Chapter 1 — SCOPE AND APPLICATION
Section R108
California Residential Code (Title 24, Part 2.5) · 2022 edition · updated 2026-09-12 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
R108.1 Payment of fees.¶
A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment to a permit be released until the additional fee, if any, has been paid.
R108.2 Schedule of permit fees.¶
On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the applicable governing authority.
R108.3 Building permit valuations.¶
Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment and other permanent systems, including materials and labor.
R108.4 Related fees.¶
The payment of the fee for the construction, alteration, removal or demolition for work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law.
R108.5 Refunds.¶
The building official is authorized to establish a refund policy.
R108.6 Work commencing before permit issuance.¶
Any person who commences work requiring a permit on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fee established by the applicable governing authority that shall be in addition to the required permit fees.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Residential Code (Title 24, Part 2.5)
- Chapter 2 — DEFINITIONS AND ABBREVIATIONS
- Appendix AF — RADON CONTROL
- Appendix AI — PRIVATE SEWAGE
- Appendix AJ — EXISTING
- Appendix AK — SOUND
- Appendix AO — AUTOMATIC
- Appendix AR — LIGHT STRAW-CLAY
- Appendix AS — STRAWBALE
- Appendix AU — COB CONSTRUCTION
- Appendix AV — BOARD
- Appendix AW — 3D-PRINTED BUILDING
▸Chapter 1 — SCOPE AND APPLICATION
Overview- Section 1.2
- Section 1.3
- Section 1.4
- Section 1.5
- Section 1.6
- Section 1.7
- Section 1.8
- Section 1.8.2
- Section 1.8.3
- Section 1.8.4
- Section 1.8.5
- Section 1.8.6
- Section 1.8.7
- Section 1.8.8
- Section 1.8.9
- Section 1.8.10
- Section 1.9
- Section 1.10
- Section 1.11
- Section 1.12
- Section 1.13
- Section 1.14
- Section R101
- Section R102
- Section R103
- Section R104
- Section R105
- Section R106
- Section R107
- Section R108
- Section R109
- Section R110
- Section R111
- Section R112
- Section R113
- Section R114
- Section R201
- Section R202
- Chapter 3 — BUILDING PLANNING
- Chapter 4 — FOUNDATIONS
- Chapter 5 — FLOORS
- Chapter 6 — WALL CONSTRUCTION
- Chapter 7 — WALL COVERING
- Chapter 8 — ROOF-CEILING CONSTRUCTION
- Chapter 9 — ROOF ASSEMBLIES
- Chapter 10 — CHIMNEYS AND FIREPLACES
- Chapter 44 — REFERENCED STANDARDS
- Appendix AH — PATIO COVERS
- Appendix AL — PERMIT FEES
- Appendix AQ — TINY HOUSES
- Appendix AT — SOLAR-READY PROVISIONS—DETACHED ONE- AND
- Appendix AX — SWIMMING POOL SAFETY ACT
- Appendix AY — AREAS PROTECTED BY THE FACILITIES
- Appendix AZ — EMERGENCY HOUSING