Part 4 — RESERVED›9575. - Supplemental submittal requirement.
9575.2. - Final review of project.
Agoura Hills Zoning Code · 2026-06 edition · updated 2026-07-25 · Agoura Hills
Within one (1) year following the final approval of the development plan, the applicant shall file for the final review of the project by filing the information required in chapter 6. The review process, in addition to its regular findings, shall determine whether the precise construction plans and precise landscape plans are in substantial compliance with the development plan, provided that any modification by the applicant does not involve a change of one (1) or more of the following:
A.
Violate any provision of this article;
B.
Vary the lot area requirements by more than ten (10) percent;
C.
Involve a reduction of more than ten (10) percent of the area reserved for the common open space and/or usable open space;
D.
Increase or decrease the floor area proposed by more than ten (10) percent;
E.
Increase the total ground area covered by buildings more than five (5) percent;
F.
An increase in the number of dwelling units.
If it is determined that the plans are not in substantial compliance, an amendment and/or a new development plan shall be filed and processed, as appropriate.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Agoura Hills Zoning Code
- Article IX — ZONING[1]
- Article IX — ZONING[[1]]
- Chapter 1 — INTRODUCTION
- Part 1 — CONTENT AND PURPOSE
- Part 3 — RV RESIDENTIAL-VERY LOW DENSITY DISTRICT
- Part 1 — PURPOSE AND DESIGN STANDARDS
- Part 3 — CS COMMERCIAL SHOPPING CENTER DISTRICT
- Part 11 — POM PLANNED OFFICE AND MANUFACTURING DISTRICT
- Part 9 — OS-DR OPEN SPACE-DEED RESTRICTED DISTRICT
- Part 1 — PURPOSE
-
▸ Part 4 — RESERVED
Overview- 9541. - Purpose.
- 9542. - Permitted uses.
- 9544. - Development standards.
- 9545. - Conditional uses.
- 9552.3. - Prohibited uses.
- 9553. - Special development standards area.
- 9562. - Permitted uses.
- 9574. - Density limitation.
-
▸ 9575. - Supplemental submittal requirement.
- 9576. - Development standards applicable.
- 9577. - Special standards.
- 9601.1. - Conformity to general provisions.
- 9602. - Provision of street dedication and improvements.
- Division 3 — UNDERGROUND FACILITIES[[16]]
- Division 5 — YARD STANDARDS
- Division 4 — OFF-STREET PARKING, LOADING AND LANDSCAPING
- Division 6 — NOISE REGULATIONS
- Division 7 — OAK TREE PRESERVATION GUIDELINES
- Division 8 — GUIDELINES FOR LANDSCAPING, PLANTING AND IRRIGATI…
- Division 3 — CONDITIONAL USE PERMIT
- Division 4 — RESIDENTIAL DENSITY BONUS[[20]]
- Division 7 — SITE PLANS/ARCHITECTURAL REVIEW
- Division 8 — TEMPORARY USES
- Division 9 — REVOCATION PROVISIONS
- Division 2 — DEVELOPMENT AGREEMENTS
- Division 4 — PUBLIC HEARING PROCEDURES
- Division 5 — ZONING TEXT AMENDMENTS
- Division 6 — DETERMINATION OF USES NOT LISTED
- Division 7 — RULES OF INTERPRETATION
- Division 8 — CERTIFICATE OF USE AND OCCUPANCY
- Division 9 — REASONABLE ACCOMMODATIONS