Chapter XXXI — SUBDIVISION <sup> </sup>›Article III — IMPROVEMENTS
31-19 CURBS AND GUTTERS.
Danville Municipal Code · 2026-09 edition · updated 2026-10-02 · Danville
31-19.1 Requirements.¶
- a. Conditions Requiring Curbs . Curbs shall be required under any of the following conditions:
The subdivision is within an R-20 district or a district having a smaller lot size;
The grade of the street is less than one (1%) percent or more than six (6%) percent;
The street frontage between adjacent sections of curb is less than five hundred (500') feet;
The subdivision is for commercial or industrial purposes.
b. Block Requirements . If curbs are required in any portion of a block within the subdivision, the entire frontage along that block shall be curbed.
c. Minimum Grade . The minimum grade for curbs and gutters shall be one (1%) percent except a reduction may be authorized by the Engineering Department.
d. Designation on Improvement Plans . Improvement plans shall show curb profiles, including profiles for all curb returns and cul-de-sacs.
- e. Minimum Elevations . Minimum top of curb elevations shall conform to Section 31-28.
31-19.2 Turnarounds.¶
a. Cul-de-sac . A paved turnaround shall be provided at the ends of cul-de-sac streets. The radius for the edge of pavement or curbline, shall be thirty-five (35') feet.
- b. Radii for Curb Returns . Curblines at street intersections and turnarounds shall be constructed on a curve having a radius equal to that shown below:
Standard Radius for Curb Returns
All residential street intersections, twenty (20') feet;
Cul-de-sac turnaround, thirty-five (35') feet;
Industrial street intersections, thirty (30') feet.
c. Private Road Turnaround . A paved turnaround area shall be provided at the end of any private road serving more than two (2) lots. The radius for the edge of the pavement shall be thirty-five (35') feet. Alternate turnaround provisions may be approved if adequate paved area is provided to accommodate normal residential traffic.
31-19.3 Driveways.¶
a. Encroachment Permit Required . An encroachment permit shall be obtained from the Engineering Department before construction of any driveway.
Get a plain-English answer with a citation back to this text.
Ask AI about this code