Article XI — Changes to FCC Standards.

Imperial Zoning Code · 2026-07 edition · ingested 2026-07-06 · Imperial

26-13. If the FCC RF emission standards are modified, the Operator shall ensure that the facility is reevaluated for compliance with the new standards, and a recertification statement prepared by a Radio-frequency Exposure Professional shall be submitted by the Operator to the Planning Director prior to the effective date of the new FCC RF emission standards. For an amateur radio station facility, self-certification of compliance by the amateur radio station license is acceptable if permitted by FCC regulations and conducted under standards and procedures set forth by the FCC.