SECTION 6. DRAFTING
Internal Revenue Bulletin 2013-20 · 2026-10-03 edition · updated 2026-10-04 · United States
Sections in this part
INFORMATION
The principal author of this notice is Brian J. Americus of the Office of Associate Chief Counsel (Passthroughs & Special Industries). For further information regarding this notice contact Brian J. Americus on (202) 622–3110 (not a toll-free call).
before January 1, 2014 (see Example 1 in section 5.03(3)(a)).
(2) Single facility . If the total cost of a single facility that is not a single project comprised of multiple facilities (as described in section 4.04(2)), and cannot be separated into smaller facilities, exceeds its anticipated total cost so that the amount a taxpayer actually paid or incurred with respect to the facility before January 1, 2014, is less than five percent of the total cost of the facility at the time the facility is placed in service, then the taxpayer will not satisfy the Safe Harbor with respect to any portion of the facility.
(3) Examples - (a) Example 1 . A taxpayer incurs $25,000 in costs in 2013 constructing a five-turbine wind farm that will be operated as a single project (as described in section 4.04(2)), anticipating that each turbine (including its own tower and pad) will cost $100,000 for a total cost for the facility of $500,000. Thereafter, the taxpayer makes continuous efforts to advance towards completion of the facility. At the time the taxpayer places the
wind farm in service, the actual total cost of the facility amounts to $600,000, with each turbine costing $120,000. Although the taxpayer did not pay or incur five percent of the actual total cost of the facility before January 1, 2014, the taxpayer will be treated as satisfying the Safe Harbor with respect to four of the turbines, as their actual total cost of $480,000 is not more than twenty times greater than the $25,000 in costs incurred by the taxpayer in 2013. Thus, the taxpayer may claim the PTC on electricity produced from four of the turbines, or the ITC based on $480,000, the cost of four of the turbines. Alternatively, if construction of the facility began (within the meaning of section 4.01) before January 1, 2014, the taxpayer may be able to claim the PTC or the ITC with respect to the entire facility (all five turbines).
(b) Example 2 . A taxpayer incurs $25,000 in costs in 2013 in constructing an open-loop biomass facility, anticipating that the total cost of the facility, including one boiler and one turbine generator, will be $500,000. The boiler and turbine
May 13, 2013 1088 2013–20 I.R.B.