Chapter 15 — CONSTRUCTION SAFEGUARDS
Section 1507
California Existing Building Code (Title 24, Part 10) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
AUTOMATIC SPRINKLER SYSTEM
[F] 1507.1 Completion before occupancy. In buildings where an automatic sprinkler system is required by this code or the California Building Code, it shall be unlawful to occupy any portions of a building or structure until the automatic sprinkler system installation has been tested and approved, except as provided in Section 110.3.
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
CONSTRUCTION SAFEGUARDS
[F] 1507.2 Operation of valves. Operation of sprinkler control valves shall be permitted only by properly authorized personnel and shall be accompanied by notification of duly designated parties. When the sprinkler protection is being regularly turned off and on to facilitate connection of newly completed segments, the sprinkler control valves shall be checked at the end of each work period to ascertain that protection is in service.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Existing Building Code (Title 24, Part 10)
- Chapter 2 — DEFINITIONS
- Appendix A — GUIDELINES FOR
- Appendix B — SUPPLEMENTARY
- Appendix C — GUIDELINES FOR THE WIND
- Appendix D — BOARD OF
- Chapter 1 — SCOPE AND ADMINISTRATION
- Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 4 — REPAIRS
- Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 6 — CLASSIFICATION OF WORK
- Chapter 7 — ALTERATIONS—LEVEL 1
- Chapter 8 — ALTERATIONS—LEVEL 2
- Chapter 9 — ALTERATIONS—LEVEL 3
- Chapter 10 — CHANGE OF OCCUPANCY
- Chapter 11 — ADDITIONS
- Chapter 12 — HISTORIC BUILDINGS
- Chapter 13 — PERFORMANCE COMPLIANCE METHODS
- Chapter 14 — RELOCATED OR MOVED BUILDINGS
▸Chapter 15 — CONSTRUCTION SAFEGUARDS
- Chapter 16 — REFERENCED STANDARDS