Section 45 – Renewable Electricity Production Credit
0726 Publ 5884 (PDF) · 2026-10-03 edition · updated 2026-10-04 · United States
Section 45 provides a production tax credit for production of electricity from qualified energy resources at a qualified facility during the 10-year credit period which is sold to an unrelated party. Section 45 is not available for facilities/properties placed in service after December 31, 2024 unless construction of the facility/property began before December 31, 2024. For example, wind energy facility/property placed in service in June 2025 could not be registered for section 45 if construction began in May 2025, but could be registered for section 45 if construction began in November 2024.
For facilities/properties that began construction after December 31, 2024, refer to Section 45Y.
| Registration Section | Field | Field Description |
|---|---|---|
Attestation |
I confrm that a section 48 credit will not be claimed for this facility/ taxable period or any prior taxable period. |
Check box to attest statement is true and valid. |
| Election | Election | Refer toTable 1 for election types available based on entity type. |
| Important Dates | Date Construction Began | See "Important Dates" |
| Important Dates | Date Placed in Service | Date Placed in Service |
| Facility/ Location |
Street Address | See “Facility/ |
| Facility/ Location |
City | City |
| Facility/ Location |
State | State |
| Facility/ Location |
ZIP Code | ZIP Code |
| Facility/ Location |
County | County |
| Facility/ Location |
Latitude | Latitude |
| Facility/ Location |
Longitude | Longitude |
| Facility/ Information |
Type of Facility/ |
Select one of the following types for the qualifed property being registered: 1) Closed Loop Biomass 2) Geothermal 3) Landfll gas 4) Marine and Hydrokinetic 5) Municipal solid waste 6) Open-loop biomass 7) Qualifed hydropower 8) Solar 9) Trash 10) Wind |
| Facility/ Information |
Is the facility/ by more than one taxpayer? |
Confrm yes or no. |
| Facility/ Information |
Additional Information, if any. | Provide any additional information, if necessary, that will help in this registration, such as information regarding disregarded entities/ |