Chapter XXXI — SUBDIVISION›Article III — IMPROVEMENTS

Danville Municipal Code § 31-19 Curbs and Gutters

Danville Municipal Code · 2026-10 edition · updated 2026-10-04 · Danville

Cite as: Danville Municipal Code § 31-19 · Text as of 2026-10-04

31-19.1 Requirements.

a. Conditions Requiring Curbs. Curbs shall be required under any of the following conditions:

  1. The subdivision is within an R-20 district or a district having a smaller lot size;

  2. The grade of the street is less than one (1%) percent or more than six (6%) percent;

  3. The street frontage between adjacent sections of curb is less than five hundred (500') feet;

  4. The subdivision is for commercial or industrial purposes.

b. Block Requirements. If curbs are required in any portion of a block within the subdivision, the entire frontage along that block shall be curbed.

c. Minimum Grade. The minimum grade for curbs and gutters shall be one (1%) percent except a reduction may be authorized by the Engineering Department.

d. Designation on Improvement Plans. Improvement plans shall show curb profiles, including profiles for all curb returns and cul-de-sacs.

e. Minimum Elevations. Minimum top of curb elevations shall conform to Section 31-28.

Exceptions & meaning →

31-19.2 Turnarounds.

a. Cul-de-sac. A paved turnaround shall be provided at the ends of cul-de-sac streets. The radius for the edge of pavement or curbline, shall be thirty-five (35') feet.

b. Radii for Curb Returns. Curblines at street intersections and turnarounds shall be constructed on a curve having a radius equal to that shown below:

Standard Radius for Curb Returns

    1. All residential street intersections, twenty (20') feet;
    1. Cul-de-sac turnaround, thirty-five (35') feet;
    1. Industrial street intersections, thirty (30') feet.

c. Private Road Turnaround. A paved turnaround area shall be provided at the end of any private road serving more than two (2) lots. The radius for the edge of the pavement shall be thirty-five (35') feet. Alternate turnaround provisions may be approved if adequate paved area is provided to accommodate normal residential traffic.

Exceptions & meaning →

31-19.3 Driveways.

a. Encroachment Permit Required. An encroachment permit shall be obtained from the Engineering Department before construction of any driveway.

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Danville Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.