Chapter 15.10 — PUBLIC NOTICE OF CITY OF OAKLAND'S INTENT TO C…
  396. Chapter 15.12 — OAKLAND FIRE CODE
  397. Part 1 — GENERAL PROVISIONS
  398. Chapter 2 — DEFINITIONS
  399. Chapter 3 — GENERAL REQUIREMENTS
  400. Chapter 5 — FIRE SERVICE FEATURES
  401. Chapter 6 — BUILDING SERVICES AND SYSTEMS
  402. Chapter 9 — FIRE PROTECTION SYSTEMS
  403. Chapter 10 — MEANS OF EGRESS
  404. Chapter 11 — CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
  405. Chapter 12 — ENERGY SYSTEMS
  406. Chapter 28 — LUMBERYARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS AN…
  407. Chapter 33 — FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION
  408. Chapter 49 — REQUIREMENTS FOR WILDLAND-URBAN INTERFACE AREAS
  409. Chapter 50 — HAZARDOUS MATERIALS - GENERAL PROVISIONS
  410. Chapter 53 — COMPRESSED GASES
  411. Chapter 56 — EXPLOSIVES AND FIREWORKS
  412. Chapter 57 — FLAMMABLE AND COMBUSTIBLE LIQUIDS
  413. Chapter 58 — FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
  414. Chapter 60 — HIGHLY TOXIC AND TOXIC MATERIALS
  415. Chapter 80 — REFERENCED STANDARDS
  416. Chapter 15.16 — FIRE-DAMAGED AREA PROTECTION AND IMPROVEMENT R…
  417. Chapter 15.18 — FIRE SUPPRESSION, PREVENTION, AND PREPAREDNESS…
  418. Chapter 15.20 — GEOLOGIC REPORTS
  419. Chapter 15.24 — EARTHQUAKE-DAMAGED STRUCTURES
  420. Chapter 15.26 — MANDATORY SEISMIC SCREENING OF MULTIPLE STORY …
  421. Article II — Administrative
  422. Article III — Technical
  423. Chapter 15.27 — MANDATORY SEISMIC EVALUATION AND RETROFIT OF C…
  424. Article I — SCOPE
  425. Article II — COMPLIANCE
  426. Article III — ADMINISTRATIVE
  427. Article IV — TECHNICAL
  428. Chapter 15.28 — UNREINFORCED MASONRY BUILDINGS
  429. Chapter 15.30 — VOLUNTARY SEISMIC STRENGTHENING FOR RESIDENTIA…
  430. Article III — Non-Administrative
  431. Article IV — Financial Incentives
  432. Chapter 15.32 — DANGEROUS BUILDINGS AND STRUCTURES
  433. Article I — Title
  434. Article II — Administrative
  435. Article III — Solar Energy System Requirements
  436. Chapter 15.34 — CONSTRUCTION AND DEMOLITION DEBRIS COLLECTION,…
  437. Chapter 15.35 — GREEN BUILDING REQUIREMENTS FOR CITY BUILDING …
  438. Article I — Green Building Practices
  439. Article II — Civic Bay-Friendly Landscaping Requirements for A…
  440. Chapter 15.36 — DEMOLITION PERMITS
  441. Chapter 15.37 — ALL-ELECTRIC CONSTRUCTION IN NEWLY CONSTRUCTED…
  442. Chapter 15.40 — BUILDING NUMBERS
  443. Chapter 15.44 — MOVING BUILDINGS
  444. Chapter 15.48 — SETBACK LINES
  445. Chapter 15.52 — VIEWS
  446. Chapter 15.56 — HOUSEBOATS
  447. Chapter 15.60 — CODE COMPLIANCE RELOCATION PROGRAM
  448. Chapter 15.62 — AFFORDABLE HOUSING TRUST FUND
  449. Chapter 15.63 — OAKLAND RESIDENT/WORKER PREFERENCES AND REQUIR…
  450. Article I — Preferences in Multifamily Affordable Housing Proj…
  451. Article II — Requirements for First-Time Homebuyer Program
  452. Chapter 15.64 — BEDROOM WINDOW SECURITY BAR AND SMOKE DETECTOR…
  453. Chapter 15.68 — JOBS/HOUSING IMPACT FEE
  454. Chapter 15.72 — AFFORDABLE HOUSING IMPACT FEES
  455. Article II — Fee Requirements and Procedures
  456. Article III — On-Site and Off-Site Affordable Housing Options
  457. Article IV — Miscellaneous
  458. Chapter 15.74 — TRANSPORTATION AND CAPITAL IMPROVEMENTS IMPACT…
  459. Article III — Impact Fee Funds
  460. Article IV — Developer Constructed Facilities
  461. Article V — Miscellaneous
  462. Chapter 15.78 — PUBLIC ART REQUIREMENTS FOR PRIVATE DEVELOPMENT
  463. Chapter 16.04 — GENERAL PROVISIONS AND ADMINISTRATION
  464. Chapter 16.08 — TENTATIVE MAPS
  465. Chapter 16.12 — FINAL MAPS
  466. Chapter 16.16 — DESIGN STANDARDS
  467. Chapter 16.20 — IMPROVEMENTS
  468. Chapter 16.24 — PARCEL MAPS
  469. Chapter 16.28 — HILLSIDE SUBDIVISIONS
  470. Chapter 16.32 — PRIVATE ACCESS EASEMENTS
  471. Chapter 16.36 — CONDOMINIUM CONVERSIONS
  472. Title 17 — PLANNING
  473. Chapter 18.01 — WATER EFFICIENT LANDSCAPING ORDINANCE
  474. Chapter 18.02 — SUSTAINABLE GREEN BUILDING REQUIREMENTS FOR PR…
  475. Article I — Intent
  476. Article III — Green Building Compliance Standards
  477. Article IV — Entitlement Phase
  478. Article V — Construction Phase
  479. Chapter 18.04 — PROHIBITION OF THE CITY'S USE AND PURCHASE OF …
  480. Chapter 17.01 — GENERAL PROVISIONS OF PLANNING CODE AND GENERA…
  481. Chapter 17.03 — CITY PLANNING COMMISSION
  482. Chapter 17.05 — LANDMARKS PRESERVATION ADVISORY BOARD
  483. Chapter 17.07 — TITLE, PURPOSE AND SCOPE OF THE ZONING REGULAT…
  484. Chapter 17.09 — DEFINITIONS
  485. Chapter 17.10 — USE CLASSIFICATIONS
  486. Article I — General Classification Rules
  487. Part 1 — Residential Activity Types
  488. Part 2 — Civic Activity Types
  489. Part 3 — Commercial Activity Types
  490. Part 4 — Industrial Activity Types
  491. Part 5 — Agricultural and Extractive Activity Types
  492. Part 1 — Residential Facility Types
  493. Part 2 — Nonresidential Facility Types
  494. Part 3 — Sign Types
  495. Part 4 — Telecommunications Facility Types
  496. Chapter 17.11 — OS OPEN SPACE ZONING REGULATIONS
  497. Chapter 17.13 — RH HILLSIDE RESIDENTIAL ZONES REGULATIONS
  498. Chapter 17.15 — RD DETACHED UNIT RESIDENTIAL ZONE REGULATIONS
  499. Chapter 17.17 — RM MIXED HOUSING TYPE RESIDENTIAL ZONES REGULA…
  500. Chapter 17.19 — RU URBAN RESIDENTIAL ZONES REGULATIONS
  501. Chapter 17.33 — CN NEIGHBORHOOD CENTER COMMERCIAL ZONES REGULA…
  502. Chapter 17.35 — CC COMMUNITY COMMERCIAL ZONES REGULATIONS
  503. Chapter 17.37 — CR REGIONAL COMMERCIAL ZONE REGULATIONS
  504. Chapter 17.65 — HBX HOUSING AND BUSINESS MIX COMMERCIAL ZONES …
  505. Chapter 17.72 — M-40 INDUSTRIAL ZONES REGULATIONS
  506. Chapter 17.73 — CIX, IG AND IO INDUSTRIAL ZONES REGULATIONS
  507. Chapter 17.74 — S-1 MEDICAL CENTER COMMERCIAL ZONE REGULATIONS
  508. Chapter 17.78 — S-3 RESEARCH CENTER COMMERCIAL ZONE REGULATIONS
  509. Chapter 17.80 — S-4 DESIGN REVIEW COMBINING ZONE REGULATIONS
  510. Chapter 17.84 — S-7 PRESERVATION COMBINING ZONE REGULATIONS
  511. Chapter 17.88 — S-9 FIRE SAFETY PROTECTION COMBINING ZONE REGU…
  512. Chapter 17.90 — S-10 SCENIC ROUTE COMBINING ZONE REGULATIONS
  513. Chapter 17.92 — S-11 SITE DEVELOPMENT AND DESIGN REVIEW COMBIN…
  514. Chapter 17.94 — S-12 RESIDENTIAL PARKING COMBINING ZONE REGULA…
  515. Chapter 17.95 — S-13 AFFORDABLE HOUSING COMBINING ZONE REGULAT…
  516. Chapter 17.107 — Density Bonus and Incentive Procedure and Sta…
  517. Chapter 17.96 — S-14 HOUSING SITES COMBINING ZONE REGULATIONS
  518. Chapter 17.97 — S-15 TRANSIT-ORIENTED DEVELOPMENT COMMERCIAL Z…
  519. Chapter 17.98 — S-16 INTERSTATE CORRIDOR COMMERCIAL ZONES REGU…
  520. Chapter 17.99 — S-17 DOWNTOWN RESIDENTIAL OPEN SPACE COMBINING…
  521. Article I — Title, Intent and Applicability of the D-DT Zones
  522. Article II — Special Permit Requirements
  523. Article III — Use Requirements
  524. Article IV — Development and Design Standards
  525. Article V — D-DT Combining Zones
  526. Chapter 17.102 — REGULATIONS APPLICABLE TO CERTAIN ACTIVITIES …
  527. Article I — Residential Activities
  528. Article II — Civic Activities
  529. Article III — Commercial Activities
  530. Article IV — Industrial Activities
  531. Article V — Agricultural and Extractive Activities
  532. Article VI — Residential Facilities
  533. Article VIII — Nonresidential Facilities
  534. Article IX — Sign Facilities
  535. Article X — Telecommunications Facilities
  536. Chapter 17.104 — GENERAL LIMITATIONS ON SIGNS
  537. Chapter 17.106 — GENERAL LOT, DENSITY, AND AREA REGULATIONS
  538. Chapter 17.107 — DENSITY BONUS AND INCENTIVE PROCEDURE
  539. Chapter 17.108 — GENERAL HEIGHT, YARD, AND COURT REGULATIONS
  540. Chapter 17.110 — BUFFERING REGULATIONS
  541. Chapter 17.112 — HOME OCCUPATION REGULATIONS
  542. Chapter 17.114 — NONCONFORMING USES
  543. Article II — Nonconforming Activities
  544. Article III — Nonconforming Facilities
  545. Chapter 17.116 — OFF-STREET PARKING AND LOADING REQUIREMENTS
  546. Article II — Off-Street Parking Requirements
  547. Article III — Exemptions and Reductions in Required Parking
  548. Article IV — Off-Street Loading Requirements
  549. Article V — Standards for Required Parking and Loading Facilit…
  550. Chapter 17.117 — BICYCLE PARKING REQUIREMENTS
  551. Article II — Standards for Required Bicycle Parking
  552. Article III — Minimum Number of Required Bicycle Parking Spaces
  553. Chapter 17.118 — RECYCLING SPACE ALLOCATION REQUIREMENTS
  554. Chapter 17.120 — PERFORMANCE STANDARDS
  555. Chapter 17.122 — REPLACEMENT HOUSING UNIT REGULATIONS
  556. Chapter 17.124 — LANDSCAPING AND SCREENING STANDARDS
  557. Chapter 17.126 — USABLE OPEN SPACE STANDARDS
  558. Chapter 17.128 — TELECOMMUNICATIONS REGULATIONS
  559. Chapter 17.130 — ADMINISTRATIVE PROCEDURES GENERALLY
  560. Chapter 17.131 — REASONABLE ACCOMMODATIONS POLICY AND PROCEDURES
  561. Chapter 17.132 — ADMINISTRATIVE APPEAL PROCEDURE
  562. ▸Chapter 17.134 — CONDITIONAL USE PERMIT PROCEDURE
  563. Chapter 17.135 — SPECIAL USE PERMIT REVIEW PROCEDURE FOR THE O…
  564. Chapter 17.136 — DESIGN REVIEW PROCEDURE
  565. Chapter 17.138 — DEVELOPMENT AGREEMENT PROCEDURE
  566. Chapter 17.140 — PLANNED UNIT DEVELOPMENT PROCEDURE
  567. Chapter 17.142 — PLANNED UNIT DEVELOPMENT REGULATIONS
  568. Article I — Title, Purposes and Applicability
  569. Article II — Planned Unit Developments
  570. Chapter 17.144 — REZONING AND LAW CHANGE PROCEDURE
  571. Chapter 17.148 — VARIANCE AND EXCEPTION PROCEDURE
  572. Chapter 17.150 — FEE SCHEDULE
  573. Chapter 17.152 — ENFORCEMENT
  574. Chapter 17.153 — DEMOLITION, CONVERSION AND REHABILITATION REG…
  575. Chapter 17.154 — ZONING MAPS
  576. Chapter 17.155 — SPECIAL REGULATIONS APPLYING TO MINING AND QU…
  577. Chapter 17.156 — DEEMED APPROVED ALCOHOLIC BEVERAGE SALE REGUL…
  578. Article I — Title and Scope
  579. Article II — Definitions
  580. Article III — Deemed Approved Performance Standards
  581. Article IV — Deemed Approved Status Procedure
  582. Article V — Enforcement Procedure
  583. Chapter 17.157 — DEEMED APPROVED HOTEL AND ROOMING HOUSE REGUL…
  584. Chapter 17.158 — ENVIRONMENTAL REVIEW REGULATIONS
  585. Article 1.1 — Title and Scope
  586. Article 1.2 — Definitions and Abbreviations
  587. Article 1.3 — General Regulations
  588. Article 2.1 — General Provisions
  589. Article 2.2 — Exemption Process
  590. Article 2.3 — CEQA Environmental Review Process

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.