Section 45 – Renewable Electricity Production Credit

0726 Publ 5884 (PDF) · 2026-10-03 edition · updated 2026-10-04 · United States

Section 45 provides a production tax credit for production of electricity from qualified energy resources at a qualified facility during the 10-year credit period which is sold to an unrelated party. Section 45 is not available for facilities/properties placed in service after December 31, 2024 unless construction of the facility/property began before December 31, 2024. For example, wind energy facility/property placed in service in June 2025 could not be registered for section 45 if construction began in May 2025, but could be registered for section 45 if construction began in November 2024.

For facilities/properties that began construction after December 31, 2024, refer to Section 45Y.

Registration Section Field Field Description

Attestation
I confrm that a section 48
credit will not be claimed for
this facility/property for this
taxable period or any prior
taxable period.

Check box to attest statement is
true and valid.
Election Election Refer toTable 1 for election types available
based on entity type.
Important Dates Date Construction Began See "Important Dates"
Important Dates Date Placed in Service Date Placed in Service
Facility/Property
Location
Street Address See “Facility/Property Location”
Facility/Property
Location
City City
Facility/Property
Location
State State
Facility/Property
Location
ZIP Code ZIP Code
Facility/Property
Location
County County
Facility/Property
Location
Latitude Latitude
Facility/Property
Location
Longitude Longitude
Facility/Property
Information
Type of Facility/Property Select one of the following types for the
qualifed property being registered:
1) Closed Loop Biomass
2) Geothermal
3) Landfll gas
4) Marine and Hydrokinetic
5) Municipal solid waste
6) Open-loop biomass
7) Qualifed hydropower
8) Solar
9) Trash
10) Wind
Facility/Property
Information
Is the facility/property owned
by more than one taxpayer?
Confrm yes or no.
Facility/Property
Information
Additional Information, if any. Provide any additional information, if
necessary, that will help in this registration,
such as information regarding disregarded
entities/ownership relationship.

31

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — 0726 Publ 5884 (PDF)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.