Skip to content

Part 2 — PURPOSE8641. - REMOVAL PERMIT.

8641.2. - PERMIT REQUIREMENTS.

Arcadia Building Code · 2026-07 edition · updated 2026-07-25 · Arcadia

The following requirements shall be complied with prior to the issuance of a Removal Permit:

(a)

Insurance. The removal permit applicant shall obtain and maintain a comprehensive public liability insurance policy for the entire time period of the move in an amount and in a form as required by the City Attorney. A certificate of insurance shall be provided to the City of Arcadia and approved by the City Attorney. The certificate of insurance shall stipulate that the insurance will not be cancelled, reduced or allowed to expire unless ten (10) day prior written notice is provided to the City of Arcadia and shall name the City of Arcadia, its officers and employees, as an additional insured.

(b)

Route Approval. The Removal Permit applicant shall obtain the approval of the City Engineer for the route, time and date of the move. In the event of an emergency, the City Engineer may require the use of an alternate route or the postponement of the move. In addition to the Removal Permit, a Transportation Permit shall be obtained from the City Engineer.

(c)

Utility Clearance. The Removal Permit applicant shall provide a certificate or other acceptable evidence to the City Engineer showing that each public utility company with facilities along the proposed route of the move has approved the route.

(d)

Disconnection of Utilities. The water, gas and electric utilities shall notify the Building Official that service has been abandoned.

(Amended by Ord. 2167 adopted 11-5-02)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Arcadia Building Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.