Section 20. Exempt Organization and Employee Plan Applications for Extension of Time to File›3.11.20 Exempt Organization and Employee Plan Applications for Extension of Time to File›Note:
Section 01
Internal Revenue Manual Part 3. Submission Processing · 2026-10-03 edition · updated 2026-10-04 · United States
Listed below are the contents of Section 01.
Section 01
Field
Length
Title
Location
RMIT
11
Remittance
Form 8868 Part II, Line 3c or Form 8868 Part III line 1b
01NC
4
Name Control
Name Line
4
Name Control Underprint
N/A
01TIN
9
Taxpayer Identification Number
Taxpayer identification number box (TIN).
01TNT
1
TIN-Type
End of TIN (Edited on SSN only).
01TXP
6
Tax Period
Upper right margin.
2
Tax Period Underprint
N/A
01MFT
2
MFT Code
Generated based on the Return Code.
01PL
3
8868 Plan Number
Plan Number line.
01RCD
8
Received Date
IRS date stamp in center of form
01TTX
16
Reserved
Not transcribed - always zero filled
01CRT
16
Reserved
Not transcribed - always zero filled
01CCC
1
Computer Condition Code
Top center margin
01RGC
1
Group Code
Edited in the margin to the right of "If this is for a Group Return."
01RTC
1
Return Code
Return Code is transcribed from the Return Code box below the name and address section.
01CAF
1
CAF Indicator
No longer edited.
01NOT
1
Notice Code
Top center margin
Get a plain-English answer with a citation back to this text.
Ask AI about this code