Chapter 1 — ADMINISTRATION

Section 106 — CONSTRUCTION DOCUMENTS

2025 California Existing Building Code (Title 24, Part 10) · 2025 edition · updated 2026-07-29 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

[A] 106.1 General. Submittal documents consisting of construction documents, special inspection and structural observation programs, investigation and evaluation reports, and other data shall be submitted in two or more sets, or in a digital format where allowed by the code official, with each application for a permit. The construction documents shall be prepared by a registered

1-26 2025 CALIFORNIA EXISTING BUILDING CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

ADMINISTRATION

design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Where special conditions exist, the code official is authorized to require additional construction documents to be prepared by a registered design professional.

Exception: The code official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that reviewing of construction documents is not necessary to obtain compliance with this code.

[A] 106.2 Construction documents. Construction documents shall be in accordance with Sections 106.2.1 through 106.2.6.

[A] 106.2.1 Construction documents. Construction documents shall be dimensioned and drawn on suitable material. Electronic media documents are permitted to be submitted where approved by the code official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the code official. The work areas shall be shown.

[A] 106.2.2 Fire protection system(s) shop drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate compliance with this code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain information as required by the referenced installation standards in Chapter 9 of the California Build- ing Code .

[A] 106.2.3 Means of egress. The construction documents for Alterations—Level 2, Alterations—Level 3, additions and changes of occupancy shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of this code. The construction documents shall designate the number of occupants to be accommodated in every work area of every floor and in all affected rooms and spaces.

Alterations—Level 2, Alterations—Level 3, additions and changes of occupancy shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of this code. The construction documents shall designate the number of occupants to be accommodated in every work area of every floor and in all affected rooms and spaces.

[A] 106.2.4 Exterior wall envelope. Construction documents for work affecting the exterior wall envelope shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. The construction documents shall provide details of the exterior wall envelope as required, including windows, doors, flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive barriers and details around openings.

The construction documents shall include manufacturer’s installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the wind and weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system that was tested, where applicable, as well as the test procedure used.

[A] 106.2.5 Exterior balconies and elevated walking surfaces. Where the scope of work involves balconies or other elevated walking surfaces have weather-exposed surfaces, and the structural framing is protected by an impervious moisture barrier, the construction documents shall include details for all elements of the impervious moisture barrier system. The construction documents shall include manufacturer’s installation instructions.

[A] 106.2.6 Site plan. The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades, and the proposed finished grades; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The code official is authorized to waive or modify the requirement for a site plan where the application for permit is for alteration, repair or change of occupancy.

[A] 106.3 Examination of documents. The code official shall examine or cause to be examined the submittal documents and shall ascertain by such examinations whether the construction or occupancy indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.

[A] 106.3.1 Approval of construction documents. Where the code official issues a permit, the construction documents shall be approved in writing or by stamp as “Reviewed for Code Compliance.” One set of construction documents so reviewed shall be retained by the code official. The other set shall be returned to the applicant, shall be kept at the site of work, and shall be open to inspection by the code official or a duly authorized representative.

[A] 106.3.2 Previous approval. This code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been issued and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned.

[A] 106.3.3 Phased approval. The code official is authorized to issue a permit for the construction of foundations or any other part of a building before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this code. The holder of such permit for the foundation or other parts of a building shall proceed at the holder’s own risk with the building operation and without assurance that a permit for the entire structure will be granted.

[A] 106.3.4 Deferred submittals. Deferral of any submittal items shall have the prior approval of the code official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the code official.

Submittal documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the code official with a notation indicating that the deferred submittal docu

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

ADMINISTRATION

ments have been reviewed and that they have been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until their deferred submittal documents have been approved by the code official.

[A] 106.4 Amended construction documents. Work shall be installed in accordance with the reviewed construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents.

[A] 106.5 Retention of construction documents. One set of approved construction documents shall be retained by the code official for a period of not less than the period required for retention of public records.

[A] 106.6 Design professional in responsible charge. Where it is required that documents be prepared by a registered design professional, the code official shall be authorized to require the owner or the owner’s authorized agent to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner or the owner’s authorized agent shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The code official shall be notified in writing by the owner or the owner’s authorized agent if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. Where structural observation is required, the inspection program shall name the individual or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Existing Building Code (Title 24, Part 10)
2025 California Existing Building Code (Title 24, Part 10)
  1. Chapter 1 — ADMINISTRATION
    Overview
    1. Section 1.1 — GENERAL
    2. Section 1.2 — BUILDING STANDARDS COMMISSION
    3. Section 1.3 — BOARD OF STATE AND COMMUNITY CORRECTIONS
    4. Section 1.4 — DEPARTMENT OF CONSUMER AFFAIRS
    5. Section 1.5 — CALIFORNIA ENERGY COMMISSION
    6. Section 1.6 — DEPARTMENT OF FOOD AND AGRICULTURE
    7. Section 1.7 — DEPARTMENT OF PUBLIC HEALTH
    8. Section 1.8 — DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT
    9. Section 1.8.2 — AUTHORITY AND ABBREVIATIONS
    10. Section 1.8.3 — LOCAL ENFORCING AGENCY
    11. Section 1.8.4 — PERMITS, FEES, APPLICATIONS AND INSPECTIONS
    12. Section 1.8.5 — RIGHT OF ENTRY FOR ENFORCEMENT
    13. Section 1.8.6 — LOCAL MODIFICATION BY ORDINANCE OR REGULATION
    14. Section 1.8.7 — ALTERNATE MATERIALS, DESIGNS, TESTS AND METHOD…
    15. Section 1.8.8 — APPEALS BOARD
    16. Section 1.8.9 — UNSAFE BUILDINGS OR STRUCTURES
    17. Section 1.8.10 — OTHER BUILDING REGULATIONS
    18. Section 1.9 — DIVISION OF THE STATE ARCHITECT
    19. Section 1.10 — DEPARTMENT OF HEALTH CARE ACCESS AND INFORMATIO…
    20. Section 1.11 — OFFICE OF THE STATE FIRE MARSHAL
    21. Section 1.12 — STATE LIBRARIAN
    22. Section 1.13 — DEPARTMENT OF WATER RESOURCES
    23. Section 1.14 — CALIFORNIA STATE LANDS COMMISSION
    24. Section 101 — SCOPE AND GENERAL REQUIREMENTS
    25. Section 102 — APPLICABILITY
    26. Section 103 — CODE COMPLIANCE AGENCY
    27. Section 104 — DUTIES AND POWERS OF CODE OFFICIAL
    28. Section 105 — PERMITS
    29. Section 106 — CONSTRUCTION DOCUMENTS
    30. Section 107 — TEMPORARY USES, EQUIPMENT AND SYSTEMS
    31. Section 108 — FEES
    32. Section 109 — INSPECTIONS
    33. Section 110 — CERTIFICATE OF OCCUPANCY
    34. Section 111 — SERVICE UTILITIES
    35. Section 112 — MEANS OF APPEALS
    36. Section 113 — VIOLATIONS
    37. Section 114 — STOP WORK ORDER
    38. Section 115 — UNSAFE STRUCTURES AND EQUIPMENT
    39. Section 116 — EMERGENCY MEASURES
    40. Section 117 — DEMOLITION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
  4. Chapter 3A — PROVISIONS FOR ALL COMPLIANCE METHODS
  5. Chapter 4 — REPAIRS
  6. Chapter 4A — REPAIRS
  7. Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
  8. Chapter 5A — PRESCRIPTIVE COMPLIANCE METHOD
  9. Chapter 6 — CLASSIFICATION OF WORK
  10. Chapter 7 — ALTERATIONS—LEVEL 1
  11. Chapter 8 — ALTERATIONS—LEVEL 2
  12. Chapter 9 — ALTERATIONS—LEVEL 3
  13. Chapter 10 — CHANGE OF OCCUPANCY
  14. Chapter 11 — ADDITIONS
  15. Chapter 12 — HISTORIC BUILDINGS
  16. Chapter 13 — PERFORMANCE COMPLIANCE METHODS
  17. Chapter 14 — RELOCATED OR MOVED BUILDINGS
  18. Chapter 15 — CONSTRUCTION SAFEGUARDS
  19. Chapter 16 — REFERENCED STANDARDS
  20. Appendix A — GUIDELINES FOR THE SEISMIC RETROFIT OF EXISTING B…
  21. Appendix B — SUPPLEMENTARY ACCESSIBILITY REQUIREMENTS FOR EXIS…
  22. Appendix C — GUIDELINES FOR THE WIND RETROFIT OF EXISTING BUIL…
  23. Appendix D — BOARD OF APPEALS
  24. Appendix E — TEMPORARY EMERGENCY USES
  25. Appendix A — GUIDELINES ON FIRE RATINGS OF ARCHAIC MATERIALS A…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.