Appendix BE — RADON CONTROL METHODS

Section BE104 — TESTING

2025 California Residential Code (Title 24, Part 2.5) · 2025 edition · updated 2026-07-27 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

BE104.1 TESTING.

Where radon-resistant construction is required, radon testing shall be as specified in Items 1 through 11:

  1. Testing shall be performed after the dwelling passes its air tightness test.

  2. Testing shall be performed after the radon control system and HVAC installations are complete. The HVAC system shall be operating during the test. Where the radon system has an installed fan, the dwelling shall be tested with the radon fan operating.

  3. Testing shall be performed at the lowest occupied floor level, whether or not that space is finished. Spaces that are physically separated and served by different HVAC systems shall be tested separately.

  4. Testing shall not be performed in a closet, hallway, stairway, laundry room, furnace room, bathroom or kitchen.

  5. Testing shall be performed with a commercially available radon test kit or testing shall be performed by an approved third party with a continuous radon monitor. Testing with test kits shall include two tests, and the test results shall be averaged. Testing shall be in accordance with this section and the testing laboratory kit manufacturer’s instructions.

  6. Testing shall be performed with the windows closed. Testing shall be performed with the exterior doors closed, except when being used for entrance or exit. Windows and doors shall be closed for not fewer than 12 hours prior to the testing.

  7. Testing shall be performed by the builder, a registered design professional or an approved third party.

  8. Testing shall be conducted over a period of not less than 48 hours or not less that the period specified by the testing device manufacturer, whichever is longer.

  9. Written radon test results shall be provided by the test lab or testing party. The final written test report with results less than 4 picocuries per liter (pCi/L) shall be provided to the code official.

  10. Where the radon test result is 4 pCi/L or greater, the fan for the radon vent pipe shall be installed as specified in Sections BE103.9 and BE103.12.

  11. Where the radon test result is 4 pCi/L or greater, the system shall be modified and retested until the test result is less than 4 pCi/L.

Exception: Testing is not required where the occupied space is located above an unenclosed open space.

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

APPENDIX BE-12 2025 CALIFORNIA RESIDENTIAL CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

CALIFORNIA RESIDENTIAL CODE – MATRIX ADOPTION TABLE

APPENDIX BF – PATIO COVERS

(Matrix Adoption Tables are nonregulatory, intended only as an aid to the code user. See Chapter 1 for state agency authority and building applications.)

Adopting agency BSC BSC-
CG
SFM HCD DSA OSHPD BSCC DPH AGR DWR CEC CA SL SLC
Adopting agency BSC BSC-
CG
SFM 1 2 1/AC AC SS SS/CC 1 1R 2 3 4 5 5 5 5 5 5 5 5 5
Adopt entire chapter X X
Adopt entire chapter as
amended (amended
sections listed below)
Adopt only those sections
that are listed below
Chapter / Section
103.2 X

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

APPENDIX BF-2 2025 CALIFORNIA RESIDENTIAL CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Residential Code (Title 24, Part 2.5)
2025 California Residential Code (Title 24, Part 2.5)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — BUILDING PLANNING
  4. Chapter 4 — FOUNDATIONS
  5. Chapter 5 — FLOORS
  6. Chapter 6 — WALL CONSTRUCTION
  7. Chapter 7 — WALL COVERING
  8. Chapter 8 — ROOF-CEILING CONSTRUCTION
  9. Chapter 9 — ROOF ASSEMBLIES
  10. Chapter 10 — CHIMNEYS AND FIREPLACES
  11. Chapter 44 — REFERENCED STANDARDS
  12. Appendix AA — BOARD OF APPEALS
  13. Appendix AB — PERMIT FEES
  14. Appendix AC — RESERVED
  15. Appendix BA — RESERVED
  16. Appendix BB — TINY HOUSES
  17. Appendix BC — RESERVED
  18. Appendix BD — RESERVED
  19. Appendix BE — RADON CONTROL METHODS
  20. Appendix BF — PATIO COVERS
  21. Appendix BG — SOUND TRANSMISSION
  22. Appendix BH — AUTOMATIC VEHICULAR GATES
  23. Appendix BI — LIGHT STRAW-CLAY CONSTRUCTION
  24. Appendix BJ — STRAWBALE CONSTRUCTION
  25. Appendix BK — COB CONSTRUCTION (MONOLITHIC ADOBE)
  26. Appendix BL — HEMP-LIME (HEMPCRETE) CONSTRUCTION
  27. Appendix BM — 3D-PRINTED BUILDING CONSTRUCTION
  28. Appendix BN — EXTENDED PLATE WALL CONSTRUCTION
  29. Appendix BO — EXISTING BUILDINGS AND STRUCTURES
  30. Appendix CA — RESERVED
  31. Appendix CB — RESERVED
  32. Appendix CC — RESERVED
  33. Appendix CD — RESERVED
  34. Appendix CE — RESERVED
  35. Appendix CF — RESERVED
  36. Appendix CG — NONSEWERED SANITATION SYSTEMS
  37. Appendix CH — PRIVATE SEWAGE DISPOSAL
  38. Appendix CI — SWIMMING POOL SAFETY ACT
  39. Appendix CJ — EMERGENCY HOUSING
  40. Appendix CK — AREAS PROTECTED BY THE FACILITIES OF THE CENTRAL…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.