Skip to content

Appendix BE — RADON CONTROL METHODS

Section BE101 — SCOPE

2025 California Residential Code (Title 24, Part 2.5) · 2025 edition · updated 2026-07-27 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

BE101.1 General.

This appendix contains requirements for new construction in jurisdictions where radon-resistant construction is required.

Inclusion of this appendix by jurisdictions shall be determined through the use of locally available data or determination of Zone 1 designation in Figure BE101.1 and Table BE101.1.

FIGURE BE101.1—EPA MAP OF RADON ZONES

a. pCi/L stands for picocuries per liter of radon gas. The US Environmental Protection Agency (EPA) recommends that homes that measure 4 pCi/L and greater be mitigated. The EPA and the US Geological Survey have evaluated the radon potential in the United States and have developed a map of radon zones designed to assist building officials in deciding whether radon-resistant features are applicable in new construction. The map assigns each of the 3,141 counties in the United States to one of three zones based on radon potential. Each zone designation reflects the average short-term radon measurement that can be expected to be measured in a building without the implementation of radon-control methods. The radon zone designation of highest priority is Zone

  1. Table BE101.1 lists the Zone 1 counties illustrated on the map. More detailed information can be obtained from state-specific booklets (EPA-401-R-93-021 through 070) available through the State Radon Offices or from the EPA Regional Offices.

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

APPENDIX BE RADON CONTROL METHODS

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Residential Code (Title 24, Part 2.5)
2025 California Residential Code (Title 24, Part 2.5)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — BUILDING PLANNING
  4. Chapter 4 — FOUNDATIONS
  5. Chapter 5 — FLOORS
  6. Chapter 6 — WALL CONSTRUCTION
  7. Chapter 7 — WALL COVERING
  8. Chapter 8 — ROOF-CEILING CONSTRUCTION
  9. Chapter 9 — ROOF ASSEMBLIES
  10. Chapter 10 — CHIMNEYS AND FIREPLACES
  11. Chapter 44 — REFERENCED STANDARDS
  12. Appendix AA — BOARD OF APPEALS
  13. Appendix AB — PERMIT FEES
  14. Appendix AC — RESERVED
  15. Appendix BA — RESERVED
  16. Appendix BB — TINY HOUSES
  17. Appendix BC — RESERVED
  18. Appendix BD — RESERVED
  19. Appendix BE — RADON CONTROL METHODS
  20. Appendix BF — PATIO COVERS
  21. Appendix BG — SOUND TRANSMISSION
  22. Appendix BH — AUTOMATIC VEHICULAR GATES
  23. Appendix BI — LIGHT STRAW-CLAY CONSTRUCTION
  24. Appendix BJ — STRAWBALE CONSTRUCTION
  25. Appendix BK — COB CONSTRUCTION (MONOLITHIC ADOBE)
  26. Appendix BL — HEMP-LIME (HEMPCRETE) CONSTRUCTION
  27. Appendix BM — 3D-PRINTED BUILDING CONSTRUCTION
  28. Appendix BN — EXTENDED PLATE WALL CONSTRUCTION
  29. Appendix BO — EXISTING BUILDINGS AND STRUCTURES
  30. Appendix CA — RESERVED
  31. Appendix CB — RESERVED
  32. Appendix CC — RESERVED
  33. Appendix CD — RESERVED
  34. Appendix CE — RESERVED
  35. Appendix CF — RESERVED
  36. Appendix CG — NONSEWERED SANITATION SYSTEMS
  37. Appendix CH — PRIVATE SEWAGE DISPOSAL
  38. Appendix CI — SWIMMING POOL SAFETY ACT
  39. Appendix CJ — EMERGENCY HOUSING
  40. Appendix CK — AREAS PROTECTED BY THE FACILITIES OF THE CENTRAL…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.