Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
Section 501A
California Existing Building Code (Title 24, Part 10) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
GENERAL
501 A .1 Scope. The provisions of this chapter shall control the alteration, addition and change of occupancy of existing buildings and structures, including historic buildings and structures as referenced in Section 301 A .3.1. The provisions of this chapter shall apply to existing structures for applica- tions listed in Section 1.10.1 [OSHPD 1] regulated by the Office of Statewide Health Planning and Development (OSHPD).
501 A .1.1 Compliance with other methods. Alterations, additions and changes of occupancy to existing buildings and structures shall comply with the provisions of this chapter or with one of the methods or procedures provided in Section 301.3.
501 A .2 Fire-resistance ratings. Fire-resistance ratings shall comply with the California Building Standards Code.
501A.3 Prescriptive compliance provisions. Alterations,¶
additions and changes of occupancy to the following catego- ries of existing buildings and structures shall comply with the provisions of this section.
501A.3.1 Prescriptive compliance provisions for SPC-4D using the California Building Code, 1980 (CBC 1980). Nonconforming buildings shall satisfy the following requirements:
1. The California Building Code, 1980 (CBC 1980), as used in this chapter, consists of the Uniform Build- ing Code, 1979 (UBC 1979) along with require- ments contained in:
a) California Code of Regulations, Title 24-
Building Standards, dated February 2, 1980 (Revision record for Register 80, No. 5).
b) California Code of Regulations, Title 22 –
Social Security, dated October 13, 1979 (Revi- sion Record for Register 79, No 41).
c) California Code of Regulations, Title 17 –
Public Health, dated October 13, 1979 (Revi- sion Record for Register 79, No 41-B). 2. All existing structural elements of Seismic Force Resisting System (SFRS) shall satisfy the detailing requirements in the CBC 1980 or demonstrate that the level of seismic performance is equivalent to that given in the CBC 1980, as determined by the build- ing official.
3. A continuous load path or paths with adequate strength and stiffness to transfer all the forces from the point of origin to final point of resistance shall be justified by analysis.
4. Site data report in accordance with the CBC 1980 shall establish that seismically induced differential settlement does not exceed 1 ″ in 40 ′ .
5. Adjacent buildings shall satisfy the SPC building separation requirements in accordance with the California Administrative Code, Chapter 6 Section 3.4.
6. The addition of new structural elements or strength- ening of existing structural elements for retrofit of nonconforming buildings to SPC-4D shall comply with the following:
a) The seismic demand (forces or displacements)
shall be in accordance with the CBC 1980;
b) Capacity, detailing and connections for new
structural elements shall satisfy the require- ments in the CBC 2019 for new construction; and
c) The strengthening of existing structural ele-
ments shall use capacities determined in accordance with the CBC 2019 for new con- struction consistent with the detailing and connections used in the strengthened member. 7. All construction, quality assurance and quality con- trol shall be in accordance with the new construc- tion provisions of CBC 2019.
8. Elements not part of the Seismic Force-Resisting System (SFRS), including those identified in the Cal- ifornia Administrative Code Chapter 6, Article 10, shall be evaluated using seismic forces and the requirements of the CBC 1980.
9. Any column or wall that forms part of two or more intersecting SFRS and is subjected to axial load due to seismic forces acting along either principal plan axis equaling or exceeding 20 percent of the axial design strength of the column or wall shall be evalu- ated for the most critical load effect due to applica- tion of seismic force in any direction. The most critical load effect may be deemed to be satisfied if members and their foundations are evaluated for 100 percent of the forces for one direction plus 30
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
PRESCRIPTIVE COMPLIANCE METHOD
percent of the forces for the perpendicular direction, whereby the combination produces the maximum effect.
Exceptions: The following buildings (with struc- tural irregularities or unusual configuration/sys- tem) shall not be eligible for the SPC-4D upgrade using the prescriptive provisions in this section:
1. Buildings with prohibited irregularities in accordance with California Building Code Section 1617A.1.10.
2. Buildings taller than 5 stories or 65' height above the base having horizontal or verti- cal irregularities in accordance with ASCE 7 Tables 12.3-1 Items # 1a, 1b and 3 or 12.3-2 Items #1a, 1b, 5a and 5b.
3. Buildings with unusual configuration or structural system, as determined by the building official. 501A.3.2 Prescriptive compliance provisions for SPC-4D using the new building design requirements of this code. Structures satisfying the requirements of the California Building Code for new general acute care hospital build- ings design shall be deemed to satisfy the SPC-4D requirements of Table 2.5.3, Chapter 6 of the California Administrative Code.
All existing structural elements of a Seismic Force- Resisting System (SFRS) shall satisfy the detailing requirements of the California Building Code for new con- struction or demonstrate that the level of seismic perfor- mance is equivalent, as determined by the building official. A demonstration of equivalence shall consider the regularity, overstrength, redundancy and ductility of the structure.
Elements not part of the Seismic Force-Resisting Sys- tem (SFRS), including those identified in the California Administrative Code Chapter 6, Article 10, shall be evalu- ated using seismic forces and the requirements of this code for new general acute care hospital buildings.
501A.3.3 Prescriptive compliance provisions for NPC 2, NPC 3, NPC 4 or NPC 4D and NPC 5.
501A.3.3.1 Supports and attachments of nonstructural components, except those listed in Section 501A.3.3.2 below, in buildings in seismic performance categories SPC 1 or SPC 2 with a performance level of NPC 3 or higher, and SPC 3, SPC 4 or SPC-4D, shall be permit- ted to comply with the provisions of Section 1630B of the 1998 California Building Code using an impor- tance factor Ip=1.5. The capacity of welds, anchors and fasteners shall be determined in accordance with requirements of the California Building Code for new construction.
501A.3.3.2 Supports and attachments for systems listed under NPC-2 and NPC-5 (excluding those specifically listed for NPC-3 and NPC-4 or NPC-4D) in the Cali- fornia Administrative Code, Chapter 6, Table 11.1 shall satisfy the requirements of the California Building
Code for new construction and Section 501A.3.3.1 above shall not be applicable.
501A.3.3.3 For NPC 3 and NPC 4 or NPC 4D in SPC 2, SPC 3, SPC 4 or SPC-4D buildings, the adequacy and design of nonstructural component or equipment supports and attachments may extend only to the con- nection of the component or equipment to the support when the total reaction at the point of support (includ- ing the application of Fp) is less than or equal to the following limits:
1. 250 pounds for components or equipment attached to light frame walls. For the purposes of this requirement, the sum of the absolute value of all reactions due to component loads on a single stud shall not exceed 250 pounds.
2. 1,000 pounds for components or equipment attached to roofs or walls of reinforced concrete or masonry construction.
3. 2,000 pounds for components or equipment attached to floors or slabs-on-grade.
Exception: If the anchorage or bracing is configured in a manner that results in significant torsion on a supporting structural element, the effects of the nonstructural reaction force on the structural element shall be considered in the anchorage design.
501 A .4 Health care facilities. In Group I-2 facilities, ambulatory care facilities and outpatient clinics, any altered or added portion of an existing electrical or medical gas systems shall be required to meet installation and equipment requirements in NFPA 99.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Existing Building Code (Title 24, Part 10)
- Chapter 2 — DEFINITIONS
- Appendix A — GUIDELINES FOR
- Appendix B — SUPPLEMENTARY
- Appendix C — GUIDELINES FOR THE WIND
- Appendix D — BOARD OF
- Chapter 1 — SCOPE AND ADMINISTRATION
- Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 4 — REPAIRS
▸Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 6 — CLASSIFICATION OF WORK
- Chapter 7 — ALTERATIONS—LEVEL 1
- Chapter 8 — ALTERATIONS—LEVEL 2
- Chapter 9 — ALTERATIONS—LEVEL 3
- Chapter 10 — CHANGE OF OCCUPANCY
- Chapter 11 — ADDITIONS
- Chapter 12 — HISTORIC BUILDINGS
- Chapter 13 — PERFORMANCE COMPLIANCE METHODS
- Chapter 14 — RELOCATED OR MOVED BUILDINGS
- Chapter 15 — CONSTRUCTION SAFEGUARDS
- Chapter 16 — REFERENCED STANDARDS