Skip to content

Earlier editions: 2020-112018-112026-09

DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 6. WATER DEVELOPMENT PROJECTS 12570-12949.5›CHAPTER 2. Approved Projects 12639-12751›ARTICLE 2. Projects in the Sacramento-San Joaquin Watersheds 12645-12670.23

§ 12651

California Water Code · 2026-10 edition · updated 2026-10-04 · California

The plan of improvement for flood control and other purposes on the Lower San Joaquin River and tributaries, including Tuolumne and Stanislaus Rivers, is adopted and authorized in accordance with the recommendations of the Chief of Engineers in Flood Control Committee Document Numbered 2, Seventy-eighth Congress, Second Session, at an estimated cost to the State of eight hundred ninety-four thousand dollars ($894,000).

(Added by Stats. 1953, Ch. 196.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Water Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.