Earlier editions: 2020-112018-112026-09
DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 6. WATER DEVELOPMENT PROJECTS 12570-12949.5›CHAPTER 2. Approved Projects 12639-12751›ARTICLE 2. Projects in the Sacramento-San Joaquin Watersheds 12645-12670.23
§ 12654
California Water Code · 2026-10 edition · updated 2026-10-04 · California
The project for the Fresno County Stream Group for flood control is adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 845, Seventy-sixth Congress, Third Session, at an estimated cost to the State of one hundred seventy-nine thousand five hundred dollars ($179,500).
(Added by Stats. 1953, Ch. 196.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code