Appendix BE — RADON CONTROL METHODS
Section BE102 — DEFINITIONS
2025 California Residential Code (Title 24, Part 2.5) · 2025 edition · updated 2026-07-27 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
BE102.1 General. ¶
For the purpose of these requirements, the terms used shall be defined as follows:
DRAIN TILE LOOP. A continuous length of drain tile or perforated pipe extending around all or part of the internal or external perimeter of a basement or crawl space footing.
RADON GAS. A naturally occurring, chemically inert, radioactive gas that is not detectable by human senses. As a gas, it can move readily through particles of soil and rock, and can accumulate under the slabs and foundations of homes where it can easily enter into the living space through construction cracks and openings.
SOIL-GAS-RETARDER. A continuous membrane of 6-mil (0.15 mm) polyethylene or other equivalent material used to retard the flow of soil gases into a building.
SUBMEMBRANE DEPRESSURIZATION SYSTEM. A system designed to achieve lower submembrane air pressure relative to crawl space air pressure by use of a vent drawing air from beneath the soil-gas-retarder membrane.
SUBSLAB DEPRESSURIZATION SYSTEM (Active). A system designed to achieve lower subslab air pressure relative to indoor air pressure by use of a fan-powered vent drawing air from beneath the slab.
SUBSLAB DEPRESSURIZATION SYSTEM (Passive). A system designed to achieve lower subslab air pressure relative to indoor air pressure by use of a vent pipe routed through the conditioned space of a building and connecting the subslab area with outdoor air, thereby relying on the convective flow of air upward in the vent to draw air from beneath the slab.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — 2025 California Residential Code (Title 24, Part 2.5)
- Chapter 1 — ADMINISTRATION
- Chapter 2 — DEFINITIONS
- Chapter 3 — BUILDING PLANNING
- Chapter 4 — FOUNDATIONS
- Chapter 5 — FLOORS
- Chapter 6 — WALL CONSTRUCTION
- Chapter 7 — WALL COVERING
- Chapter 8 — ROOF-CEILING CONSTRUCTION
- Chapter 9 — ROOF ASSEMBLIES
- Chapter 10 — CHIMNEYS AND FIREPLACES
- Chapter 44 — REFERENCED STANDARDS
- Appendix AA — BOARD OF APPEALS
- Appendix AB — PERMIT FEES
- Appendix AC — RESERVED
- Appendix BA — RESERVED
- Appendix BB — TINY HOUSES
- Appendix BC — RESERVED
- Appendix BD — RESERVED
-
▸ Appendix BE — RADON CONTROL METHODS
- Appendix BF — PATIO COVERS
- Appendix BG — SOUND TRANSMISSION
- Appendix BH — AUTOMATIC VEHICULAR GATES
- Appendix BI — LIGHT STRAW-CLAY CONSTRUCTION
- Appendix BJ — STRAWBALE CONSTRUCTION
- Appendix BK — COB CONSTRUCTION (MONOLITHIC ADOBE)
- Appendix BL — HEMP-LIME (HEMPCRETE) CONSTRUCTION
- Appendix BM — 3D-PRINTED BUILDING CONSTRUCTION
- Appendix BN — EXTENDED PLATE WALL CONSTRUCTION
- Appendix BO — EXISTING BUILDINGS AND STRUCTURES
- Appendix CA — RESERVED
- Appendix CB — RESERVED
- Appendix CC — RESERVED
- Appendix CD — RESERVED
- Appendix CE — RESERVED
- Appendix CF — RESERVED
- Appendix CG — NONSEWERED SANITATION SYSTEMS
- Appendix CH — PRIVATE SEWAGE DISPOSAL
- Appendix CI — SWIMMING POOL SAFETY ACT
- Appendix CJ — EMERGENCY HOUSING
- Appendix CK — AREAS PROTECTED BY THE FACILITIES OF THE CENTRAL…