§ 29-10. (Reserved)
Oakdale Municipal Code · 2026-07 edition · updated 2026-09-27 · Oakdale
Reserved by Ordinance No. 1231-15.
§ 29-11. Reduction of pollutants in storm water. [Ord. No. 1153, § 29.11; Ord. No. 1231-15.]
Any person engaged in activities that may result in pollutants entering the storm water conveyance system shall, to the maximum extent practicable, undertake the measures set forth below to reduce the risk of nonstorm water discharge and/or pollutant discharge.
(a) Business-related activities.
(1) Storm Water Pollution Prevention Plan. The enforcement official may require any business in the City engaged in activities that may result in pollutant discharges to develop and implement a storm water pollution prevention plan, which shall include an employee training program. An employee training program is a documented employee training program that may be required to be implemented by a business pursuant to a storm water pollution prevention plan, for the purpose of educating its employees on methods of reducing discharge of pollutants to the storm water conveyance system. Business activities that may require a storm water pollution prevention plan include, but are not limited to, maintenance, storage, manufacturing, assembly, equipment operations, vehicle loading or fueling, or cleanup procedures carried out partially or wholly out of doors.
(2) Coordination with hazardous materials release response plans and inventory. Any business requiring a hazardous materials release response and inventory plan, under Chapter 6.95 (commencing with § 25500) of Division 20 of the Cal. Health & Safety Code, shall include in that plan provisions for compliance with this chapter, including the provisions prohibiting non-
Downloaded from https://ecode360.com/OA4108 on 2026-07-07
City of Oakdale, CA § 29-11
OAKDALE CITY CODE
§ 29-11
storm water discharges and illegal discharges, and requiring the release of pollutants to be reduced to the maximum extent practicable.
(3) Coordination with hazardous waste generator contingency plan and emergency procedures. Any business requiring a hazardous waste generator contingency plan and emergency procedures, pursuant to Cal. Code of Regulations, Title 22, §§ 66265.51 to 66265.56, shall include in that plan provisions for compliance with this chapter, including the provisions prohibiting non-storm water discharge and illegal discharges, and requiring the release of pollutants to be reduced to the maximum extent practicable.
(b) Construction.
(1) Any person performing construction activities in the City shall prevent pollutants from entering the storm water conveyance system and comply with all applicable Federal, State and local laws, ordinances or regulations, including but not limited to, the current California NPDES General Permit for storm water discharges associated with construction activity (Construction General Permit) and the City Storm water Management and Discharge Control Ordinance. All construction projects, regardless of size, having soil disturbance or activities exposed to storm water must, at a minimum, implement BMPs for erosion and sediment controls, soil stabilization, dewatering, source controls, pollution prevention measures, and prohibited discharges.
(2) Any person subject to a construction activity NPDES storm water discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the enforcement official prior to, or as a condition of, a subdivision map, site plan, building permit, grading permit, or development or improvement plan, upon inspection of the facility, during any enforcement proceeding or action, or for any other reasonable cause. Prior to issuance of a construction permit or approval of the proposed improvement plans, for projects subject to the State's current Construction NPDES General Permit, the WDID number and the SWPPP shall be submitted to the City. For projects with less than an acre of soil disturbance or not subject to the Construction General Permit, an Erosion and Sediment Control Plan (ESCP) and the ESCP Worksheet must be submitted to the City.
(3) As required by its Phase II MS4 NPDES Permit, the City will conduct storm water compliance inspections at applicable construction sites that have areas of soil disturbance exposed to storm water. The inspection will be conducted by a City inspector or agent working for the City who is a Qualified SWPPP Practitioner (QSP) or is supervised by a QSP. The inspection will evaluate the construction site's compliance to the City's storm water ordinances. Inspections will be billed by the City to the project owner. The following is the risk rating system and inspection frequency the City will use, which is analogous to the risk rating used by the California Construction General Permit.
Projects not subject to the CGP or that have an Erosivity Waiver will have a pre-soil disturbance inspection and a project completion inspection.
Projects that are Risk 1 / LUP Type 1 or Risk 2 / LUP Type 2 will have a pre-soil disturbance inspection, monthly inspections, and a project completion inspection.
Projects that are Risk 3 / LUP Type 3 will have a pre-soil disturbance inspection, bi-monthly (twice per month) inspections, and a project completion inspection.
If a project has been issued two consecutive notices of violation or does not correct a previously
Downloaded from https://ecode360.com/OA4108 on 2026-07-07
City of Oakdale, CA § 29-11
STORM WATER MANAGEMENT AND DISCHARGE
§ 29-11
issued notice of violation by the due date set by the inspector, the project's "threat to water quality" will be elevated by the City to the next highest category. This elevation of risk will not affect the risk rating for the Construction General Permit.
(c) Development.
(1) The enforcement official may develop controls as appropriate to minimize the long-term, postconstruction discharge of storm water, low impact development measures, and/or hydromodification measures to offset the difference between the pre and post-construction peak flow runoff rates and volumes. Proponents of all applicable development and redevelopment projects will be required to meet the requirements and design standards specified in the current State of California Phase II MS4 NPDES Permit and as described in further detail in the City's current Post-Construction Standards Plan.
(2) At the earliest planning stages, project proponents shall assess and evaluate how site conditions, such as soils, vegetation, and flow paths will influence the placement of buildings and paved surfaces. The evaluation will be used to optimize the site layout to meet the goals of capturing and treating runoff. Each project proponent will submit a map of the project dividing the site into discrete drainage management areas to show in each how runoff will be managed using site design measures, source controls, treatment controls, and hydromodification measures as defined by the current MS4 permit. All site design measures, source controls, treatment controls, and hydromodification measures must be selected, sized, and situated in accordance with the guidance provided in the current MS4 permit and the City's current Post-Construction Standards Plan. Documentation of the site's post-construction storm water design measures must be submitted to the City's Planning Department for review and approval prior to the commencement of the project.
(3) Project proponents must sign an operation and maintenance agreement in which they legally bind themselves to maintain the installed post-construction design measures in an effective and good operational condition until the property ownership is transferred. A written operation and maintenance plan for the proposed storm water design measures is required to be submitted to and approved by the City with the signed agreement. The agreement will be recorded with the deed by the County Clerk making it transferable to the new owner; or, when there are multiple property owners responsible for the maintenance of the control measures, the agreement will consist of a legally binding covenant between the City and the homeowners association or maintenance district. The owner or association responsible for the maintenance of the control measures may be required by the City to submit an annual self-certification that the storm water control measures are effective and are being maintained in accordance with the submitted and approved Operation and Maintenance Plan.
(4) Pollutants.
(d) Compliance with Industrial and Construction Activity Storm Water Permits.
(1) Any person subject to the State's current Industrial NPDES General Permit for storm water discharge shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the enforcement official upon inspection of the facility; during any enforcement proceeding or action; or for any other reasonable cause.
- (2) Any person subject to the State's current Construction NPDES General Permit for storm water discharge shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the enforcement official prior to or as a condition of a
Downloaded from https://ecode360.com/OA4108 on 2026-07-07
City of Oakdale, CA § 29-11
OAKDALE CITY CODE
§ 29-13
subdivision map, site plan, building permit, and development or improvement plan; upon inspection of the facility; during any enforcement proceeding or action; or for any other reasonable cause.
- (e) Compliance with Best Management Practices. Every person or entity, including the above-listed categories, undertaking any activity or use of premises that may cause or contribute to storm water pollution or contamination or illicit discharges shall comply with best management practice (BMPs) consistent with the California Storm Water Quality Association (CASQA) Best Management Practice Handbooks or equivalent guidelines.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Oakdale Municipal Code
- Chapter 1
- Chapter 2
- Chapter 3
- Article IV — Fees and Charges.
- Chapter 4
- Article I — In General
- Article II — Dogs
- Article III
- Article IV — Permissible Household Pets, Etc.
- Article V — Abatement of Vicious Dogs
- Chapter 6
- Chapter 7
- Article I — Administration — General
- Article XIII — System Development Charges
- Article I
- Article II
- Article III
- Article 300.21 — (a) is added to read as follows:
- Article IV
- Article V
- Article VI — California Energy Code [Ord. No. 1243-16; amended…
- Article VII
- Article VIII
- Article IX
- Article X
- Article XI
- Chapter 8 — Referenced Standards is amended as follows:
- Article XII — Small Residential Rooftop Solar Energy System Pe…
- Article XIII
- Article XIV — Electric Vehicle Charging Station Permitting Str…
- Chapter 8
- Chapter 9
- Chapter 10
- Chapter 11
- Article II — Transactions and use tax.[3 ]
- Article III — Transient Occupancy Tax.[5 ]
- Article IV — Documentary Stamp Tax.[6 ]
- Article V — Financial Plan
- Article VI — City Treasurer Investments
- Article VII — Cannabis Business Tax [Added 12-10-2018 by Ord. …
- Article VIII — Parking and Business Improvement Area [Adopted …
- Article X — Crane Crossing Specific Plan - Plan Area Fee Progr…
- Chapter 12
- Chapter 1 — ADMINISTRATION PERMITS
- Chapter 1 — ADMINISTRATION
- Chapter 5 — FIRE SERVICE FEATURES FIRE APPARATUS ROADS
- Chapter 5
- Chapter 5
- Chapter 5
- Chapter 6
- Chapter 6
- Chapter 11
- Chapter 24 — FLAMABLE FINISHES
- Chapter 35
- Chapter 41
- Chapter 50 — HAZARDOUS MATERIALS GENERAL PROVISIONS
- Chapter 55
- Chapter 56
- Chapter 57
- Chapter 61
- Chapter 13
- Chapter 14
- Article VI — Disposal of Pharmaceutical Controlled Substances
- Article I — Waitresses and Entertainers
- Article II — Smoking at Council Meetings
- Article III — Smoking Pollution Control
- Article V — Waste Containers.
- Article VI — Disposal of Pharmaceutical Controlled Substances
- Chapter 15
- Chapter 16
- Chapter 17
- Chapter 18
- Article II — Abandoned, Wrecked, etc., Vehicles
- Article III — Railroad Crossing Permits
- Article IV
- Article V — Paid Parking Zones and Parking Permits[1 ]
- Article VI — Privately Owned and Maintained Roads and Parking …
- Article VII — Police Towing Services
- Article VIII — Traffic Rules
- Article X — Turning Movements
- Article XI — One-Way Alleys
- Article XII — Right-of-Way
- Article XIII — Public Offenses
- Article XIV — General Penalty
- Chapter 18A
- Chapter 19
- Article I — Offenses – Miscellaneous
- Article II — Graffiti[3 ]
- Article III
- Article IV — Coasting Devices
- Article V — Administrative Citation Process
- Article VI — Administrative Remedies
- Article VII
- Article VIII — Oakdale Massage Establishment Regulations
- Article X
- Article XI
- Article XII
- Article XIII
- Article XIV — Squatter Camps
- Article XV
- Article XVI — Noise Control [Added 5-6-2019 by Ord. No. 1263]
- Chapter 20
- Article III — Parks
- Article IV — Special Events
- Article V — Senior Citizens Commission
- Article VI — Drug Free Zones
- Chapter 21
- Chapter 22
- Article II — Police Relief and Pension Fund
- Chapter 23
- Chapter 24
- Chapter 25 — PURCHASES
- Chapter 26
- Article II — Collection and Disposal
- Article IV — Defacing Public and Private Property
- Article V — Legislative Recycling Mandates
- Chapter 28
- Article I — General Provisions
- Article II — Fees and Charges
- Article III — Sewer Mains and Sewer Laterals
- Article IV — Industrial Users
- Article V — Industrial Users' Discharge Permits
- Article VI — Enforcement
- Chapter 30
- Article II
- Article III — Trenching
- Article IV — Numbering of Streets
- Article V — Maintenance Districts
- Chapter 31
- Article II — Definitions and Responsibilities
- Article IV — Tentative Subdivision Maps
- Article V — Final Subdivision Maps
- Article VII — Vesting Tentative Maps for Residential Subdivisi…
- Article VIII — Dedications. Reservations, and Development Fees
- Article XI — Reversions to Acreage
- Article XII
- Article XIII — Correction and Amendment of Maps.
- Article XIV — Enforcement.
- Chapter 31A
- Chapter 32
- Chapter 33
- Article II — Disposition of Surplus Property
- Article III — Purchase by City Employees of Unclaimed or Surpl…
- Chapter 34
- Chapter 35
- Article II — Mains, Laterals and Hydrants
- Article III — Fees and Charges
- Article VII — Backflow and Cross-Connection Control
- Chapter 36
- Part I — General Provisions.
- Part II — Specific Plan Preparation Process.
- Part I — General Provisions
- Chapter 37
- Article II
- Article III — Regulations for Cannabis Businesses
- Article IV — Appeals and Enforcement
- Chapter DL