Skip to content

Title 13 — Planning, Zoning and DevelopmentChapter XIV — OIL DRILLING

§ 13-292. Permit and inspection fees.

Costa Mesa Zoning Code · 2026-06 edition · updated 2026-07-25 · Costa Mesa

The first application for a permit to cover drilling operations for a single oil and gas well hole on any drilling site outside the City of Costa Mesa for slant or subterranean drilling within the City of Costa Mesa shall require the payment of a permit fee in the sum of $2,500. The fee for any second or subsequent such oil and gas well shall be $500.

The permit fee to cover the maintenance and production of any existing oil and gas well, producing oil and gas at the time this chapter becomes effective [April 29, 1960], shall be $50 annually for any such oil and gas well. (Ord. No. 97-11, § 2, 5-5-97)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Costa Mesa Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.