Skip to content

Notice 2023-29 describes certain

SECTION 3. MODIFICATION OF

Internal Revenue Bulletin 2024-16 · 2026-10-03 edition · updated 2026-10-04 · United States

NOTICE 2023-29

.01 Modification of the Nameplate Capacity Attribution Rule . Section 4.02(1) (b) of Notice 2023-29 is modified to read as follows:

(b) Nameplate Capacity Attribu- tion Rule . If an EC Project with offshore energy generation units has nameplate capacity but none of the EC Project’s energy-generating units are in a census tract, MSA, or nonMSA, then the Nameplate Capacity Test for such EC Project is applied by attributing all the nameplate capacity of such EC Project to: (i) any landbased power conditioning equipment that conditions energy generated by the EC Project for transmission, distribution, or use before the energy is transmitted to the point of interconnection (or in the case of an EC Project with multiple points of interconnection, any land-based power conditioning equipment that conditions energy generated by the EC Project for transmission, distribution, or use before the energy is transmitted to one of the multiple points of interconnection); or (ii) any EC Project supervisory control and data acquisition (SCADA) equipment located in an EC Project Port. EC Project SCADA equipment is property owned by the taxpayer that owns the EC Project and is used to remotely monitor and control the EC Project’s operations. An EC Project Port is defined

2017 NAICS code Description
211 Oil and Gas Extraction
2121 Coal Mining
213111 Drilling Oil and Gas Wells
213112 Support Activities for Oil and Gas Operations
213113 Support Activities for Coal Mining
2212 Natural Gas Distribution
23712 Oil and Gas Pipeline and Related Structures Construction
32411 Petroleum Refneries
4861 Pipeline Transportation of Crude Oil
4862 Pipeline Transportation of Natural Gas

Bulletin No. 2024–16 879 April 15, 2024

(2) Appendix B to Notice 2023-29 provided the list of MSAs and nonMSAs that meet the Fossil Fuel Employment threshold described in § 45(b)(11) (B)(ii)(I) and section 3.03(2) of Notice 2023-29. Appendix 1 to this notice is a list of additional MSAs and non-MSAs that meet the Fossil Fuel Employment threshold described in Notice 2023-29 after including the two additional NAICS codes. Appendix 1 to this notice, Appendix B to Notice 2023-29, and Appendix 1 to Notice 2023-47 together provide the full list of MSAs and non-MSAs that meet the Fossil Fuel Employment threshold applicable to the period beginning on January 1, 2023.

(3) Appendix 2 to Notice 2023-47 is a list of MSAs and non-MSAs that qualify as energy communities because they meet the Fossil Fuel Employment threshold and have an unemployment rate at or above the national average unemployment rate for calendar year 2022 as described in § 45(b)(11)(B)(ii)(II)

and section 3.03(3) of Notice 2023-29. Appendix 2 to this notice is a list of additional MSAs and non-MSAs that qualify as energy communities after including the two additional NAICS codes. Appendix 2 to this notice and Appendix 2 of Notice 2023-47 together provide the full list of energy communities in the Statistical Area Category for the period beginning on January 1, 2023. As provided in section 3.03(3) of Notice 2023-29, the energy community status for the MSAs and non-MSAs listed in Appendix 2 of Notice 2023-47 and Appendix 2 of this notice is effective as of January 1, 2023, and that status will continue until the list is updated based on unemployment rates for calendar year 2023.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Bulletin 2024-16

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.