Earlier editions: 2020-112018-112026-09
DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES 10000-12999›PART 6. WATER DEVELOPMENT PROJECTS 12570-12949.5›CHAPTER 2. Approved Projects 12639-12751›ARTICLE 2. Projects in the Sacramento-San Joaquin Watersheds 12645-12670.23
§ 12649
California Water Code · 2026-10 edition · updated 2026-10-04 · California
It is the intention of the Legislature that, if a feasible plan can be found which will provide adequate flood control in the upper Sacramento Valley without the necessity of constructing a dam across the Sacramento River at the Table Mountain site, or any other site in the same general vicinity and thereby prevent the necessity of flooding valuable agricultural land and at the same time prevent damage to the fishing resources of the Sacramento River, such alternate plan should be adopted.
(Added by Stats. 1953, Ch. 196.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code