Chapter 18 — SOILS AND FOUNDATIONS
Section 1813 — VIBRO STONE COLUMNS FOR GROUND IMPROVEMENT [OSHPD 1R, 2 & 5]
2025 California Building Code (Title 24, Part 2) · 2025 edition · ingested 2026-07-07 · California
Full text via GoCodebook AI
We have the complete 2025 text of this code. Ask a question and get the exact controlling section with a citation.
1813.1 General. ¶
1813.1 General. This section shall apply to Vibro Stone Columns (VSCs) for ground improvement using unbounded aggregate materials. Vibro stone column provisions in this section are intended to increase bearing capacity, reduce settlements and mitigate liquefaction for shallow foundations. These requirements shall not be used for grouted or bonded stone columns, ground improvement for deep founda- tion elements or changing site class. VSCs shall not be considered as a deep foundation element. Ground improvement shall be installed under the entire building/structure footprint and not under…
1813.2 Geotechnical report. ¶
1813.2 Geotechnical report. The geotechnical report shall specify vibro stone column requirements to ensure uniformity in total and differential immediate settlement, long-term settlement and earthquake-induced settlement. The report shall address the following: 1. Soil compaction shall be sufficient to mitigate potential for liquefaction as described in California Geological Survey (CGS) Special Publication 117A (SP-117A): Guidelines for Evaluating and Mitigating Seismic Hazard in California. 2. The area replacement ratio for the compaction elements and the basis of its determination shall…
1813.3 Shallow Foundations. ¶
1813.3 Shallow Foundations. VSCs under the shallow foundation shall be located symmetrically around the centroid of the footing or load, and: 1. There shall be a minimum of four stone columns under each isolated or continuous/combined footing or an approved equivalent. 2. The VSCs or deep foundation elements shall not be used to resist tension or overturning uplift from the shallow foundations. 3. The foundation design for the shallow foundation shall consider the increased vertical stiffness of the VSCs as point supports for analysis, unless it is substantiated that the installation of the…
1813.4 Installation. ¶
1813.4 Installation. VSCs shall be installed with vibratory probes. Vertical columns of compacted unbounded aggregate shall be formed through the soils to be improved by adding gravel near the tip of the vibrator and progressively raising and re-penetrating the vibrator, which will results in the gravel being pushed into the surrounding soil. Gravel aggregate for VSCs shall be well graded with a maximum size of 6 inches and not more than 10 percent smaller than [3] / 8 inch after compaction.
1813.5 Construction Documents. ¶
1813.5 Construction Documents. Construction documents for VSCs, at a minimum, shall include the following: 1. Size, depth and location of VSCs. 2. The extent of soil improvements along with building/structure foundation outlines. 3. Field verification requirements and acceptance criteria using CPT/SPT. 4. The locations where CPT/SPT shall be performed. 5. A Testing, Inspection and Observation (TIO) program indicating the inspection and observation required for the VSCs. 18-36 2025 CALIFORNIA BUILDING CODE on Jul 18, 2025 11:14 AM (CDT) THEREUNDER. CALIFORNIA BUILDING CODE – MATRIX ADOPTION…