SEC. 10. EXTENSION OF TIME
Internal Revenue Bulletin 2000-47 · 2026-10-03 edition · updated 2026-10-04 · United States
.01 An extension of time to file may be requested for Forms 8027, 1099, 1098, 5498, W-2G, W-2, and 1042-S. .02 Form 8809, Request for Extension of Time To File Information Returns, should be submitted to IRS/MCC. This form may be used to request an extension of time to file information returns submitted on paper, magnetically or electronically.
.03 Requesting an extension of time for multiple employers may be done by submitting Form 8809 and attaching a list of the employer names and their TINs (EIN or SSN). The listing must be attached to ensure the extension is recorded for all employers. Form 8809 may be computer-generated or photocopied. Be sure that all the pertinent information is included.
.04 Requests for extensions of time for multiple employers will be responded to with one approval letter, accompanied by a list of employers covered under that approval.
.05 As soon as it is apparent that an extension of time to file is needed, Form 8809 may be submitted. When granted, the extension will be for 30 days. It will take a minimum of 30 days for IRS/MCC to respond to an extension request. Under certain circumstances, a request for an extension of time could be denied. When a denial letter is received, any additional or necessary information may be resubmitted within 20 days. When requesting an extension of time, do not hold your files waiting for a response .
.06 While very difficult to obtain, if an additional extension of time is needed, a second Form 8809 must be submitted before the end of the initial extension period. Line 7 on the form should be checked to indicate that an additional extension is being requested. A second 30-day extension will be approved only in cases of extreme hardship or catastrophic events.
.07 Form 8809 must be postmarked no later than the due date of the return for which an extension is requested. If requesting an extension of time to file several types of forms, use one Form 8809, but the Form 8809 must be postmarked no later than the earliest due date. For example, if requesting an extension of time to file both Forms 8027 and 5498, submit Form 8809 postmarked on or before the last day of February.
.08 If an extension request is approved, the approval letter should be kept on file. The approval letter or copy of the approval letter for extension of time should not be sent to IRS/MCC with the magnetic/electronic file. When submitting Form 8027 on paper only to the Andover Service Center, attach a copy of the approval letter. If an approval letter has not been received, send a copy of the timely filed Form 8809.
.09 Request an extension for only one tax year. .10 The extension request must be signed by the employer or a person who is duly authorized to sign a return, statement or other document for the employer.
.11 Failure to properly complete and sign the Form 8809 may cause delays in processing the request or result in a denial. Carefully read and follow the instructions on the back of the Form 8809.
.12 Form 8809 may be obtained by calling 1-800-TAX-FORM (1-800-829-3676).
Note: AN EXTENSION OF TIME TO FILE IS NOT AN EXTENSION TO ISSUE FORM W-2 TO THE EMPLOYEE .
.13 Request an extension of time to furnish the statements to recipients of Forms W-2 by submitting a letter to IRS/MCC containing the following information:
(a) Employer name (b) TIN (c) Address (d) Type of return (W-2) (e) Specify that the extension request is to provide W-2 statements to recipients. (f) Reason for delay (g) Signature of employer or person duly authorized. Requests for an extension of time to furnish the statements for Forms W-2 to recipients are not automatically approved; however, if approved, generally an extension will allow a maximum of 30 additional days from the due date to furnish the statements to the recipients. The request must be postmarked no later than the date on which the statements are due to the recipients.
November 20, 2000 496 2000–47 I.R.B.
Get a plain-English answer with a citation back to this text.
Ask AI about this code