Chapter XXXI — SUBDIVISION›Article III — IMPROVEMENTS
Danville Municipal Code § 31-19 Curbs and Gutters
Danville Municipal Code · 2026-10 edition · updated 2026-10-04 · Danville
Cite as: Danville Municipal Code § 31-19 · Text as of 2026-10-04
31-19.1 Requirements.¶
a. Conditions Requiring Curbs. Curbs shall be required under any of the following conditions:
The subdivision is within an R-20 district or a district having a smaller lot size;
The grade of the street is less than one (1%) percent or more than six (6%) percent;
The street frontage between adjacent sections of curb is less than five hundred (500') feet;
The subdivision is for commercial or industrial purposes.
b. Block Requirements. If curbs are required in any portion of a block within the subdivision, the entire frontage along that block shall be curbed.
c. Minimum Grade. The minimum grade for curbs and gutters shall be one (1%) percent except a reduction may be authorized by the Engineering Department.
d. Designation on Improvement Plans. Improvement plans shall show curb profiles, including profiles for all curb returns and cul-de-sacs.
e. Minimum Elevations. Minimum top of curb elevations shall conform to Section 31-28.
31-19.2 Turnarounds.¶
a. Cul-de-sac. A paved turnaround shall be provided at the ends of cul-de-sac streets. The radius for the edge of pavement or curbline, shall be thirty-five (35') feet.
b. Radii for Curb Returns. Curblines at street intersections and turnarounds shall be constructed on a curve having a radius equal to that shown below:
Standard Radius for Curb Returns
- All residential street intersections, twenty (20') feet;
- Cul-de-sac turnaround, thirty-five (35') feet;
- Industrial street intersections, thirty (30') feet.
c. Private Road Turnaround. A paved turnaround area shall be provided at the end of any private road serving more than two (2) lots. The radius for the edge of the pavement shall be thirty-five (35') feet. Alternate turnaround provisions may be approved if adequate paved area is provided to accommodate normal residential traffic.
31-19.3 Driveways.¶
a. Encroachment Permit Required. An encroachment permit shall be obtained from the Engineering Department before construction of any driveway.