Jurupa Valley Municipal Code Ch. 3.65 Consolidated Fees for Land Use and Related Functions
Jurupa Valley Municipal Code · 2026-10 edition · updated 2026-10-04 · Jurupa Valley
Cite as: Jurupa Valley Municipal Code Chapter 3.65 · Text as of 2026-10-04
Sec. 3.65.010. - Purpose and scope.¶
The purpose of this chapter is to provide for the consolidation of certain schedules of fees related to the land use matters as provided for in the separate ordinances, resolutions and rules of the city mentioned in this chapter. The meaning of any particular word or phrase appearing in this chapter shall be determined by reference to the ordinance, resolution, or rule to which it relates. Should any fee provided in this chapter be ruled invalid or unenforceable, such determination shall not affect the validity of all remaining fee provisions.
Sec. 3.65.020. - Deposit-based, actual-cost processing fees and appeal procedures.¶
A. Deposit-based, actual-cost fees.
(1) Certain project functions within this chapter are designated as requiring deposit-based fees and are identified as such with the legend "Deposit-based fee:" following the function title. When multiple fee charges are listed for a deposit-based fee function, the initial deposit shall equal the sum of the component charges. Whenever the initial deposit includes a comprehensive transportation plan ("CTP") fee, that fee shall not be placed in the deposit trust fund but shall be deposited immediately into the road deposits trust account.
(2) For deposit-based fee functions only, fees collected in excess of the actual cost of providing the specific service shall be refunded. Applications whose work require a cost to the designated department beyond the estimated fee collected as a deposit shall require an additional deposit. Work on any application will cease when the deposit is depleted and will resume when additional deposits are received.
(3) The city will make draws against deposited funds on biweekly intervals based on payroll accounting cycles and at the fully burdened hourly rates for each job classification required to provide a specified service. Hourly rates for services shall be established through the yearly budget process and adopted by the City Council as part of the city budget public hearings.
(4) Deposits for applications will be collected upon submittal of the application. Deposits will be monitored and, when eighty (80) percent depleted, an analysis of the project will be done to determine if the remaining portion of the deposit will cover expected project completion costs. If costs are expected to exceed the remaining deposit in an amount of five dollars ($5) or more, additional deposits will be required to be submitted to recover the estimated full cost for completion. Additional deposits will be determined on a case by case basis based on the estimated cost to complete the application.
(5) A full accounting of each application will be made within forty-five (45) days of decision of the application and provided to the applicant. Remaining deposits of five dollars ($5) or more will be refunded to the applicant.
(6) When it is mutually agreed to by the applicant and the department or agency to which a fee applies, any fee not designated a "Deposit-based fee" may be treated and accounted for as a deposit-based fee in the manner established in subsections (A)(1) through (4) of this section.
B. Appeal procedure.
(1) Within ten (10) calendar days of receipt of the full accounting of the application costs or request for additional deposits, the applicant may request a review of the matter by the Director of Development Services or the appropriate department head, or his/her designee, who shall along with the responsible staff representative, review the cost of processing the application. The Director of Development Services or other department head may, in his or her sole discretion, determine that the costs were or were not appropriate and may then reduce the costs charged. The Director of Development Services or department head shall, in writing, notify the appealing person of his or her decision within three (3) working days.
(2) Any responsible party aggrieved by the decision of the Director of Development Services or other department head may, within ten (10) calendar days after the date of mailing of the Director of Development Services' or department head's decision, file a written appeal of the decision with the Administrative Review Board. This appeal shall be filed with the Director of Development Services. The Administrative Review Board shall be composed of five (5) members appointed by the City Manager or designee. The Administrative Review Board will convene within ten (10) working days of the filing of the appeal.
(3) The Administrative Review Board will review the cost of processing the application, and shall consider all information relevant to the issue of costs that is provided, either orally or in written form, by the applicant and staff. The Administrative Review Board may determine that the costs were or were not appropriate and may then reduce the costs charged. The Administrative Review Board shall, in writing, notify the appealing person of its decision within three (3) working days from the conclusion of its review.
(4) Any responsible party aggrieved by the decision of the Administrative Review Board may, within ten (10) calendar days after the date of mailing of the Administrative Review board's decision, file a written appeal of the decision with the City Council. The appeal shall be on the form(s) provided by the City Clerk shall be accompanied by a filing fee of fifty dollars ($50) or in an amount established by resolution. Upon receipt of the completed appeal, with filing fees, the City Clerk shall set the matter for hearing before the board of supervisors not less than ten (10) nor more than thirty (30) days thereafter and shall give written notice of the hearing to the applicant and the Director of Development Services or other department head. The City Council shall render its decision within thirty (30) days following the close of the hearing of the appeal.
(5) Unless appealed, the decision of the Director of Development Services or other department head is final. If the decision of the Director of Development Services or department head is appealed, then the decision of the Administrative Review Board is final unless appealed. If the decision of the Administrative Review Board is appealed, then the decision of the City Council is final.
(6) Work on any application may continue during any appeal process provided there are sufficient funds on deposit.
Sec. 3.65.030. - Zoning fees.¶
The fees to be paid under Title 9 for the following shall be as follows or until modified by resolution by the City Council:
| A. | The following fees shall be paid to the Community Development Director, or the Flood Control District where specified, and deposited in the general fund, the fund of the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax fund, and the Regional Park and Open-Space District (hereinafter called "Parks District") fund: | The following fees shall be paid to the Community Development Director, or the Flood Control District where specified, and deposited in the general fund, the fund of the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax fund, and the Regional Park and Open-Space District (hereinafter called "Parks District") fund: | The following fees shall be paid to the Community Development Director, or the Flood Control District where specified, and deposited in the general fund, the fund of the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax fund, and the Regional Park and Open-Space District (hereinafter called "Parks District") fund: | The following fees shall be paid to the Community Development Director, or the Flood Control District where specified, and deposited in the general fund, the fund of the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax fund, and the Regional Park and Open-Space District (hereinafter called "Parks District") fund: | Fee Amount |
|---|---|---|---|---|---|
| (1) | Appeals to Planning Commission | Appeals to Planning Commission | Appeals to Planning Commission | Appeals to Planning Commission | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $910 | ||
| (ii) | Fire Department (if fire conditions appealed) | Fire Department (if fire conditions appealed) | $224 | ||
| (iii) | Public Works Department (if a road condition is appealed) | Public Works Department (if a road condition is appealed) | $565 | ||
| (iv) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $28 | ||
| (v) | Building and Safety (if building and safety condition is appealed) | Building and Safety (if building and safety condition is appealed) | $177 | ||
| (vi) | City Clerk | City Clerk | $26 | ||
| (b) | Flood Control (if a flood control condition is appealed) | Flood Control (if a flood control condition is appealed) | Flood Control (if a flood control condition is appealed) | $313 | |
| (2) | Change of Zone | Change of Zone | Change of Zone | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $2,274 | ||
| (ii) | Environmental Health | Environmental Health | $61 | ||
| (iii) | Fire Department | Fire Department | $351 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $297 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $257 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $235 | |
| (e) | Parks District | Parks District | Parks District | $102 | |
| (3) | Conditional Use Permit | Conditional Use Permit | Conditional Use Permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $6,124 | ||
| (ii) | Environmental Health | Environmental Health | $234 | ||
| (iii) | Fire Department | Fire Department | $601 | ||
| (iv) | Building and Safety | Building and Safety | $467 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $602 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $5 | ||
| (c) | Public Works Department | Public Works Department | Public Works Department | $1,002 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $325 | |
| (e) | Parks District | Parks District | Parks District | $102 | |
| (4) | Conditional Use Permit(Mobilehome Park) | Conditional Use Permit(Mobilehome Park) | Conditional Use Permit(Mobilehome Park) | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $4,094 | ||
| (ii) | Environmental health | Environmental health | $234 | ||
| (iii) | Fire Department | Fire Department | $601 | ||
| (iv) | Building and Safety | Building and Safety | $467 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $1,757 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $5 | ||
| (c) | Public Works Department | Public Works Department | Public Works Department | $959 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $2 | ||
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $302 | |
| (e) | Parks District | Parks District | Parks District | $102 | |
| (5) | (a) | General Fund | General Fund | General Fund | |
| (i) | Planning Department | Planning Department | $3,667 | ||
| (ii) | Environmental Health | Environmental Health | $234 | ||
| (iii) | Fire Department | Fire Department | $601 | ||
| (iv) | Building and Safety | Building and Safety | $467 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $602 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $5 | ||
| (c) | Public Works Department | Public Works Department | Public Works Department | $959 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $2 | ||
| (d) | Parks District | Parks District | Parks District | $102 | |
| (e) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $272 | |
| (6) | Extension of Time—Commercial WECS, and Variances | Extension of Time—Commercial WECS, and Variances | Extension of Time—Commercial WECS, and Variances | Extension of Time—Commercial WECS, and Variances | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $291 | ||
| (ii) | Environmental Health | Environmental Health | $63 | ||
| (iii) | Fire Department | Fire Department | $118 | ||
| (iv) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $22 | ||
| (7) | Extension of Time—Conditional Use Permits | Extension of Time—Conditional Use Permits | Extension of Time—Conditional Use Permits | Extension of Time—Conditional Use Permits | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $392 | ||
| (ii) | Environmental Health | Environmental Health | $63 | ||
| (iii) | Fire Department | Fire Department | 118 | ||
| (b) | Public Works —Comprehensive Transportation Plan | Public Works —Comprehensive Transportation Plan | Public Works —Comprehensive Transportation Plan | $30 | |
| (c) | Parks District | Parks District | Parks District | $82 | |
| (8) | Extension of Time—Public Use Permits | Extension of Time—Public Use Permits | Extension of Time—Public Use Permits | Extension of Time—Public Use Permits | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $342 | ||
| (ii) | Environmental Health | Environmental Health | $63 | ||
| (iii) | Fire Department | Fire Department | $118 | ||
| (b) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $27 | |
| (c) | Parks District | Parks District | Parks District | $82 | |
| (9) | General Plan Amendment Filed With a Specific Plan | General Plan Amendment Filed With a Specific Plan | General Plan Amendment Filed With a Specific Plan | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $5,438 | ||
| (ii) | Environmental Health | Environmental Health | $59 | ||
| (iii) | Fire Department | Fire Department | $406 | ||
| (iv) | Building and Safety | Building and Safety | $354 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $478 | |
| (c) | Parks District | Parks District | Parks District | $246 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $352 | |
| (10) | General Plan Amendment—Circulation Section | General Plan Amendment—Circulation Section | General Plan Amendment—Circulation Section | Deposit-based fee: | |
| (a) | Public Works Department | Public Works Department | Public Works Department | $5,449 | |
| plus per road segment | plus per road segment | plus per road segment | $250 | ||
| To a maximum of | To a maximum of | To a maximum of | $12,000 | ||
| (b) | General Fund—Planning Department | General Fund—Planning Department | General Fund—Planning Department | $2,518 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $193 | |
| (11) | Revised Permits which do not require a public hearing | Revised Permits which do not require a public hearing | Revised Permits which do not require a public hearing | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department—50% of current base fee of parent case | Planning Department—50% of current base fee of parent case | 50% | ||
| (ii) | Fire Department | Fire Department | $100 | ||
| (iii) | Building and Safety | Building and Safety | $299 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $202 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $23 | |
| (12) | Revised Permits which require a public hearing | Revised Permits which require a public hearing | Revised Permits which require a public hearing | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department—50% of current base fee of parent case | Planning Department—50% of current base fee of parent case | 50% | ||
| (ii) | Fire Department | Fire Department | $98 | ||
| (iii) | Building and Safety | Building and Safety | $299 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $297 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $50 | |
| (13) | Certificate of Zoning Compliance and Site Development Plan which require field inspection by land use division | Certificate of Zoning Compliance and Site Development Plan which require field inspection by land use division | Certificate of Zoning Compliance and Site Development Plan which require field inspection by land use division | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $601 | ||
| (ii) | Building and Safety | Building and Safety | $35 | ||
| (iii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $21 | ||
| (14) | Site development permit which is exempt from the California Environmental Quality Act (CEQA) but is required to be transmitted by the Riverside County Planning Department to other governmental agencies for review | Site development permit which is exempt from the California Environmental Quality Act (CEQA) but is required to be transmitted by the Riverside County Planning Department to other governmental agencies for review | Site development permit which is exempt from the California Environmental Quality Act (CEQA) but is required to be transmitted by the Riverside County Planning Department to other governmental agencies for review | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $1,500 | ||
| (ii) | Environmental Health | Environmental Health | $136 | ||
| (iii) | Fire Department | Fire Department | $860 | ||
| (iv) | Building and Safety | Building and Safety | $458 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $420 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $422 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $47 | |
| (e) | Parks District | Parks District | Parks District | $102 | |
| (15) | Site development permit which is exempt from the California Environmental Quality Act (CEQA) and is not reviewed by any governmental agencies other than the Riverside County Planning Department | Site development permit which is exempt from the California Environmental Quality Act (CEQA) and is not reviewed by any governmental agencies other than the Riverside County Planning Department | Site development permit which is exempt from the California Environmental Quality Act (CEQA) and is not reviewed by any governmental agencies other than the Riverside County Planning Department | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $198 | ||
| (b) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $15 | |
| (16) | Site development permit which is exempt from the California Environmental Quality Act (CEQA) | Site development permit which is exempt from the California Environmental Quality Act (CEQA) | Site development permit which is exempt from the California Environmental Quality Act (CEQA) | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $2,173 | ||
| (ii) | Environmental health | Environmental health | $136 | ||
| (iii) | Fire Department | Fire Department | $860 | ||
| (iv) | Building and safety | Building and safety | $458 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $420 | |
| (c) | Public Works Department(general) | Public Works Department(general) | Public Works Department(general) | $422 | |
| (d) | Public Works Department(plan check)—Greater of $500 or 6.5% of estimated cost of construction. | Public Works Department(plan check)—Greater of $500 or 6.5% of estimated cost of construction. | Public Works Department(plan check)—Greater of $500 or 6.5% of estimated cost of construction. | $500 | |
| (e) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $127 | |
| (f) | Parks District | Parks District | Parks District | $102 | |
| (17) | Public Use Permit | Public Use Permit | Public Use Permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $3,699 | ||
| (ii) | Environmental Health | Environmental Health | $236 | ||
| (iii) | Fire Department | Fire Department | $970 | ||
| (iv) | Building and Safety | Building and Safety | $865 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $509 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $762 | |
| (d) | Parks District | Parks District | Parks District | $164 | |
| (e) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $317 | |
| (18) | Second Unit Permit | Second Unit Permit | Second Unit Permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $1,369 | ||
| (ii) | Environmental Health | Environmental Health | $170 | ||
| (iii) | Fire Department | Fire Department | $350 | ||
| (iv) | Building and Safety | Building and Safety | $435 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $282 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $217 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $152 | |
| (e) | Planning Department—Second Unit Verification | Planning Department—Second Unit Verification | Planning Department—Second Unit Verification | $26 | |
| (19) | Setback Adjustment | Setback Adjustment | Setback Adjustment | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $92 | ||
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $21 | ||
| (iii) | Building and Safety | Building and Safety | $128 | ||
| (20) | Specific Plan of Land Use | Specific Plan of Land Use | Specific Plan of Land Use | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $11,000 | ||
| (ii) | Environmental Health | Environmental Health | $197 | ||
| (iii) | Fire Department | Fire Department | $677 | ||
| (iv) | Building and Safety | Building and Safety | $1,511 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $1,255 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $2,733 | |
| (d) | Parks District | Parks District | Parks District | $164 | |
| (e) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $790 | |
| (21) | Specific Plan Amendment | Specific Plan Amendment | Specific Plan Amendment | Deposit-based fee: | |
| 50% of new specific plan fee | |||||
| (22) | Specific Plan—Road Specific Plan | Specific Plan—Road Specific Plan | Specific Plan—Road Specific Plan | Deposit-based fee: | |
| (a) | Public Works Department | Public Works Department | Public Works Department | $5,243 | |
| (23) | Substantial Conformance for Permits under Section 9.240.440 (Applications for modifications to approved permits) | Substantial Conformance for Permits under Section 9.240.440 (Applications for modifications to approved permits) | Substantial Conformance for Permits under Section 9.240.440 (Applications for modifications to approved permits) | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | a. Planning Department—Circulated | a. Planning Department—Circulated | $720 | ||
| (b) | Planning Department—uncirculated | Planning Department—uncirculated | Planning Department—uncirculated | $360 | |
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $29 | ||
| (iii) | Building and Safety—Plan Review | Building and Safety—Plan Review | $250 | ||
| (iv) | Transportation | Transportation | $117 | ||
| (24) | Substantial Conformance for Specific Plans | Substantial Conformance for Specific Plans | Substantial Conformance for Specific Plans | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $1,560 | ||
| (ii) | Environmental Health | Environmental Health | $61 | ||
| (iii) | Fire Department | Fire Department | $207 | ||
| (iv) | Building and Safety | Building and Safety | $177 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $180 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $113 | |
| (d) | Parks District | Parks District | Parks District | $102 | |
| (25) | Temporary Use Permit Not To Exceed Six Months | Temporary Use Permit Not To Exceed Six Months | Temporary Use Permit Not To Exceed Six Months | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $1,609 | ||
| (ii) | Environmental Health | Environmental Health | $62 | ||
| (iii) | Fire Department | Fire Department | $146 | ||
| (iv) | Building and Safety | Building and Safety | $520 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $191 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $121 | |
| (26) | Variance filed simultaneously with an application for a Land Division, Conditional Use Permit, Commercial WECS Permit or Site development permit | Variance filed simultaneously with an application for a Land Division, Conditional Use Permit, Commercial WECS Permit or Site development permit | Variance filed simultaneously with an application for a Land Division, Conditional Use Permit, Commercial WECS Permit or Site development permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $716 | ||
| (ii) | Environmental Health | Environmental Health | $120 | ||
| (iii) | Fire Department | Fire Department | $329 | ||
| (iv) | Building and Safety | Building and Safety | $32 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $103 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $49 | |
| (27) | Variance Filed Alone | Variance Filed Alone | Variance Filed Alone | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $1,781 | ||
| (ii) | Environmental Health | Environmental Health | $120 | ||
| (iii) | Fire Department | Fire Department | $329 | ||
| (iv) | Building and Safety | Building and Safety | $218 | ||
| (b) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $126 | |
| (28) | Accessory WECS | Accessory WECS | Accessory WECS | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $677 | ||
| (ii) | Fire Department | Fire Department | $376 | ||
| (iii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $47 | ||
| (29) | Commercial WECS Permit | Commercial WECS Permit | Commercial WECS Permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $3,658 | ||
| (ii) | Environmental Health | Environmental Health | $56 | ||
| (iii) | Fire Department | Fire Department | $376 | ||
| (iv) | Building and Safety | Building and Safety | $138 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $879 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $260 | |
| (30) | WECS Noise Study | WECS Noise Study | WECS Noise Study | WECS Noise Study | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Environmental Health deposit | Environmental Health deposit | $500 | ||
| (31) | Large Family Day Care Home | Large Family Day Care Home | Large Family Day Care Home | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $244 | ||
| (ii) | Environmental Health | Environmental Health | $87 | ||
| (iii) | Fire Department | Fire Department | $266 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $165 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $884 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $37 | |
| (32) | Hazardous Waste Facility Siting Permit | Hazardous Waste Facility Siting Permit | Hazardous Waste Facility Siting Permit | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $12,816 | ||
| plus per gross acre fee | plus per gross acre fee | $40 | |||
| (ii) | Environmental Health | Environmental Health | $1,000 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $522 | |
| (c) | Public Works Department | Public Works Department | Public Works Department | $996 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $912 | |
| plus per gross acre fee | plus per gross acre fee | plus per gross acre fee | $3 | ||
| (e) | Fire | Fire | Fire | $205 | |
| (33) | Kennels and Catteries which are processed under Title 9 | Kennels and Catteries which are processed under Title 9 | Kennels and Catteries which are processed under Title 9 | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $367 | ||
| (ii) | Environmental Health | Environmental Health | $35 | ||
| (iii) | Public Works —comprehensive transportation plan | Public Works —comprehensive transportation plan | $28 | ||
| (iv) | Building and Safety | Building and Safety | $458 | ||
| (v) | Transportation | Transportation | $49 | ||
| (34) | Kennels and Catteries—Class 1 | Kennels and Catteries—Class 1 | Kennels and Catteries—Class 1 | ||
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Environmental Health | Environmental Health | $44 | ||
| (35) | Minor temporary outdoor event which is exempt from the California Environmental Quality Act (CEQA) | Minor temporary outdoor event which is exempt from the California Environmental Quality Act (CEQA) | Minor temporary outdoor event which is exempt from the California Environmental Quality Act (CEQA) | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $148 | ||
| (ii) | Environmental Health | Environmental Health | $64 | ||
| (iii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $9 | ||
| (iv) | Building and Safety | Building and Safety | $83 | ||
| (v) | Fire | Fire | $74 | ||
| (36) | Minor temporary outdoor event which is not exempt from the California Environmental Quality Act (CEQA) | Minor temporary outdoor event which is not exempt from the California Environmental Quality Act (CEQA) | Minor temporary outdoor event which is not exempt from the California Environmental Quality Act (CEQA) | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $513 | ||
| (ii) | Environmental Health | Environmental Health | $60 | ||
| (iii) | Building and Safety | Building and Safety | $83 | ||
| (iv) | Fire | Fire | $74 | ||
| (b) | Public Works Department | Public Works Department | Public Works Department | $88 | |
| (c) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $36 | |
| (37) | Regularly Scheduled event which is pre-existing and exempt from the California Environmental Quality Act (CEQA) | Regularly Scheduled event which is pre-existing and exempt from the California Environmental Quality Act (CEQA) | Regularly Scheduled event which is pre-existing and exempt from the California Environmental Quality Act (CEQA) | Regularly Scheduled event which is pre-existing and exempt from the California Environmental Quality Act (CEQA) | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $88 | ||
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $6 | ||
| (38) | Regularly scheduled event | Regularly scheduled event | Regularly scheduled event | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $944 | ||
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $73 | ||
| (iii) | Building and Safety | Building and Safety | $83 | ||
| (39) | Substantial Conformance for Commercial and Accessory WECS Permits | Substantial Conformance for Commercial and Accessory WECS Permits | Substantial Conformance for Commercial and Accessory WECS Permits | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $491 | ||
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $35 | ||
| (iii) | Building and Safety | Building and Safety | $42 | ||
| (40) | Ordinance No. 348 Consistency Determination | Ordinance No. 348 Consistency Determination | Ordinance No. 348 Consistency Determination | Ordinance No. 348 Consistency Determination | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $35 | ||
| (ii) | Public Works—Comprehensive Transportation Plan | Public Works—Comprehensive Transportation Plan | $2 | ||
| (41) | Verification of pre-existing nonconforming use | Verification of pre-existing nonconforming use | Verification of pre-existing nonconforming use | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $198 | ||
| (b) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $15 | |
| (42) | Extension of pre-existing nonconforming use | Extension of pre-existing nonconforming use | Extension of pre-existing nonconforming use | Deposit-based fee: | |
| (a) | General Fund | General Fund | General Fund | ||
| (i) | Planning Department | Planning Department | $6,124 | ||
| (ii) | Environmental Health | Environmental Health | $234 | ||
| (iii) | Fire Department | Fire Department | $601 | ||
| (iv) | Building and Safety | Building and Safety | $467 | ||
| (b) | Flood Control District | Flood Control District | Flood Control District | $602 | |
| plus per lot or site fee | plus per lot or site fee | plus per lot or site fee | $5 | ||
| (c) | Public Works Department | Public Works Department | Public Works Department | $1,002 | |
| (d) | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | Public Works Department—Comprehensive Transportation Plan | $325 | |
| (e) | Parks District | Parks District | Parks District | $102 | |
| (43) | Public Works Plan; check for any application under Title 9 which requires road work design or improvements not otherwise provided for under this chapter | Public Works Plan; check for any application under Title 9 which requires road work design or improvements not otherwise provided for under this chapter | Public Works Plan; check for any application under Title 9 which requires road work design or improvements not otherwise provided for under this chapter | Deposit-based fee: | |
| Greater of $500 or 6.5% of estimated cost of construction | Greater of $500 or 6.5% of estimated cost of construction | Greater of $500 or 6.5% of estimated cost of construction | Greater of $500 or 6.5% of estimated cost of construction | $500 | |
| (44) | Flood Control Plan; check for any application under Ordinance No. 348 which requires flood control design or improvements | Flood Control Plan; check for any application under Ordinance No. 348 which requires flood control design or improvements | Flood Control Plan; check for any application under Ordinance No. 348 which requires flood control design or improvements | Deposit-based fee: | |
| Lot or site fee | Lot or site fee | Lot or site fee | Lot or site fee | $500 | |
| plus 2% of the estimated cost of flood control and drainage facilities (as approved by the Chief Engineer) but not less than $300, payable at the Flood Control District. | plus 2% of the estimated cost of flood control and drainage facilities (as approved by the Chief Engineer) but not less than $300, payable at the Flood Control District. | plus 2% of the estimated cost of flood control and drainage facilities (as approved by the Chief Engineer) but not less than $300, payable at the Flood Control District. | plus 2% of the estimated cost of flood control and drainage facilities (as approved by the Chief Engineer) but not less than $300, payable at the Flood Control District. | $300 | |
| (B) | Whenever an application for a change of zone, permit or variance is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the City Council, refund fees paid, upon the written request of the applicant. If any portion of the application fees have been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of their fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency, or department for a refund of the fees paid to it, in accordance with the refund policy statement. | Whenever an application for a change of zone, permit or variance is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the City Council, refund fees paid, upon the written request of the applicant. If any portion of the application fees have been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of their fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency, or department for a refund of the fees paid to it, in accordance with the refund policy statement. | Whenever an application for a change of zone, permit or variance is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the City Council, refund fees paid, upon the written request of the applicant. If any portion of the application fees have been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of their fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency, or department for a refund of the fees paid to it, in accordance with the refund policy statement. | Whenever an application for a change of zone, permit or variance is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the City Council, refund fees paid, upon the written request of the applicant. If any portion of the application fees have been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of their fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency, or department for a refund of the fees paid to it, in accordance with the refund policy statement. | |
| (C) | The Planning Department shall retain a processing fee from the total amount to be refunded. | The Planning Department shall retain a processing fee from the total amount to be refunded. | The Planning Department shall retain a processing fee from the total amount to be refunded. | The Planning Department shall retain a processing fee from the total amount to be refunded. |
(Ord. No. 2021-09, § 4, 4-15-2021)
Sec. 3.65.040. - Hog ranch fees.¶
The fees to be paid under Chapter 6.50 for the following shall be as follows or until modified by resolution by the City Council:
| (1) | New Permit Application Fee | Deposit-based fee: | Fee Amount |
|---|---|---|---|
| (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $1,874 | |
| (ii) Public Works—Comprehensive Transportation Plan | (ii) Public Works—Comprehensive Transportation Plan | $140 | |
| (2) | Inspection Fee | Inspection Fee | |
| (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $18 | |
| $17 per 100 hogs with a minimum fee required regardless of the number of hogs allowable | $17 per 100 hogs with a minimum fee required regardless of the number of hogs allowable | $140 | |
| (ii) Public Works—Comprehensive Transportation Plan | (ii) Public Works—Comprehensive Transportation Plan | $1 | |
| $1 per 100 hogs with a minimum fee required regardless of the number of hogs allowable | $1 per 100 hogs with a minimum fee required regardless of the number of hogs allowable | $10 | |
| (3) | Late Fee | Late Fee | |
| (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | 25% | |
| 25% of the required inspection fee | 25% of the required inspection fee | ||
| (ii) Public Works—Comprehensive Transportation Plan | |||
| 2% of the required inspection fee | 2% of the required inspection fee | 2% | |
| (4) | Amendment of Permit (Change in the Number of Hogs at Permittee's Option Under Section 6.50.100 (A) | Amendment of Permit (Change in the Number of Hogs at Permittee's Option Under Section 6.50.100 (A) | |
| (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $34 | |
| (ii) Public Works—Comprehensive Transportation Plan | (ii) Public Works—Comprehensive Transportation Plan | $2 | |
| (5) | Amendment of Permit (Increase in maximum allowable number of hogs under Section 6.50.100 (B) | Amendment of Permit (Increase in maximum allowable number of hogs under Section 6.50.100 (B) | |
| (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $187 | |
| (ii) Public Works—Comprehensive Transportation Plan | (ii) Public Works—Comprehensive Transportation Plan | $15 |
Sec. 3.65.050. - Flood hazard area fees.¶
The fees to be paid under Chapter 8.15 shall be as follows or until modified by resolution by the City Council.
Sec. 3.65.060. - Subdivision fees.¶
The fees to paid pursuant to Title 7 for the following shall be as follows or until modified by resolution by the City Council:
| A. | Fees for the following shall be paid to the Public Works Director and deposited into the General Fund: | Fees for the following shall be paid to the Public Works Director and deposited into the General Fund: | Fees for the following shall be paid to the Public Works Director and deposited into the General Fund: | Fee Amount |
|---|---|---|---|---|
| (1) | Tract No. or Unit No. | Tract No. or Unit No. | Tract No. or Unit No. | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Survey (nonrefundable) | (i) Survey (nonrefundable) | $26 | ||
| B. | The following fees shall be paid to the Community Development Director and deposited into the general fund, the fund for the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax funds, and the Parks District fund: | The following fees shall be paid to the Community Development Director and deposited into the general fund, the fund for the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax funds, and the Parks District fund: | The following fees shall be paid to the Community Development Director and deposited into the general fund, the fund for the Flood Control District or agency that provides the flood hazard report, the appropriate road or gas tax funds, and the Parks District fund: | |
| (1) | Multifamily Residential Tracts | Multifamily Residential Tracts | Multifamily Residential Tracts | |
| (a) Tentative Statutory Condominium Subdivision Map Filing (Sewers) | (a) Tentative Statutory Condominium Subdivision Map Filing (Sewers) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $5,724 | ||
| plus per unit fee | plus per unit fee | $72 | ||
| plus per gross acre fee | plus per gross acre fee | $23 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $528 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $560 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per unit fee | plus per unit fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $360 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $407 | ||
| plus per unit fee | plus per unit fee | $5 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (b) Tentative Statutory Condominium Subdivision Map Filing (Subsurface Disposal) | (b) Tentative Statutory Condominium Subdivision Map Filing (Subsurface Disposal) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $5,724 | ||
| plus per unit fee | plus per unit fee | $72 | ||
| plus per gross acre fee | plus per gross acre fee | $23 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $424 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $414 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per unit fee | plus per unit fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $360 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $407 | ||
| plus per unit fee | plus per unit fee | $5 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (c) Revised Statutory Condominium Subdivision Map Filing (within two years of original approval) | (c) Revised Statutory Condominium Subdivision Map Filing (within two years of original approval) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $6,211 | ||
| plus per additional unit fee | plus per additional unit fee | $77 | ||
| plus per additional gross acre fee | plus per additional gross acre fee | $24 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $382 | ||
| c. Fire Department per each additional unit | c. Fire Department per each additional unit | $166 | ||
| d. Building and Safety | d. Building and Safety | $207 | ||
| (ii) Public Works Department | (ii) Public Works Department | $360 | ||
| (iii)Public Works Department—Comprehensive Transportation Plan | (iii)Public Works Department—Comprehensive Transportation Plan | $437 | ||
| plus per additional unit fee | plus per additional unit fee | $6 | ||
| plus per additional gross acre fee | plus per additional gross acre fee | $2 | ||
| (d) Revised Statutory Condominium Subdivision Map Filing (within two years of original approval) | (d) Revised Statutory Condominium Subdivision Map Filing (within two years of original approval) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $6,211 | ||
| plus per additional unit fee | plus per additional unit fee | $77 | ||
| plus per additional gross acre fee | plus per additional gross acre fee | $24 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $203 | ||
| c. Fire Department | c. Fire Department | $186 | ||
| d. Building and Safety | d. Building and Safety | $518 | ||
| (ii) Public Works Department | (ii) Public Works Department | $360 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $437 | ||
| plus per additional unit fee | plus per additional unit fee | $6 | ||
| plus per additional gross acre fee | plus per additional gross acre fee | $2 | ||
| (2) | Parcel Maps | Parcel Maps | Parcel Maps | |
| (a) Tentative Commercial or Industrial Parcel Map (Sewers) | (a) Tentative Commercial or Industrial Parcel Map (Sewers) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning | a. Planning | $3,648 | ||
| plus per lot | plus per lot | $22 | ||
| plus per gross acre | plus per gross acre | $22 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $528 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $767 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $990 | ||
| (iv) Parks district | (iv) Parks district | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $254 | ||
| plus per lot fee | plus per lot fee | $2 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (b) Commercial or Industrial Parcel Map (Subsurface Disposal) | (b) Commercial or Industrial Parcel Map (Subsurface Disposal) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $3,648 | ||
| plus per lot fee | plus per lot fee | $22 | ||
| plus per gross acre fee | plus per gross acre fee | $22 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $424 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $767 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $990 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $254 | ||
| plus per lot fee | plus per lot fee | $2 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (c) Tentative Residential Parcel Map with waiver of Final Map | (c) Tentative Residential Parcel Map with waiver of Final Map | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $1,601 | ||
| plus per lot fee | plus per lot fee | $95 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $389 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Survey | d. Survey | $271 | ||
| e. Building and Safety | e. Building and Safety | $630 | ||
| (ii) Flood Control District | (ii) Flood Control District | $878 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $919 | ||
| (iv) Parks district | (iv) Parks district | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $114 | ||
| plus per lot fee | plus per lot fee | $7 | ||
| (d) Tentative Residential Parcel Map without waiver of Final Map | (d) Tentative Residential Parcel Map without waiver of Final Map | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $1,439 | ||
| plus per lot fee | plus per lot fee | $103 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $675 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $630 | ||
| (ii) Flood Control District | (ii) Flood Control District | $878 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $919 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $103 | ||
| plus per lot fee | plus per lot fee | $7 | ||
| (e) Revised Parcel Map filing (Residential, Commercial, and Industrial Parcel Maps; within two years of original approval) | (e) Revised Parcel Map filing (Residential, Commercial, and Industrial Parcel Maps; within two years of original approval) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $423 | ||
| plus per additional lot fee | plus per additional lot fee | $93 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $146 | ||
| c. Fire Department | c. Fire Department | $166 | ||
| d. Building and Safety | d. Building and Safety | $323 | ||
| (ii) Public Works Department | (ii) Public Works Department | $292 | ||
| (ii) Parks District | (ii) Parks District | $123 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $30 | ||
| plus per each additional lot fee | plus per each additional lot fee | $7 | ||
| (f) Revised Parcel Map filing (Commercial and Industrial Parcel Maps; after two years of original approval) | (f) Revised Parcel Map filing (Commercial and Industrial Parcel Maps; after two years of original approval) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $414 | ||
| plus per additional lot fee | plus per additional lot fee | $49 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $146 | ||
| c. Fire Department | c. Fire Department | $177 | ||
| d. Building and Safety | d. Building and Safety | $346 | ||
| (ii) Public Works Department | (ii) Public Works Department | $383 | ||
| (iii) Parks District | (iii) Parks District | $123 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $30 | ||
| plus per each additional lot fee | plus per each additional lot fee | $4 | ||
| (g) Revised Residential Parcel Map filing (after two years of original approval) | (g) Revised Residential Parcel Map filing (after two years of original approval) | Deposit-based fee: | ||
| (i) General fund | (i) General fund | |||
| a. Planning Department | a. Planning Department | $498 | ||
| plus per additional lot fee | plus per additional lot fee | $111 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $146 | ||
| c. Fire Department | c. Fire Department | $118 | ||
| d. Building and Safety | d. Building and Safety | $281 | ||
| (ii) Public Works Department | (ii) Public Works Department | $383 | ||
| (iii) Parks District | (iii) Parks District | $210 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $35 | ||
| plus per each additional lot fee | plus per each additional lot fee | $8 | ||
| (3) | Single-Family Residential Tracts | Single-Family Residential Tracts | Single-Family Residential Tracts | |
| (a) Tentative Subdivision Map not in the R-2, R-4 or R-6 Zone (Sewers) | (a) Tentative Subdivision Map not in the R-2, R-4 or R-6 Zone (Sewers) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $3,258 | ||
| plus per lot fee | plus per lot fee | $91 | ||
| plus per gross acre fee | plus per gross acre fee | $22 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $528 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $968 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,763 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $244 | ||
| plus per lot fee | plus per lot fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (b) Tentative Subdivision Map in the R-2, R-4 or R-6 Zone | (b) Tentative Subdivision Map in the R-2, R-4 or R-6 Zone | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $6,052 | ||
| plus per lot fee | plus per lot fee | $100 | ||
| plus per gross acre fee | plus per gross acre fee | $23 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $528 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $968 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,763 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $426 | ||
| plus per lot fee | plus per lot fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (v) Parks District | (v) Parks District | $102 | ||
| (c) Tentative Subdivision Map not in the R-2, R-4 or R-6 Zone (Sub-surface Disposal) | (c) Tentative Subdivision Map not in the R-2, R-4 or R-6 Zone (Sub-surface Disposal) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $3,258 | ||
| plus per lot fee | plus per lot fee | $91 | ||
| plus per gross acre fee | plus per gross acre fee | $22 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $424 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| iv. Building and Safety | iv. Building and Safety | $968 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,763 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $244 | ||
| plus per lot fee | plus per lot fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (d) Revised Tentative Subdivision Map (within two years of original approval) | (d) Revised Tentative Subdivision Map (within two years of original approval) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | |||
| 1. In R-2 zone | 1. In R-2 zone | $5,731 | ||
| plus per each additional lot fee | plus per each additional lot fee | $76 | ||
| plus per each additional acre fee | plus per each additional acre fee | $28 | ||
| 2. Not in R-2 zone | 2. Not in R-2 zone | $3,301 | ||
| plus per each additional lot fee | plus per each additional lot fee | $69 | ||
| plus per each additional acre fee | plus per each additional acre fee | $21 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $203 | ||
| b. Fire Department | b. Fire Department | $166 | ||
| d. Building and Safety | d. Building and Safety | $311 | ||
| (ii) Public Works Department | (ii) Public Works Department | $383 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $239 | ||
| plus per each additional lot fee | plus per each additional lot fee | $5 | ||
| plus per each additional gross acre fee | plus per each additional gross acre fee | $2 | ||
| (iv) Parks District | (iv) Parks District | $102 | ||
| (e) Revised Subdivision Map (after two years of original approval) | (e) Revised Subdivision Map (after two years of original approval) | Deposit-based fee: | ||
| (i) General fund | (i) General fund | |||
| a. Planning Department | a. Planning Department | |||
| 1. In R-2 zone | 1. In R-2 zone | $5,731 | ||
| plus per each additional lot fee | plus per each additional lot fee | $76 | ||
| plus per each additional acre fee | plus per each additional acre fee | $28 | ||
| 2. Not in R-2 zone | 2. Not in R-2 zone | $3,301 | ||
| plus per each additional lot fee | plus per each additional lot fee | $69 | ||
| plus per each additional acre fee | plus per each additional acre fee | $21 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $203 | ||
| c. Fire Department | c. Fire Department | $186 | ||
| d. Building and Safety | d. Building and Safety | $311 | ||
| (ii) Public Works Department | (ii) Public Works Department | $383 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $239 | ||
| plus per each additional lot fee | plus per each additional lot fee | $5 | ||
| plus per each additional gross acre fee | plus per each additional gross acre fee | $2 | ||
| (iv) Parks District | (iv) Parks District | $102 | ||
| (4) | Vesting Tentative Map | Vesting Tentative Map | Vesting Tentative Map | |
| (a) Vesting Statutory Condominium Subdivision Map filing | (a) Vesting Statutory Condominium Subdivision Map filing | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $5,508 | ||
| plus per lot fee | plus per lot fee | $99 | ||
| plus per gross acre fee | plus per gross acre fee | $23 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $1,196 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $611 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot and plan check fee | plus per lot and plan check fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,267 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $426 | ||
| plus per unit fee | plus per unit fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (b) Vesting Tentative Parcel Map | (b) Vesting Tentative Parcel Map | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $5,833 | ||
| plus per lot fee | plus per lot fee | $97 | ||
| plus per gross acre fee | plus per gross acre fee | $23 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $1,196 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $611 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot and plan check fee | plus per lot and plan check fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,267 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $414 | ||
| plus per unit fee | plus per unit fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (c) Vesting Tentative Single-Family Residential Tract | (c) Vesting Tentative Single-Family Residential Tract | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $5,708 | ||
| plus per lot fee | plus per lot fee | $93 | ||
| plus per gross acre fee | plus per gross acre fee | $22 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Environmental Health | b. Environmental Health | $1,196 | ||
| c. Fire Department | c. Fire Department | $1,063 | ||
| d. Building and Safety | d. Building and Safety | $968 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot and plan check fee | plus per lot and plan check fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $1,763 | ||
| (iv) Parks District | (iv) Parks District | $164 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $401 | ||
| plus per unit fee | plus per unit fee | $7 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| C. | The following fees shall be paid to the Planning Department and deposited in the General Fund or appropriate Public Works Department or Flood Control District Fund: | The following fees shall be paid to the Planning Department and deposited in the General Fund or appropriate Public Works Department or Flood Control District Fund: | The following fees shall be paid to the Planning Department and deposited in the General Fund or appropriate Public Works Department or Flood Control District Fund: | |
| (1) | Appeals (Subdivision) | Appeals (Subdivision) | Appeals (Subdivision) | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $376 | ||
| (ii) Fire Department (if fire conditions appealed) | (ii) Fire Department (if fire conditions appealed) | $224 | ||
| (iii) Building and Safety | (iii) Building and Safety | $177 | ||
| (b) Public Works Department (if road conditions appealed) | (b) Public Works Department (if road conditions appealed) | (b) Public Works Department (if road conditions appealed) | $165 | |
| (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | $28 | |
| (2) | Appeals Extension of Time | Appeals Extension of Time | Appeals Extension of Time | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $110 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $7 | ||
| (3) | Certificate of Land Division Compliance (fee per parcel) | Certificate of Land Division Compliance (fee per parcel) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $154 | ||
| (ii) Environmental Health | (ii) Environmental Health | $57 | ||
| (iii) Fire Department | (iii) Fire Department | $109 | ||
| (iv) Survey | (iv) Survey | $49 | ||
| (v) Public Works Department—Comprehensive Transportation Plan | (v) Public Works Department—Comprehensive Transportation Plan | $30 | ||
| (vi) Building and Safety | (vi) Building and Safety | $117 | ||
| (b) Flood Control | (b) Flood Control | (b) Flood Control | $261 | |
| (4) | Unconditioned Certificate of Land Division Compliance (fee per parcel) | Unconditioned Certificate of Land Division Compliance (fee per parcel) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $90 | ||
| (ii) Survey | (ii) Survey | $74 | ||
| (5) | Certificate of Land Division Compliance With Waiver of Final Parcel Map (fee per parcel) | Certificate of Land Division Compliance With Waiver of Final Parcel Map (fee per parcel) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department plus recordation fees | (i) Planning Department plus recordation fees | $122 | ||
| (ii) Fire Department | (ii) Fire Department | $109 | ||
| (iii) Survey | (iii) Survey | $71 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (6) | Extension of Time (Subdivision) | Extension of Time (Subdivision) | Extension of Time (Subdivision) | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $228 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $22 | ||
| (b) Parks District | (b) Parks District | (b) Parks District | $82 | |
| (7) | Extension of Time (Parcel Map) | Extension of Time (Parcel Map) | Extension of Time (Parcel Map) | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $228 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $23 | ||
| (b) Parks District | (b) Parks District | (b) Parks District | $82 | |
| (8) | Land Division Unit Map filing (tracts and parcels) | Land Division Unit Map filing (tracts and parcels) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $122 | ||
| (ii) Fire Department | (ii) Fire Department | $109 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $16 | ||
| (iv) Environmental Health | (iv) Environmental Health | |||
| a. Sewered subdivisions, or | a. Sewered subdivisions, or | $57 | ||
| b. Subsurface sewage subdivisions | b. Subsurface sewage subdivisions | $138 | ||
| (9) | Lot Line Adjustment | Lot Line Adjustment | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $123 | ||
| (ii) Environmental Health | (ii) Environmental Health | $72 | ||
| (iii) Survey | (iii) Survey | $125 | ||
| (iv) Building and Safety | (iv) Building and Safety | $94 | ||
| (b) Flood Control District | (b) Flood Control District | (b) Flood Control District | $189 | |
| (c) Public Works Department | (c) Public Works Department | (c) Public Works Department | $31 | |
| (d) Public Works Department—Comprehensive Transportation Plan | (d) Public Works Department—Comprehensive Transportation Plan | (d) Public Works Department—Comprehensive Transportation Plan | $36 | |
| (10) | Minor Change (Subdivision) | Minor Change (Subdivision) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $567 | ||
| (ii) Fire Department | (ii) Fire Department | $109 | ||
| (iii) Building and Safety | (iii) Building and Safety | $104 | ||
| (b) Public Works Department | (b) Public Works Department | (b) Public Works Department | $161 | |
| (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | $41 | |
| (d) Parks District | (d) Parks District | (d) Parks District | $102 | |
| (11) | Minor Change (Parcel Map) | Minor Change (Parcel Map) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $531 | ||
| (ii) Fire Department | (ii) Fire Department | $109 | ||
| (iii) Building and Safety | (iii) Building and Safety | $104 | ||
| (b) Public Works Department | (b) Public Works Department | (b) Public Works Department | $161 | |
| (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | $39 | |
| (d) Parks District | (d) Parks District | (d) Parks District | $102 | |
| 912) | Merger of Contiguous Parcels | Merger of Contiguous Parcels | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $96 | ||
| (ii) Survey | (ii) Survey | $123 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $43 | ||
| (13) | Reversion to Acreage | Reversion to Acreage | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $475 | ||
| (ii) Environmental Health | (ii) Environmental Health | $72 | ||
| (iii) Fire Department | (iii) Fire Department | $109 | ||
| (b) Public Works Department | (b) Public Works Department | (b) Public Works Department | $287 | |
| (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | $34 | |
| (14) | Amendment of Final Map | Amendment of Final Map | Amendment of Final Map | |
| (a) Statutory Condominium Subdivisions and Single-Family Residential Tracts | (a) Statutory Condominium Subdivisions and Single-Family Residential Tracts | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $1,941 | ||
| plus per lot change fee | plus per lot change fee | $20 | ||
| plus per gross acre and recordation fee | plus per gross acre and recordation fee | $11 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Survey | b. Survey | $1,169 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $146 | ||
| plus per lot change fee | plus per lot change fee | $1 | ||
| plus per gross acre fee | plus per gross acre fee | $1 | ||
| d. Building and Safety | d. Building and Safety | $281 | ||
| (b) Parcel Maps | (b) Parcel Maps | (b) Parcel Maps | ||
| (i) General Fund | Deposit-based fee: | |||
| a. Planning Department | a. Planning Department | $1,845 | ||
| plus per lot fee | plus per lot fee | $18 | ||
| plus per gross acre and recordation fee | plus per gross acre and recordation fee | $10 | ||
| The initial deposit of the combined Planning Department fees shall be 75 percent of the computed amount. | ||||
| b. Survey | b. Survey | $1,169 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $136 | ||
| plus per lot change fee | plus per lot change fee | $1 | ||
| plus per gross acre fee | plus per gross acre fee | $1 | ||
| iv. Building and Safety | iv. Building and Safety | $193 | ||
| D. | The following fees shall be paid to the Director of Transportation and deposited into the General Fund, the Gas Tax Fund and the appropriate flood control fund or district fund for the district conducting the final map checking: | The following fees shall be paid to the Director of Transportation and deposited into the General Fund, the Gas Tax Fund and the appropriate flood control fund or district fund for the district conducting the final map checking: | The following fees shall be paid to the Director of Transportation and deposited into the General Fund, the Gas Tax Fund and the appropriate flood control fund or district fund for the district conducting the final map checking: | |
| (1) | Certificate of Correction (no street name checking) | Certificate of Correction (no street name checking) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Survey plus recordation fee | (i) Survey plus recordation fee | $277 | ||
| (2) | Certificate of Correction (with street name checking) | Certificate of Correction (with street name checking) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Survey plus recordation fee | (i) Survey plus recordation fee | $354 | ||
| (3) | Street Acceptance for Unnamed Easements (nonmaintained) | Street Acceptance for Unnamed Easements (nonmaintained) | Deposit-based fee: | |
| (a) Survey | (a) Survey | (a) Survey | $385 | |
| (4) | Requests for extension of time to complete off-site improvements | Requests for extension of time to complete off-site improvements | Requests for extension of time to complete off-site improvements | |
| (a) Survey | (a) Survey | (a) Survey | $215 | |
| (5) | Requests for One-Year Maintenance Agreement | Requests for One-Year Maintenance Agreement | Requests for One-Year Maintenance Agreement | |
| (a) Survey | (a) Survey | (a) Survey | $216 | |
| (6) | Final Statutory Condominium Subdivision Map Filing | Final Statutory Condominium Subdivision Map Filing | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $112 | ||
| plus per gross acre fee | plus per gross acre fee | $1 | ||
| (ii) Survey | (ii) Survey | $1,543 | ||
| plus per acre fee ($4,500 maximum) | plus per acre fee ($4,500 maximum) | $50 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (7) | Final Parcel Map Filing | Final Parcel Map Filing | Deposit-based fee: | |
| (a) Schedule "E" | (a) Schedule "E" | (a) Schedule "E" | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $166 | ||
| plus per lot fee | plus per lot fee | $1 | ||
| b. Survey | b. Survey | $3,057 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (b) Schedules "F" through "H" | (b) Schedules "F" through "H" | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $114 | ||
| plus per lot | plus per lot | $1 | ||
| b. Survey | b. Survey | $2,087 | ||
| plus per lot fee | plus per lot fee | $20 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $4 | ||
| (c) Schedule "I" | (c) Schedule "I" | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $114 | ||
| plus per parcel fee | plus per parcel fee | $1 | ||
| b. Survey | b. Survey | $3,579 | ||
| plus per lot fee | plus per lot fee | $20 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $4 | ||
| (d) Reversion to Acreage (All Schedules) | (d) Reversion to Acreage (All Schedules) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey per map | a. Survey per map | $789 | ||
| (e) Street Name Approval After Prior Approval (All Schedules) | ||||
| (i) General Fund | (i) General Fund | |||
| a. Survey for four streets or less | a. Survey for four streets or less | $80 | ||
| plus fee for each additional street | plus fee for each additional street | $10 | ||
| (8) | Final Subdivision Map Filing | Final Subdivision Map Filing | Final Subdivision Map Filing | |
| (a) Schedules "A"—"D" | (a) Schedules "A"—"D" | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $166 | ||
| plus per lot fee | plus per lot fee | $1 | ||
| b. Survey | b. Survey | $3,057 | ||
| plus per lot fee | plus per lot fee | $10 | ||
| c. Public Works Department—Comprehensive Transportation Plan | c. Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (b) Reversion to Acreage (all schedules) | (b) Reversion to Acreage (all schedules) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey per map | a. Survey per map | $789 | ||
| (c) Street Name Approval After Prior Approval (All Schedules) | (c) Street Name Approval After Prior Approval (All Schedules) | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey for four streets or less | a. Survey for four streets or less | $80 | ||
| plus fee for each additional street | plus fee for each additional street | $10 | ||
| (9) | Plan Checking, payable to the Public Works Department and Flood Control as follows: | Plan Checking, payable to the Public Works Department and Flood Control as follows: | Plan Checking, payable to the Public Works Department and Flood Control as follows: | |
| (a) At the time of filing of Improvement Plans for checking | ||||
| (i) Public Works Department: for Schedule A through D tract maps, and statutory condominiums, the fee shall be whichever is greater. | Deposit-based fee: | $1,875 | ||
| or 2 percent of the estimated street construction cost; | or 2 percent of the estimated street construction cost; | 2% | ||
| plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | 1% | ||
| (ii) For Schedule E through G parcel maps the fee shall be whichever is greater. | Deposit-based fee: | $1,875 | ||
| or 6 percent of the estimate street construction cost; | or 6 percent of the estimate street construction cost; | 6% | ||
| plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | 1% | ||
| (iii) Schedule H and I tracts or parcel maps, the fee shall be whichever is greater. | Deposit-based fee: | $800 | ||
| or 6 percent of the estimated street construction cost; | or 6 percent of the estimated street construction cost; | 6% | ||
| plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | plus 1 percent of water and sewer utility construction cost (as approved by the director of transportation). | 1% | ||
| (iv) Flood Control District: | Deposit-based fee: | |||
| Lot or site fee | Lot or site fee | $50 | ||
| plus 2% of the estimated cost of the flood control and drainage facilities (as approved by the chief engineer) but not less than $300, payable at the flood control district. ($5,000 maximum deposit.) | plus 2% of the estimated cost of the flood control and drainage facilities (as approved by the chief engineer) but not less than $300, payable at the flood control district. ($5,000 maximum deposit.) | 2% | ||
| (b) At the time of filing of Improvement Plans for signature | (b) At the time of filing of Improvement Plans for signature | Deposit-based fee: | ||
| (i) Public Works Department: | (i) Public Works Department: | |||
| 2% of any estimated street construction cost plus 1% of any estimated water and sewer utility construction costs added during plan check (as approved by the director of transportation). | 2% of any estimated street construction cost plus 1% of any estimated water and sewer utility construction costs added during plan check (as approved by the director of transportation). | 2% | ||
| (ii) Flood Control District: | (ii) Flood Control District: | |||
| 2% of the estimated flood control and drainage construction cost (as approved by the chief engineer) added during the plan check process, payable at the flood control district. | 2% of the estimated flood control and drainage construction cost (as approved by the chief engineer) added during the plan check process, payable at the flood control district. | 2% | ||
| (10) | Field Inspection, payable to the Public Works Department prior to recordation and payable to Flood Control District prior to construction. | Field Inspection, payable to the Public Works Department prior to recordation and payable to Flood Control District prior to construction. | Field Inspection, payable to the Public Works Department prior to recordation and payable to Flood Control District prior to construction. | |
| (a) Field Inspection Fee | (a) Field Inspection Fee | Deposit-based fee: | ||
| (i) Public Works Department, 3% of road and public facility improvements | (i) Public Works Department, 3% of road and public facility improvements | 3% | ||
| (ii) Flood Control District: | (ii) Flood Control District: | |||
| i. Inspection—Original Construction Period. For inspection service rendered during the specified construction period (determined by the chief engineer), the inspection fee shall be 3% of the bonded value of maintained flood control facilities. | i. Inspection—Original Construction Period. For inspection service rendered during the specified construction period (determined by the chief engineer), the inspection fee shall be 3% of the bonded value of maintained flood control facilities. | 3% | ||
| ii. Inspection—Time Extensions. | ii. Inspection—Time Extensions. | |||
| If work is complete after the expiration of the specified construction period, a fee of 1% of the bonded value of maintained flood control facilities will be imposed for a three-month time extension and each multiple thereof. A portion of the fee may be refunded on a prorate time based upon the portion of the three-month extension that was unused. | If work is complete after the expiration of the specified construction period, a fee of 1% of the bonded value of maintained flood control facilities will be imposed for a three-month time extension and each multiple thereof. A portion of the fee may be refunded on a prorate time based upon the portion of the three-month extension that was unused. | 1% | ||
| (11) | Survey Monument Field Inspection | Survey Monument Field Inspection | Survey Monument Field Inspection | |
| (a) Schedule A-E | (a) Schedule A-E | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey | a. Survey | $657 | ||
| plus per gross acre fee | plus per gross acre fee | $2 | ||
| (b) Schedule F-H | (b) Schedule F-H | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey | a. Survey | $718 | ||
| plus per parcel fee | plus per parcel fee | $20 | ||
| (c) Schedule I | (c) Schedule I | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Survey | a. Survey | $1,380 | ||
| plus per gross acre fee over 400 acres ($3,000 maximum deposit) | plus per gross acre fee over 400 acres ($3,000 maximum deposit) | $0.50 | ||
| (12) | (a) Flood control special studies: | (a) Flood control special studies: | Deposit-based fee: | |
| If special hydrologic/ |
If special hydrologic/ |
If special hydrologic/ |
$750 | |
| (b) Flood control special studies: | (b) Flood control special studies: | Deposit-based fee: | ||
| If special hydrologic/ |
If special hydrologic/ |
If special hydrologic/ |
$3,000 | |
| (c) hg; Federal Emergency Management Agency (FEMA) studies: | ||||
| (i) Conditional letter of map revision (CLOMR) processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | (i) Conditional letter of map revision (CLOMR) processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | $5,000 | ||
| Deposit-based fee: | ||||
| (ii) CLOMR to LOMR (letter of map revision) conversion fee shall be paid at the Flood Control District prior to recordation. | (ii) CLOMR to LOMR (letter of map revision) conversion fee shall be paid at the Flood Control District prior to recordation. | $2,582 | ||
| (13) | Center Line Profile Plan Check | Center Line Profile Plan Check | Deposit-based fee: | |
| (a) Transportation | (a) Transportation | (a) Transportation | $800 | |
| E. | Filing Fees for Expired Recordable Final Subdivisions and Schedule "E" Parcel Maps | Filing Fees for Expired Recordable Final Subdivisions and Schedule "E" Parcel Maps | Filing Fees for Expired Recordable Final Subdivisions and Schedule "E" Parcel Maps | |
| (1) | If a tentative tract map is submitted to the Community Development Director within 90 days of the expiration date of an expired recordable subdivision map on the same property and the new tentative tract map is no different than the lines of the expired map, the land divider shall pay the filing fees specified in this subsection. | If a tentative tract map is submitted to the Community Development Director within 90 days of the expiration date of an expired recordable subdivision map on the same property and the new tentative tract map is no different than the lines of the expired map, the land divider shall pay the filing fees specified in this subsection. | If a tentative tract map is submitted to the Community Development Director within 90 days of the expiration date of an expired recordable subdivision map on the same property and the new tentative tract map is no different than the lines of the expired map, the land divider shall pay the filing fees specified in this subsection. | |
| (a) In lieu of the filing fees provided for single-family residential tracts in Subsection (B)(3)(a), (b), and (c) of this section the following fees shall be paid: | (a) In lieu of the filing fees provided for single-family residential tracts in Subsection (B)(3)(a), (b), and (c) of this section the following fees shall be paid: | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| i. Planning Department | i. Planning Department | $1,853 | ||
| plus per lot fee | plus per lot fee | $17 | ||
| plus per gross acre fee | plus per gross acre fee | $17 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| (iii)Public Works Department | (iii)Public Works Department | $158 | ||
| (iv)Public Works Department—Comprehensive Transportation Plan | (iv)Public Works Department—Comprehensive Transportation Plan | $143 | ||
| plus per lot fee | plus per lot fee | $1 | ||
| plus per gross acre fee | plus per gross acre fee | $1 | ||
| (b) In lieu of the filing fees provided for multifamily residential tracts in Subsection (B)(1)(a) and (b) of this section, the following fees shall be paid: | (b) In lieu of the filing fees provided for multifamily residential tracts in Subsection (B)(1)(a) and (b) of this section, the following fees shall be paid: | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Planning Department | a. Planning Department | $2,023 | ||
| plus per gross acre fee | plus per gross acre fee | $18 | ||
| (ii) Flood Control District | (ii) Flood Control District | $1,757 | ||
| plus per unit fee | plus per unit fee | $5 | ||
| (iii) Public Works Department | (iii) Public Works Department | $158 | ||
| (iv) Public Works Department—Comprehensive Transportation Plan | (iv) Public Works Department—Comprehensive Transportation Plan | $156 | ||
| plus per gross acre fee | plus per gross acre fee | $1 | ||
| (c) In lieu of the filing fees provided for in paragraphs 4 and 6 of subsection (D) of this section, the following fees shall be paid: | ||||
| (i) Final subdivision map filing | Deposit-based fee: | |||
| a. General Fund | a. General Fund | |||
| 1. Planning Department | 1. Planning Department | $114 | ||
| plus per lot fee | plus per lot fee | $1 | ||
| 2. Survey | 2. Survey | $1,529 | ||
| plus per lot fee | plus per lot fee | $5 | ||
| 3. Public Works Department—Comprehensive Transportation Plan | 3. Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (ii) Final statutory condominium map | Deposit-based fee: | |||
| a. General Fund | a. General Fund | |||
| 1. Planning Department | 1. Planning Department | $114 | ||
| plus per lot fee | plus per lot fee | $1 | ||
| 2. Survey | 2. Survey | $772 | ||
| plus per gross acre fee ($2,250 maximum) | plus per gross acre fee ($2,250 maximum) | $25 | ||
| 3. Public Works Department—Comprehensive Transportation Plan | 3. Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (2) | For the purposes of this subsection, an expired recordable final map or Schedule "E" parcel map shall mean an approved tentative tract map or parcel map for which approved improvement plans had been submitted to the County Surveyor, the final or parcel map was ready for signature, and the map could have been recorded on the submission of approved security and agreements. The determination of whether any map constitutes an expired recordable map shall be made by the County Surveyor. | For the purposes of this subsection, an expired recordable final map or Schedule "E" parcel map shall mean an approved tentative tract map or parcel map for which approved improvement plans had been submitted to the County Surveyor, the final or parcel map was ready for signature, and the map could have been recorded on the submission of approved security and agreements. The determination of whether any map constitutes an expired recordable map shall be made by the County Surveyor. | For the purposes of this subsection, an expired recordable final map or Schedule "E" parcel map shall mean an approved tentative tract map or parcel map for which approved improvement plans had been submitted to the County Surveyor, the final or parcel map was ready for signature, and the map could have been recorded on the submission of approved security and agreements. The determination of whether any map constitutes an expired recordable map shall be made by the County Surveyor. | |
| (3) | Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
|
| F. | Air Quality Element Fee | Air Quality Element Fee | Air Quality Element Fee | |
| In addition to the fees set forth in subsections (A), (B) and (E) of this section, the applicant for any residential; tentative subdivision map or residential parcel map shall pay a per lot fee and the applicant for any statutory condominium subdivision map shall pay a per unit fee for the purposes of preparing and implementing an air quality element of the general plan. | ||||
| (1) | Air Quality Element Fee Per Lot or Unit | Air Quality Element Fee Per Lot or Unit | Air Quality Element Fee Per Lot or Unit | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $13 | ||
| G. | Refund of Fees under this section for Non-Deposit-Based Fees. | Refund of Fees under this section for Non-Deposit-Based Fees. | Refund of Fees under this section for Non-Deposit-Based Fees. | |
| (1) | Whenever any application, fee or permit is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the board of supervisors, refund fees paid, upon the written request of the applicant. If any portion of the application fees has been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency or department for a refund of the fees paid to it, in accordance with the refund policy statement. | Whenever any application, fee or permit is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the board of supervisors, refund fees paid, upon the written request of the applicant. If any portion of the application fees has been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency or department for a refund of the fees paid to it, in accordance with the refund policy statement. | Whenever any application, fee or permit is terminated for any reason, the Planning Department may, in accordance with the refund policy statement adopted by the board of supervisors, refund fees paid, upon the written request of the applicant. If any portion of the application fees has been paid by the Planning Department to another jurisdiction, agency or department for the performance of services related to the application, the Planning Department will not refund any such portion of fees until the other jurisdiction, agency or department authorizes the Planning Department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency or department for a refund of the fees paid to it, in accordance with the refund policy statement. | |
| (2) | The Planning Department shall retain a processing fee from the total amount to be refunded. | The Planning Department shall retain a processing fee from the total amount to be refunded. | The Planning Department shall retain a processing fee from the total amount to be refunded. | $82 |
(Ord. No. 2021-09, § 4, 4-15-2021)
Sec. 3.65.070. - Fire Code fees.¶
The fees under Chapter 8.10 shall be paid to the County Fire Chief and deposited into the general fund, and shall be as follows or until modified by resolution by the City Council:
| A. | Engineering | Engineering | Engineering | Fee Amount |
|---|---|---|---|---|
| (1) | Plan Checks-Buildings | Plan Checks-Buildings | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $1,056 | ||
| (2) | Site Inspections (where required) | Site Inspections (where required) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $110 | ||
| (3) | Division of Real Estate Letters (including self-addressed, stamped envelope) | Division of Real Estate Letters (including self-addressed, stamped envelope) | Division of Real Estate Letters (including self-addressed, stamped envelope) | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $88 | ||
| (4) | Major Industrial Projects, Research Reports | Major Industrial Projects, Research Reports | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department time and charges deposit | (i) Fire Department time and charges deposit | $584 | ||
| (5) | Fire Protection Systems, Plan Checks, Inspections | Fire Protection Systems, Plan Checks, Inspections | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $614 | ||
| (6) | "Hood-Duct" System Plan Check and Inspection | "Hood-Duct" System Plan Check and Inspection | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $215 | ||
| (7) | Follow-up Inspection for Noncompliance | Follow-up Inspection for Noncompliance | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $110 | ||
| B. | Miscellaneous Plan Check/ |
Miscellaneous Plan Check/ |
Deposit-based fee: | |
| (1) | Fire Alarm Evacuation Plan Check plus one inspection | Fire Alarm Evacuation Plan Check plus one inspection | Fire Alarm Evacuation Plan Check plus one inspection | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $627 | ||
| (2) | Monitoring System Plan Check plus one inspection | Monitoring System Plan Check plus one inspection | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $192 | ||
| (3) | Tenant Improvement Building/ |
Tenant Improvement Building/ |
Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $696 | ||
| C. | Fire Safety Inspections (Licensed Care) | Fire Safety Inspections (Licensed Care) | Fire Safety Inspections (Licensed Care) | |
| (1) | First Inspection (New License) | First Inspection (New License) | Deposit-based fee: | |
| (a) 6 or less | (a) 6 or less | (a) 6 or less | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $85 | ||
| (b) 7 or more | (b) 7 or more | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $169 | ||
| (2) | Inspection for Change in License | Inspection for Change in License | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $85 | ||
| (3) | Annual Inspection (No Change in Occupancy) | Annual Inspection (No Change in Occupancy) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $42 | ||
| (4) | Follow-up Inspection for Noncompliance | Follow-up Inspection for Noncompliance | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $17 | ||
| D. | Fire Safety Inspections (Commercial/ |
Fire Safety Inspections (Commercial/ |
Fire Safety Inspections (Commercial/ |
|
| (1) | Retail Buildings/ |
Retail Buildings/ |
Retail Buildings/ |
|
| (a) Up through 2,499 sq. ft. | (a) Up through 2,499 sq. ft. | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $61 | ||
| (b) 2,500 through 4,999 sq. ft. | (b) 2,500 through 4,999 sq. ft. | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $86 | ||
| (c) 5,000 sq. ft. or more | (c) 5,000 sq. ft. or more | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $129 | ||
| (2) | Manufacturing | Manufacturing | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $129 | ||
| (3) | Commercial | Commercial | Commercial | |
| (a) Up through 4,999 sq. ft. | (a) Up through 4,999 sq. ft. | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $86 | ||
| (b) 5,000 sq. ft. or more | (b) 5,000 sq. ft. or more | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $129 | ||
| (4) | Restaurants | Restaurants | Restaurants | |
| (a) Up through 4,999 sq. ft. | (a) Up through 4,999 sq. ft. | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $86 | ||
| (b) 5,000 sq. ft. or more | (b) 5,000 sq. ft. or more | Deposit-based fee: | ||
| (i) General Fund | (i) General Fund | |||
| a. Fire Department | a. Fire Department | $129 | ||
| (5) | Hotels/ |
Hotels/ |
Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department per story | (i) Fire Department per story | $86 | ||
| plus per unit fee | plus per unit fee | $3 | ||
| (6) | Mobilehome RV Parks: Incidental Use Areas | Mobilehome RV Parks: Incidental Use Areas | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $86 | ||
| plus per site fee over 20 | plus per site fee over 20 | $3 | ||
| (7) | Follow-up Inspection for Noncompliance | Follow-up Inspection for Noncompliance | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $126 | ||
| E. | Miscellaneous | Miscellaneous | Miscellaneous | |
| (1) | Tank Installation Use or Permit, and Inspections | Tank Installation Use or Permit, and Inspections | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $217 | ||
| plus per additional tank fee over 1 | plus per additional tank fee over 1 | $32 | ||
| (2) | Water System Flow Test | Water System Flow Test | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department per hydrant | (i) Fire Department per hydrant | $178 | ||
| (3) | Special Inspections (Access, Clearance, Housekeeping, etc.) | Special Inspections (Access, Clearance, Housekeeping, etc.) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Fire Department | (i) Fire Department | $126 |
Sec. 3.65.080. - Earthquake zone fees.¶
The fees to be paid under Chapter 8.45 for the following shall be as follows or until modified by resolution by the City Council:
| A. | Filing of a Geologic Report for Approval | Filing of a Geologic Report for Approval | Deposit-based fee: | Fee Amount |
|---|---|---|---|---|
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $800 | ||
| for a parcel 10 acres in size or less plus a fee for each additional acre | for a parcel 10 acres in size or less plus a fee for each additional acre | $20 | ||
| to a maximum fee for additional acreage | to a maximum fee for additional acreage | $770 | ||
| (b) Public Works Department—Comprehensive Transportation Plan | (b) Public Works Department—Comprehensive Transportation Plan | $38 | ||
| for a parcel 10 acres in size or less plus a fee for each additional acre | for a parcel 10 acres in size or less plus a fee for each additional acre | $2 | ||
| to a maximum fee | to a maximum fee | $53 | ||
| B. | Waiver of Geologic Report | Waiver of Geologic Report | Deposit-based fee: | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $135 | ||
| plus an additional fee upon submission to State Geologist of recommendation of approval of waiver by County Geologist | plus an additional fee upon submission to State Geologist of recommendation of approval of waiver by County Geologist | $344 | ||
| (b) Public Works Department—Comprehensive Transportation Plan | (b) Public Works Department—Comprehensive Transportation Plan | $5 | ||
| plus an additional fee upon submission to State Geologist of recommendation of approval of waiver by County Geologist. | plus an additional fee upon submission to State Geologist of recommendation of approval of waiver by County Geologist. | $28 |
Sec. 3.65.090. - Surface mining fees.¶
The fees to be paid under Chapter 5.65 for the following shall be as follows or until modified by resolution by the City Council:
| A. | Surface Mining Permit | Surface Mining Permit | Deposit-based fee: | Fee Amount |
|---|---|---|---|---|
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $5,000 | ||
| (b) Environmental Health | (b) Environmental Health | $284 | ||
| (c) Building and Safety | (c) Building and Safety | $1,602 | ||
| (2) Flood Control District | (2) Flood Control District | (2) Flood Control District | $836 | |
| (3) Public Works Department | (3) Public Works Department | (3) Public Works Department | $1,156 | |
| (4) Parks District | (4) Parks District | (4) Parks District | $164 | |
| (5) Public Works Department—Comprehensive Transportation Plan | (5) Public Works Department—Comprehensive Transportation Plan | (5) Public Works Department—Comprehensive Transportation Plan | $318 | |
| B. | Reclamation Plans submitted for vested operations conducted after January 1, 1976 | Reclamation Plans submitted for vested operations conducted after January 1, 1976 | Deposit-based fee: | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $2,069 | ||
| (2) Public Works Department | (2) Public Works Department | (2) Public Works Department | $535 | |
| (3) Public Works Department—Comprehensive Transportation Plan | (3) Public Works Department—Comprehensive Transportation Plan | (3) Public Works Department—Comprehensive Transportation Plan | $147 | |
| (4) Flood Control | (4) Flood Control | (4) Flood Control | $836 | |
| C. | Appeal of Planning Commission Decision | Appeal of Planning Commission Decision | Appeal of Planning Commission Decision | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $371 | ||
| (2) Public Works Department (If road condition appealed) | (2) Public Works Department (If road condition appealed) | (2) Public Works Department (If road condition appealed) | $81 | |
| (3) Public Works Department—Comprehensive Transportation Plan | (3) Public Works Department—Comprehensive Transportation Plan | (3) Public Works Department—Comprehensive Transportation Plan | $27 | |
| D. | Special Inspection Permit | Special Inspection Permit | Deposit-based fee: | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Building and Safety | (a) Building and Safety | $230 | ||
| E. | Substantial Conformance | Substantial Conformance | Deposit-based fee: | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $237 | ||
| (b) Building and Safety | (b) Building and Safety | $469 | ||
| (c) Public Works Department—Comprehensive Transportation Plan | (c) Public Works Department—Comprehensive Transportation Plan | $17 | ||
| F. | Revised Permit | Revised Permit | Deposit-based fee: | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department 50% of current base fee of parent case | (a) Planning Department 50% of current base fee of parent case | 50% | ||
| (b) Public Works Department—Comprehensive Transportation Plan | (b) Public Works Department—Comprehensive Transportation Plan | $67 | ||
| (c) Building and Safety | (c) Building and Safety | $664 |
Sec. 3.65.100. - Historic preservation fees.¶
The fees to be paid under Chapter 8.55 for the following shall be as follows or until modified by resolution by the City Council:
| A. | Certificate of Historic Appropriateness | Certificate of Historic Appropriateness | Deposit-based fee: | Fee Amount |
|---|---|---|---|---|
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $216 | ||
| (b) Public Works Department—Comprehensive Transportation Plan | (b) Public Works Department—Comprehensive Transportation Plan | $16 | ||
| (2) Parks District | (2) Parks District | (2) Parks District | $473 | |
| B. | Appeals | Appeals | Appeals | |
| (1) General Fund | (1) General Fund | (1) General Fund | ||
| (a) Planning Department | (a) Planning Department | $120 | ||
| (b) Public Works Department—Comprehensive Transportation Plan | (b) Public Works Department—Comprehensive Transportation Plan | $9 |
Sec. 3.65.110. - Septic tank fees.¶
The fees to be paid under Chapter 6.65 sewage discharges for the following shall be as follows or until modified by resolution by the City Council.
| Deposited into the General Fund: | Deposited into the General Fund: | Deposited into the General Fund: | Fee Amount | |
|---|---|---|---|---|
| A. | Sewage Disposal Plan Review | Sewage Disposal Plan Review | Sewage Disposal Plan Review | $234 |
| (1) For each residential system or commercial/ |
||||
| (a) Second review when needed due to modifications, additions or deletions to previously approved design | (a) Second review when needed due to modifications, additions or deletions to previously approved design | $41 | ||
| (2) Concurrent submittal or three or more residential of commercial/ |
(2) Concurrent submittal or three or more residential of commercial/ |
Deposit-based fee | $550 | |
| (3) Alternative and experimental sewage disposal systems including on-site evaluation and plan review | (3) Alternative and experimental sewage disposal systems including on-site evaluation and plan review | Deposit-based fee | $700 | |
| (4) Holding tank approval | (4) Holding tank approval | (4) Holding tank approval | $129 | |
| (5) Grease traps | (5) Grease traps | (5) Grease traps | $190 | |
| (6) Commercial/ |
(6) Commercial/ |
Deposit-based fee | $500 | |
| B. | Grading Plan Review | Grading Plan Review | Grading Plan Review | |
| (1) | Grading Plan, Septic | Grading Plan, Septic | $88 | |
| (2) | Grading Plan, Sewered | Grading Plan, Sewered | $58 | |
| C. | Site evaluation in addition to Sewage Disposal Plan Review fees as identified above, required in Critical Subsurface Sewage Disposal Areas as determined by the Director of Environmental Health | Site evaluation in addition to Sewage Disposal Plan Review fees as identified above, required in Critical Subsurface Sewage Disposal Areas as determined by the Director of Environmental Health | Site evaluation in addition to Sewage Disposal Plan Review fees as identified above, required in Critical Subsurface Sewage Disposal Areas as determined by the Director of Environmental Health | $230 |
| D. | Sewer/ |
Sewer/ |
Sewer/ |
|
| (1) Environmental Health sewer verification, including tenet improvements on sewer per parcel | ||||
| (2) Environmental Health septic verification, site development permit review, including review of C-42 information; per parcel | (2) Environmental Health septic verification, site development permit review, including review of C-42 information; per parcel | (2) Environmental Health septic verification, site development permit review, including review of C-42 information; per parcel | $89 | |
| E. | Division of Real Estate Letter | Division of Real Estate Letter | Division of Real Estate Letter | $74 |
| F. | Second Visit—Same site | Second Visit—Same site | Second Visit—Same site | $105 |
| G. | Consultations, including non-specified requested reviews, inspections or investigations | Consultations, including non-specified requested reviews, inspections or investigations | Consultations, including non-specified requested reviews, inspections or investigations | |
| (1) Hourly rate | (1) Hourly rate | (1) Hourly rate | $105 | |
| (2) Minimum rate at ¼ hour | (2) Minimum rate at ¼ hour | (2) Minimum rate at ¼ hour | $27 |
Sec. 3.65.120. - Water well fees.¶
The fees to be paid under Chapter 15.20 for the following shall be as follows or until modified by resolution by the City Council:
| A. | The following fees shall be paid to the Department of Environmental Health and deposited into the General Fund: | The following fees shall be paid to the Department of Environmental Health and deposited into the General Fund: | The following fees shall be paid to the Department of Environmental Health and deposited into the General Fund: | Fee Amount |
|---|---|---|---|---|
| (1) | Well Permits (Including Plan review, initial site inspection and initial water quality samples where required) | Well Permits (Including Plan review, initial site inspection and initial water quality samples where required) | Well Permits (Including Plan review, initial site inspection and initial water quality samples where required) | |
| (a) Individual | (a) Individual | (a) Individual | $416 | |
| (b) Community | (b) Community | Deposit-based fee: | $560 | |
| (c) Agricultural | (c) Agricultural | (c) Agricultural | $154 | |
| (d) Monitoring well | (d) Monitoring well | (d) Monitoring well | ||
| (i) Initial | (i) Initial | $136 | ||
| (ii) Additional wells on the same site, submitted at the same time | (ii) Additional wells on the same site, submitted at the same time | $64 | ||
| (e) Cathodic well | (e) Cathodic well | (e) Cathodic well | $197 | |
| (f) Driven well | (f) Driven well | (f) Driven well | $52 | |
| (g) Well abandonment | (g) Well abandonment | (g) Well abandonment | $151 | |
| (h) Permit extension | (h) Permit extension | (h) Permit extension | $63 | |
| (i) Other well | (i) Other well | (i) Other well | $263 | |
| (j) Permit transfer fee | (j) Permit transfer fee | (j) Permit transfer fee | $25 | |
| (2) | Well evaluation | Well evaluation | Well evaluation | $350 |
| (3) | Second field visit | Second field visit | Second field visit | $131 |
| (4) | Consultations, including non-specified requested reviews, inspections or investigations | Consultations, including non-specified requested reviews, inspections or investigations | Consultations, including non-specified requested reviews, inspections or investigations | |
| (a) Hourly rate | (a) Hourly rate | (a) Hourly rate | $105 | |
| (b) Minimum rate at ¼ hour | (b) Minimum rate at ¼ hour | (b) Minimum rate at ¼ hour | $27 | |
| (5) | Annual well driller registration | Annual well driller registration | Annual well driller registration | $33 |
| (6) | Water samples, lab costs: Second samples, additional requested sampling and rush samples at laboratory cost | Water samples, lab costs: Second samples, additional requested sampling and rush samples at laboratory cost | Water samples, lab costs: Second samples, additional requested sampling and rush samples at laboratory cost | At Cost |
Sec. 3.65.130. - Preapplication review fees.¶
The fees to be paid under Chapter 8.35 for the following shall be as follows or until modified by resolution by the City Council and shall be paid to the Community Development Director:
| A. | General Fund | Deposit-based fee: | Fee Amount |
|---|---|---|---|
| (1) Planning Department | (1) Planning Department | $707 | |
| (2) Environmental Health | (2) Environmental Health | $156 | |
| (3) Fire Department | (3) Fire Department | $93 | |
| (4) Building and Safety | (4) Building and Safety | $121 | |
| B. | Flood Control District | Flood Control District | $139 |
| C. | Public Works Department (general) | Public Works Department (general) | $168 |
| D. | Parks District | Parks District | $88 |
(Ord. No. 2021-09, § 4, 4-15-2021)
Sec. 3.65.140. - Fees for implementing California Environmental Quality Act (CEQA).¶
The fees and EIR deposits for environmental review pursuant to the Rules for Jurupa Valley Implementing the California Environmental Quality Act for the following shall be as follows or until modified by resolution by the City Council:
| A. | No fee shall be required for the following projects: | No fee shall be required for the following projects: | No fee shall be required for the following projects: | |
|---|---|---|---|---|
| (1) | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an initial study is conducted to determine if the project is exempt. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an initial study is conducted to determine if the project is exempt. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an initial study is conducted to determine if the project is exempt. | |
| (2) | County projects when the fee will be paid into the same fund into which it is deposited. | County projects when the fee will be paid into the same fund into which it is deposited. | County projects when the fee will be paid into the same fund into which it is deposited. | |
| (3) | Requests to improve and accept a road into the county maintained road system. | Requests to improve and accept a road into the county maintained road system. | Requests to improve and accept a road into the county maintained road system. | |
| (4) | Preparation of an initial study on an application to change the zoning designation on a parcel when the application is require to be filed as a condition of approval on a previously approved application. | Preparation of an initial study on an application to change the zoning designation on a parcel when the application is require to be filed as a condition of approval on a previously approved application. | Preparation of an initial study on an application to change the zoning designation on a parcel when the application is require to be filed as a condition of approval on a previously approved application. | |
| B. | The fees required for requests to conduct initial studies relating to the following applications shall be paid to the Planning Department as follows: | The fees required for requests to conduct initial studies relating to the following applications shall be paid to the Planning Department as follows: | The fees required for requests to conduct initial studies relating to the following applications shall be paid to the Planning Department as follows: | Fee Amount |
| (1) | Applications for Grading Permits | Applications for Grading Permits | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $900 | ||
| plus per acre fee (to a maximum of $2,729) | plus per acre fee (to a maximum of $2,729) | $6 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $51 | ||
| (2) | Applications for Commercial Wind Energy Conservation System Permits (Commercial WECS Permits) | Applications for Commercial Wind Energy Conservation System Permits (Commercial WECS Permits) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $471 | ||
| plus per gross acre fee | plus per gross acre fee | $6 | ||
| to a maximum | to a maximum | $2,201 | ||
| plus per gross megawatt (MW) fee applied for | plus per gross megawatt (MW) fee applied for | $307 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $36 | ||
| plus per gross megawatt (MW) fee applied for | plus per gross megawatt (MW) fee applied for | $22 | ||
| (3) | All Other Applications | All Other Applications | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $414 | ||
| plus fee per gross acre | plus fee per gross acre | $6 | ||
| to a maximum | to a maximum | $2,416 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $48 | ||
| Whenever two or more applications are filed concurrently by the same applicant for the same property, only one fee for the preparation of an initial study shall be required. | ||||
| C. | The deposits required for the preparation of the draft EIR shall be paid to the Planning Department as follows: | The deposits required for the preparation of the draft EIR shall be paid to the Planning Department as follows: | The deposits required for the preparation of the draft EIR shall be paid to the Planning Department as follows: | |
| (1) | If the project sponsor prepares the draft EIR: | If the project sponsor prepares the draft EIR: | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $7,187 | ||
| (ii) Environmental Health | (ii) Environmental Health | $395 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $529 | ||
| (b) Parks District | (b) Parks District | (b) Parks District | $328 | |
| (2) | If, pursuant to Section 706 of the Rules for Riverside County Implementing the California Environmental Quality Act, a previously prepared EIR is utilized as the draft EIR: | If, pursuant to Section 706 of the Rules for Riverside County Implementing the California Environmental Quality Act, a previously prepared EIR is utilized as the draft EIR: | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $1,126 | ||
| (ii) Environmental Health | (ii) Environmental Health | $395 | ||
| (iii) Public Works Department—Comprehensive Transportation Plan | (iii) Public Works Department—Comprehensive Transportation Plan | $87 | ||
| (b) Parks District | (b) Parks District | (b) Parks District | $328 | |
| D. | The fees for the preparation of the following environmental reports shall be paid to the Planning Department as follows: | The fees for the preparation of the following environmental reports shall be paid to the Planning Department as follows: | The fees for the preparation of the following environmental reports shall be paid to the Planning Department as follows: | |
| (1) | Fault Hazard Report Review (CEQA) | Fault Hazard Report Review (CEQA) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department for the first 10 acres | (i) Planning Department for the first 10 acres | $800 | ||
| plus per each additional acre fee (two reviews) | plus per each additional acre fee (two reviews) | $20 | ||
| to a maximum | to a maximum | $770 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan for the first 10 acres | (ii) Public Works Department—Comprehensive Transportation Plan for the first 10 acres | $38 | ||
| plus per each additional acre fee | plus per each additional acre fee | $2 | ||
| to a maximum | to a maximum | $53 | ||
| (2) | Geologic Waiver | Geologic Waiver | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $135 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $5 | ||
| (3) | Liquefaction Report | Liquefaction Report | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department (two reviews) | (i) Planning Department (two reviews) | $800 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $38 | ||
| E. | The fees required for the preparation of the following special studies shall be paid to the Flood Control District as follows: | The fees required for the preparation of the following special studies shall be paid to the Flood Control District as follows: | The fees required for the preparation of the following special studies shall be paid to the Flood Control District as follows: | |
| (1) | Flood Control Special Studies | Flood Control Special Studies | Deposit-based fee: | |
| If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a minor case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a minor case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a minor case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a minor case, payable at the Flood Control District. | $750 |
| (2) | Flood Control Special Studies | Flood Control Special Studies | Deposit-based fee: | |
| If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a major case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a major case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a major case, payable at the Flood Control District. | If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a major case, payable at the Flood Control District. | $3,000 |
| (3) | Federal Emergency Management Agency (FEMA) studies) | Federal Emergency Management Agency (FEMA) studies) | Federal Emergency Management Agency (FEMA) studies) | |
| (a) Conditional Letter of Map Revision (CLOMR) | (a) Conditional Letter of Map Revision (CLOMR) | Deposit-based fee: | ||
| Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | $5,000 |
| (b) CLOMR to LOMR (Letter of Map Revision) | ||||
| Conversion fee shall be paid at the Flood Control District prior to recordation. | Conversion fee shall be paid at the Flood Control District prior to recordation. | Conversion fee shall be paid at the Flood Control District prior to recordation. | Conversion fee shall be paid at the Flood Control District prior to recordation. | $2,582 |
| F. | The fees for the preparation of the following special studies shall be paid to the Public Works Department as follows: | The fees for the preparation of the following special studies shall be paid to the Public Works Department as follows: | The fees for the preparation of the following special studies shall be paid to the Public Works Department as follows: | |
| (1) | Traffic Study without model (if required) | Traffic Study without model (if required) | Deposit-based fee: | $1,252 |
| (2) | Traffic Study with model (if required) | Traffic Study with model (if required) | Deposit-based fee: | $1,811 |
Sec. 3.65.150. - Rules and regulations governing agricultural preserves in county fees.¶
The fees under Chapter 4.10 for the following shall be as follows or until modified by resolution by the City Council:
| A. | The appropriate fee, as listed below, shall accompany the application and is not refundable: | The appropriate fee, as listed below, shall accompany the application and is not refundable: | The appropriate fee, as listed below, shall accompany the application and is not refundable: | Fee Amount |
|---|---|---|---|---|
| (1) | Establishment or enlargement of an agricultural preserve (applicant initiated) | Establishment or enlargement of an agricultural preserve (applicant initiated) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $1,523 | ||
| plus per owner's petition fee | plus per owner's petition fee | $130 | ||
| per contract upon approval of application (nonrefundable) | per contract upon approval of application (nonrefundable) | $130 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $117 | ||
| plus per owner's petition fee | plus per owner's petition fee | $8 | ||
| a fee per contract upon approval of application (nonrefundable) | a fee per contract upon approval of application (nonrefundable) | $8 | ||
| (2) | Establishment or enlargement of an agricultural preserve (Board of Supervisors initiated) | Establishment or enlargement of an agricultural preserve (Board of Supervisors initiated) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $138 | ||
| owner's petition plus per contract fee | owner's petition plus per contract fee | $130 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $9 | ||
| plus per contract fee | plus per contract fee | $8 | ||
| (3) | Execution of a Land Conservation Contract for land within an established agricultural preserve | Execution of a Land Conservation Contract for land within an established agricultural preserve | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department per contract | (i) Planning Department per contract | $138 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $9 | ||
| (4) | Disestablishment or Diminishment of an Agricultural Preserve (Applicant Initiated) | Disestablishment or Diminishment of an Agricultural Preserve (Applicant Initiated) | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department (non-refundable) | (i) Planning Department (non-refundable) | $1,443 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $107 | ||
| (5) | Disestablishment or diminishment of an agricultural preserve (Board of Supervisors initiated)—No fee | Disestablishment or diminishment of an agricultural preserve (Board of Supervisors initiated)—No fee | Disestablishment or diminishment of an agricultural preserve (Board of Supervisors initiated)—No fee | |
| (6) | Notice of Nonrenewal | Notice of Nonrenewal | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Planning Department | (i) Planning Department | $248 | ||
| (ii) Public Works Department—Comprehensive Transportation Plan | (ii) Public Works Department—Comprehensive Transportation Plan | $4 |
Sec. 3.65.160. - Vacating or accepting roads.¶
The fees for the following in connection with vacating or accepting roads shall be as follows or until modified by resolution by the City Council.
| A. | Vacation of public streets, highways and service easements pursuant to the Public Streets, Highways, and Service Easements Vacation Law (Sts. & Hy. Code Section 8300 et seq. ) | Vacation of public streets, highways and service easements pursuant to the Public Streets, Highways, and Service Easements Vacation Law (Sts. & Hy. Code Section 8300 et seq. ) | Vacation of public streets, highways and service easements pursuant to the Public Streets, Highways, and Service Easements Vacation Law (Sts. & Hy. Code Section 8300 et seq. ) | Fee Amount |
|---|---|---|---|---|
| (1) | General Vacations | General Vacations | Deposit-based fee: | |
| (a) General Vacations | (a) General Vacations | (a) General Vacations | ||
| (i) Survey | (i) Survey | $3,793 | ||
| (ii) Fire | (ii) Fire | $172 | ||
| (2) | Summary Vacations | Summary Vacations | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Survey | (i) Survey | $1,434 | ||
| (ii) Fire | (ii) Fire | $77 | ||
| B. | Street Names | Street Names | Deposit-based fee: | |
| (1) | Change Requiring Public Hearings | Change Requiring Public Hearings | Change Requiring Public Hearings | |
| (a) General Vacations | (a) General Vacations | (a) General Vacations | ||
| (i) Survey for first street name | (i) Survey for first street name | $308 | ||
| plus per additional street name fee | plus per additional street name fee | $77 | ||
| (2) | Over the Counter Approval | Over the Counter Approval | Over the Counter Approval | |
| (a) General Fund | (a) General Fund | (a) General Fund | ||
| (i) Survey—Per street name | (i) Survey—Per street name | $77 |
Sec. 3.65.170. - Miscellaneous fees.¶
The fees for the following shall be as follows or until modified by resolution by the City Council:
| A. | (1) Archival search fee for planning information | (1) Archival search fee for planning information | (1) Archival search fee for planning information | Fee Amount | |
|---|---|---|---|---|---|
| Per hour fee of staff time expended computed at $8 per each ¼ hr. or fraction thereof for information or documents which are not readily available and accessible. | Per hour fee of staff time expended computed at $8 per each ¼ hr. or fraction thereof for information or documents which are not readily available and accessible. | Per hour fee of staff time expended computed at $8 per each ¼ hr. or fraction thereof for information or documents which are not readily available and accessible. | Hourly rates as set through the annual budget process | ||
| (a) General Fund | (a) General Fund | ||||
| (i) Planning Department | |||||
| (2) Research fee for planning information | (2) Research fee for planning information | (2) Research fee for planning information | Hourly rates as set through the annual budget process | ||
| Per hour fee of staff time expended computed at $13.75 per each ¼ hr. or fraction thereof for information or documents which are not readily available and accessible. | |||||
| (a) General Fund | (a) General Fund | ||||
| (i) Planning Department | |||||
| B. | (1) Flood Control research/ |
(1) Flood Control research/ |
(1) Flood Control research/ |
||
| No fee will be imposed for the first half hour of service, thereafter, however, per hour fee of staff time expended, for information or documents which are not readily available and accessible. | No fee will be imposed for the first half hour of service, thereafter, however, per hour fee of staff time expended, for information or documents which are not readily available and accessible. | No fee will be imposed for the first half hour of service, thereafter, however, per hour fee of staff time expended, for information or documents which are not readily available and accessible. | $65/hr. | ||
| C. | (1) Parks District research fee for historic verification | (1) Parks District research fee for historic verification | (1) Parks District research fee for historic verification | ||
| Per hour fee of staff time expended | Per hour fee of staff time expended | Per hour fee of staff time expended | $82/hr. | ||
| (2) Parks District research fee for natural resources review | |||||
| Per hour fee | Per hour fee | Per hour fee | $88/hr. | ||
| (3) Parks District research fee for verification of Historic and Archeological Resources Review (consultant) | |||||
| Per hour fee | Per hour fee | Per hour fee | $189/hr. | ||
| D. | (1) Environmental Health Department consultation fee per hour | (1) Environmental Health Department consultation fee per hour | (1) Environmental Health Department consultation fee per hour | $68/hr. | |
| Per additional ¼ hour | Per additional ¼ hour | Per additional ¼ hour | $18 | ||
| E. | (1) Review of covenants, conditions, and restrictions required by conditions of development permit | (1) Review of covenants, conditions, and restrictions required by conditions of development permit | (1) Review of covenants, conditions, and restrictions required by conditions of development permit | Deposit-based fee: | |
| (a) General Fund | (a) General Fund | ||||
| (i) City Attorney | $240 | ||||
| (2) Review of Specific Plan Zone Ordinance as part of Specific Plan | (2) Review of Specific Plan Zone Ordinance as part of Specific Plan | (2) Review of Specific Plan Zone Ordinance as part of Specific Plan | Deposit-based fee: | ||
| (a) General Fund | (a) General Fund | ||||
| (i) County Counsel | $1,200 | ||||
| F. | (1) Batch plant certification | (1) Batch plant certification | (1) Batch plant certification | ||
| (a) Public Works Department | (a) Public Works Department | $567 | |||
| Plus each additional visit | Plus each additional visit | $345 | |||
| (2) Mix design checking | (2) Mix design checking | (2) Mix design checking | |||
| (a) Public Works Department | (a) Public Works Department | ||||
| Per mix | Per mix | $35 | |||
| G. | (1) Miscellaneous survey services | (1) Miscellaneous survey services | (1) Miscellaneous survey services | ||
| (a) Survey | (a) Survey | $63/hr. | |||
| H. | (1) Graffiti sales | (1) Graffiti sales | (1) Graffiti sales | ||
| (a) License | (a) License | $45 | |||
| (b) License renewal | (b) License renewal | $30 | |||
| (c) Annual inspection based on fully burdened rate, Building Inspector II | (c) Annual inspection based on fully burdened rate, Building Inspector II | ½ hr. |